RECONSTRUCTION OF County Route 1, Golden Shores Pkwy & Oatman Highway Public Information Meeting Golden Shores Senior Center Tuesday, June 3, 2015.

Slides:



Advertisements
Similar presentations
Bob Vasek Cooperative Agreements Engineer Mn/DOT Metro State Aid Overview and Planning and Programming Tom Leibli Cooperative Agreements Project Manager.
Advertisements

Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014.
HSM: Celebrating 5 Years Together Brian Ray, PE Casey Bergh, PE.
Titusville to Edgewater Bike Loop PD&E Study
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
US 101 Corridor Mobility Master Plan Agenda Item B-1 San Luis Obispo Council of Governments Board Meeting August 6, 2014 – B-1.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
T.H. 23 / South Saratoga Street Reduced Conflict Intersection and Pedestrian Overpass Project Project hearing October 14, 2014 City Council Presenters.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
Feasibility Study FOREST GLEN PASSAGEWAY April 10, Isiah Leggett Montgomery County Executive Arthur Holmes, Jr. Director Department of Transportation.
Mesa & Cincinnati Presentation to City Council June 19, 2007.
Multi-Modal Transit Center at Taylor Street: Project Overview and Uses for the Upper Floors Public Forum October 16, 2013.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
Control Schedule Behind the screen. Proactive – Projects & FFS codes anticipated need 2 years from now and next year. Reactive Project & FFS codes needed.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development.
Highway 169 Phase 2 (Part 2) – Cross Range Expressway April 30, 2014 Public Information Meeting Taconite Community Center.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Land Use Study for the Community of Winchester July 9, 2012.
Odd Fellows Road Interchange and Roadway Improvements Citizen Information Meeting April 15, 2015.
Alachua County Future Traffic Circulation Corridors Map Project July 10 th, 2007.
All Roads Transportation Safety (ARTS) Program Hot Spot ODOT Region 1 Kick-Off Meeting March 18, 2015.
May 1, 2014 East Gude Drive Pedestrian Road Safety Audit Stakeholder Pedestrian Safety Meeting.
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
PROJECT UPDATE PUBLIC OPEN HOUSE #3 OCTOBER 17 4:30 PM – 6:30 PM Dakota County Northern Service Center.
1 INTERCHANGE SELECTION CE 550 SPRING OBJECTIVE Identify types of interchange by function and geometry Learn process for optimizing the type of.
Quality Avenue “Safe Streets” Improvements City of Lakeland, Minnesota Paul Pinkston Hamline University August 18, 2015.
T.H. 23 / SOUTH SARATOGA STREET REDUCED CONFLICT INTERSECTION AND PEDESTRIAN OVERPASS PROJECT PROJECT HEARING June 10, 2014 City Council Presenters Glenn.
High Desert Corridor -New State Route 138/E-220 Agency coordination Meeting March 2011 “We’re here to get you there!”
STA Safety Project PID #76439 December 12, 2006.
Exit 17 Transportation Plan August 22, 2006 Exit 17 Transportation Plan Prepared for: Town of Colchester and CCMPO August 22, 2006 Selectboard Meeting.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Public Open House - July 10, 2007 WELCOME. Objective of Tonight’s Open House Provide background information on the project Introduce primary work elements.
County of Fairfax, Virginia Department of Transportation VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next Steps Board Transportation.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
US 25 Corbin to London Citizens Advisory Committee Meeting December 2011.
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
Evaluating Project Alternatives Topics Feasibility Studies Alternatives Studies Reading Assignment Textbook – Appendix C.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Former DuPont Barksdale Works Project Update July 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
August 19, 2015 Port Bienville Rail EIS Scoping Meeting Presented by: Rhea Vincent Mike McGuire.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
EASTSIDE ACTIVITY CENTER DRAFT MASTER PLAN Board of County Commissioners January 22, 2008.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
INTEGRATING ASSESSMENT OF THE ECONOMIC BENEFITS OF TRANSPORTATION IMPROVEMENTS IN PROJECT-LEVEL ALTERNATIVES ANALYSIS Meiwu An, Pikes Peak Area Council.
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 8 December 3, 2015.
I-35W/Highway 62 Crosstown Commons Reconstruction Nathan Aul, Bob Krussow, and Michael Martin.
Virginia Street Bus RAPID Transit Extension City of Reno Council Meeting April 29, 2015.
SR 44 at Grand Avenue Volusia County, FL River to Sea CAC/TCC Meetings May 17, 2016.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
Smyrna’s Major Thoroughfare, Bicycle, and Pedestrian Plan TOWN COUNCIL RETREAT APRIL 14, 2015.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
Multnomah County Central Courthouse Site Due Diligence Update April 9, 2015 JD Deschamps Mike Pullen Mike Day.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Public Information Meeting NW 100th Street Reconstruction Project
Issaquah-Fall City Road
Presentation transcript:

RECONSTRUCTION OF County Route 1, Golden Shores Pkwy & Oatman Highway Public Information Meeting Golden Shores Senior Center Tuesday, June 3, 2015

Agenda Purpose of Project Scope of Project Roadway Circulation Private Property Impacts Environmental & Right-of-Way Constraints Funding Schedule & Public Involvement Plan

Purpose of Meeting Inform you of the project No alternatives have been developed We have started to identify restraints and fatal flaws Obtain your feedback

Scope of Project How did the project come about … via a “safety study” Preliminary Design o 1) Study o 2) Scoping, with 2 PIM’s Final Design, with 1 PIM Construction

Project Overview Map County Route 1 / Golden Shores Pkwy / Oatman Hwy

Scope of Project Reconstruct “Six Points” Intersection Reconstruct Powell Lake Road & Oatman Highway Intersection Eliminate CR 1 between Powell Lake Road and Oatman Highway Cul-de-sac Golden Shores Pkwy

Roundabout Concept

Thru-about Concept

Conventional Intersection Concept

Scope of Project Maintain Business Access Maintain Bike & Pedestrian Circulation Right-of-Way may be Required Alternate Routes Possible Using Adjacent Streets

Roadway Circulation Roundabout, thru-about & conventional layouts (?? - show sample of each) Screening … o fatal flaws o Potential closures (roundabout most restrictive, conventional least restrictive, thru-about in between)

Private Property Impacts Access – note how alternatives may impact vehicular, bike and pedestrian access o Properties along Powell Lake Road, between County Route 1 & Oatman Highway o Station in the southwest corner of County Route 1 and Powell Lake Road

Environmental and ROW Constraints or Fatal Flaws Funding – alternative concepts must meet minimum benefit/cost ratios Environmental – certain activities include outside agency reviews whose time may not be completed in time … Right-of-Way – acquiring private lands may not be completed in time to use time sensitive funding

Funding … 100% funded with roundabout and possible the thru-about Design & construction Funding. –Design$827,841 –Construction$1,202,439

Schedule & Public Involvement Meeting PIM No. 1 6/3/15 PIM No. 2 7/1/15 Study to 7/10/15 PIM No. 3 Fall, 2015 Scoping (Eng. & Env.) to 2/19/16 Design to 6/10/16 Construction Fall 2016 or Spring 2017