Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.

Slides:



Advertisements
Similar presentations
Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
Advertisements

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Forward Detector Meeting, 11 Mar 2003Børge Svane Nielsen, NBI1 Si-FMD status Forward Detector meeting, CERN, 11 March 2003 Børge Svane Nielsen Niels Bohr.
WACH4 26/11/2002Julien Cogan CERN/EP/CMA-1- M0 COOLING IN H4 Cooling is a key issue : –APD gain : ~ -2.4 % /  C –XTAL response (scintillation) : ~ -1.9.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of construction, assembly, integration Production: - Ladder integration - Installation on planes Inner tracker assembly:
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
Marc Anduze – 09/09/2008 News on moulds and structures CALICE meeting - Manchester.
PCB issues requirements & procurement MMM Würzburg, 30/01/2014J. Wotschack1.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
1 E906 Pre-Amplifier Card 2009/10/07. 2 E906 Wire Chambers Station1 MWPC: –build a new E906 MWPC. –4500 channels in total. Station2 DC: –recycle old E866.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
Ulrich RaichAnnual Report Preparation Meeting GSI January 2006 Progress report for Task SIS100_5 Digital Signal-Analysis Electronics for Beam Position.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Compressor status AWAKE Technical Board meeting 19 August 2015.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 1 EE Design Status D Cockerill CERN 19 July 2006.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Status of NA62 straw electronics Webs Covers Services Readout.
Givi Sekhniaidze1 CERN, 25 March Givi Sekhniaidze2 The angles for the chambers are: LM1 – ° LM2 – 7.224° SM1 – ° SM2 – ° Do we.
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
1 October 2003Paul Dauncey1 Mechanics components will be complete by end of year To assemble ECAL, they need the VFE boards VFE boards require VFE chips.
Detector Cooling CERN, September 28, 2006 Jaak Lippmaa HIP, University of Helsinki.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
M. Sannino for S. Cuneo - I.N.F.N. Genova1 Rich2 MAPMT Housing & Cooling Outdated designs and what is needed to get a final executive design Imperial College.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
V. Bobillier1 Cable installation status.
TBTS Test Program & Schedule G. Riddone
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
MOTHERBOARD AND ITS COMPONENTS PRESENTED BY- Md. DANISH HEMLATHA J SUSHMITHA RAJ N GIRIRAJ. D ABHIRANJAN SINGH
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Status report on the development of a TPC readout system based on the SALTRO-16 chip and some thoughts about the next step Leif Jönsson AIDA Meeting Vienna.
AMS Tracker Meeting17/10/05 Eric Perrin (GE) Tracker mechanics at Uni -Ge Safety issues Assembly Still to be made.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding.
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
CONCEPTUAL DESIGN OF D2 MECHANICAL STRUCTURE (DOUBLE COLLARING OPTION) S. Farinon, P. Fabbricatore (INFN-Sezione di Genova) Sept. 24 th 2015.
HE NgCCM integration issues Ianos Schmidt, August 26, 2015.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
Meeting CERN 28 Nov A.B.Lodge - RAL 1 ECAL CMS ECAL Mechatronics Task Force Meeting.. CMS ECAL Mechatronics Scheme Applicability to EE Meeting held.
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
A.Ryazantsev, IHEP-Protvino, RussiaPANDA Russia Workshop at Moscow, May 2015 Status on Barrel Mechanics Andrey Ryazantsev on behalf of the IHEP-Protvino.
Marc Anduze first drawings of Ecal eudet module COPIED FROM : Marc Anduze PICTURES FROM : CALICE/EUDET electronic meeting – CERN – 12 July 07.
Answers to Barcelona questions about Mini-Drawers and comments Tilecal upgrade meeting CERN (24 June 2013) François Vazeille on behalf of Roméo Bonnefoy,
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Profiler Mechanics Update
TileCal upgrade EVO meeting Demonstrator tesks
Mini-drawers, FE-ASIC , Integrator
MicroMegas Mechanical Meeting --- Cern April 2014
III. Correction Dipoles MDG Accessories for all Magnets V. Summary
Presentation transcript:

Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule

Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA2 Presentation Development plan Milestones Tasks to be completed Schedule Base line

Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA3 Development plan SM0 and SM1 as prototype to go in H4 beam SM2 and SM3 as pre serial production Production begins at SM4 SM0 and SM1 probably need retrofitting

Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA4 Milestones SM0 has to be ready for H4 beginning of July 03 –SM0 cooling has to be available beginning of May Serial calibration from March 2004

Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA5 Tasks Preliminary design –Aim: study of the cooling mechanics principle Choice of the principle of the cooling: –Performed during 26 November Task Force –Agreement about cooling principle Prototype drawings –Duration: 2 months –Drawings for material to be installed in SM0 for test beam in 2003

Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA6 Tasks (2) SM0 and SM1 manufacturing –Duration: 3 months –2 SM in order to be able to mount a second electronic solution when 1 SM is in test beam Prototype mounting and tests –1 month for some adjustments –Tests: Leak tests Flow equilibrium between modules Thermal performances

Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA7 Tasks (3) Serial drawings –Ended after prototype mounting and tests –some minor modification can be made during tendering Market survey –Cooling bars manufacturing is a special technique: it will probably require a market survey –Has to be launched as soon as possible –Typically 6 months duration

Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA8 Tasks (4) Tendering and ordering –Typically 2 months Pre serial manufacturing –2 SM: SM2 and SM3 –Needs the mould development (2 months at least) –Pre serial production needed at least for mechanical fit checks. –After the mounting, drawings corrections (if needed) then agreement about the serial production

Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA9 Schedule

Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA10 Base line Information coming from the electronic group have been used as the base line in the design. This information becomes requirements now to the electronic. Changing any base line data will impact the cooling mechanic schedule Some information is still needed to finalize the design. Answers are urgent in order to avoid delays.

Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA11 Requirements VFE boards: –Maximum card dimensions (card nose excluded) 114 mm x 78 mm –Card nose width < 80 mm (to MB or to FE) –Maximum component height: 2,3 mm –Possible to fix the card to housing with 6 M3 screws (at least 2 very closed to card nose to MB) –8 Watt dissipation on the card

Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA12 Requirements LVR board –Same dimensions as VFE cards for the PCB –Same possibility to fix it to the housing Mother board –Modularity: 1 per trigger tower –Maximum size 104 x 110 mm2 –Self sustaining –Connector to VFE cards compatible with 0,3 mm position error and insertion movement of the VFE card –Connector positioning on the card +/- 0,05 mm

Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA13 Requirement FE board –In an horizontal plane –3 Watt dissipation (for 1 trigger tower) –Connector to VFE cards compatible with 0,3 mm position error of the VFE card –Connector positioning on the card +/- 0,05 mm

Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA14 Missing information Mother board design –Type of connection between mother board and APD connectors –Maximum length of this connection –Thickness of the board: are there passive components to take into account? –Type of connectors, guiding needed or provided by the connector

Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA15 Missing information VFE board –Kind of connector on VFE board –Fixation holes location –Layout of the components LVR board –Same information as for VFE board –Connection to the bus bar –Connection to the FE board

Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA16 Missing information FE board –Type of connection to VFE board –Maximal dimensions –Possibility to cool it down –Mechanical fixation Token ring board –Not yet taken into account in the design –No information available