Status of Torino-Dubna Production Aluminum Plates production: Torino: steady production ongoing, 2715 plates cut, 194 chambers=48MB1.

Slides:



Advertisements
Similar presentations
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Advertisements

TPC meeting, NBI, 2-3 September 2002Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, Copenhagen, 2-3 September 2002 Børge Svane Nielsen, Jørn.
Sandblasted, repainted fender brackets. Mudflaps and rubber buttons to attach them.
IE 337: Materials & Manufacturing Processes
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
, CLIC Test Module Meeting Status of the DB Quad adjustable support design Mateusz Sosin CLIC Module WG Meeting, 22-May-2013.
Special Report NuMI Target Updates Special Report NuMI Target Updates Ongoing Work - Four Parallel Activities I.Target Hall We expect to move NT-05 to.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
Nov. 7 report LIU Qian. This morning we installed 6 fibers: fiberPMT 39AOut layer 3 39BInner layer 3 39COut layer 4 39DInner layer 4 39EOut layer 5 39GOut.
1 Installation of Delphi Frame  ITS Installation.
Dean R Walters Chamber and Bellows Jan. 5, Summary Chamber The plan is to construct a chamber made of 316LN stainless steel with.
TRD Status meeting HeidelbergClemens Adler Chamber production Production status/ Material status.
MM mechanical prototype Work progress at CERN MicroMegas General Meeting, CERN, 5-6 November
Status report for Helium bag and Gauss meter installation for D Hiroshi Kou.
Leaf Spring prototype preparation M.Lenti. Reminder Piet’s proposal: two dowels inserted into two mirror holes (vertical alignment); mirror weight as.
MM mechanical prototype Work progress at CERN MMM Rome, 15/07/20131.
1 Warm Magnets Work Package Status J. Bauche, TE-MSC Technical Meeting, 9th January 2014.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
1 IBL Integration Activities & Future plans  Overall FEA on Geneva (in convergence with Seattle)  News from IST Composite Design  Integration.
MUON_EDR-06 (Alignment) Enrique Calvo Alamillo February 28-March 1, 2002 Link Mechanics: Status.
Upgrade news and Proposed interventions during YETS for the Muon Barrel Alignment Szillási Zoltán, Béni Noémi (ATOMKI ) This project is supported by Hungarian.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Presented To You By BELT MAINTENANCE GROUP The Project THE WORLD’S LONGEST SINGLE FLIGHT CONVEYOR SYSTEM 40.6 KM OF 36” WIDE ST900 STEEL CORD CONVEYOR.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
G.Sirri – INFN Bologna Videoconf Gluing machine New solution under test: rigid plastic frame instead of lateral tapes and.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
1 Booster Corrector BPM Status AD/ Instrumentation Jim Fitzgerald.
GTSTRUDL Using the GTSTRUDL Base Plate Wizard Example of Creating and Analyzing a Base Plate Rob Abernathy CASE Center GTSUG June, 2009 Atlanta, GA.
F. Sabatié Slides from D. Attié, S. Procureur June 18 th, 2014 Forward-Tagger Tracker – Status & Plan – – Status & Plan –
1 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL Teleconf.
Zian Zhu The Tension/Pitch Machine Status and Anode Panel Measurements The Strip Capacitance Meter Status and Measurements Production Readiness Review.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
09/07/20021Muon Meeting Status of MWPC activities at CERN and PNPI Outline: Module 0 status and plans –M3R1 (CERN) –M3R2 (CERN) –M3R4 (PNPI) Tooling status.
Introduction Straw Working group meeting CERN group 1 NA62 Collaboration meeting, Brussels 7-10/9/2010.
FourStar Status Eric Persson (OCIW) Presented By.
ATLAS Pixel Detector July 2003 SC Pixel Meeting N. Hartman LBNL 1 Pixel Support Tube WBS Santa Cruz Cost Workshop July 9, 2003.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
LARP Collaboration Meeting Racetrack Coil Fabrication
ATLAS Pixel Detector July 2003 Insertion Device Costs A. Smith, LBNL 1 Insertion Device Costs Overview US Pixel Meeting July 9, 2003.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding.
Half cells for SCRF Cavity - shape ~ 900 mm End cellIntermediate cell.
Sample Pictures with Fringe Projection 3D-Surface ProfilingSample Surface Holes were covered with sticker Black markers do not affect the results.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Planning for Proto-DUNE PD Installation and Cabling at CERN
S.Movchan Straw manufacturing and QC
Update on Pavia MM mechanical prototype
new straw end plug: D=10.6 mm straws support frame Levan option
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
PANDA Yoke of the Magnet
Status of straw production straw module assembling
CMS WEEK Sept. 24 Opening session CMS MUONS: Barrel Drift Tubes
Work packages status in Torino and perspectives
Status Brussels GANTRY
Status of the PANDA Solenoid Magnet Production in BINP
Gluing machine A semi automatic machine to glue emulsion plate on adhesive tape (as done by Japanese colleagues) was realized and delivered to Bologna.
Status of the PANDA Solenoid Magnet Production in BINP
Crab – RFD prototype: Fabrication Status Update
Presentation transcript:

Status of Torino-Dubna Production Aluminum Plates production: Torino: steady production ongoing, 2715 plates cut, 194 chambers=48MB1 +54MB2+50MB3+41MB4). Dubna: steady production ongoing. Plates for 34 MB1, 40 MB2, 39 MB3, 3 MB4 produced insofar (116 total). Time estimated to complete full production + spares march 2005 (as specified in the contract).

Status of Torino-Dubna Production Position Quality of strip production: stable since change of strip deposition head in august Plate MB1 n pixel = 0.106mm

Status of Torino-Dubna Production HV test performance of strip production: Plates which pass 1 st HV test 84% Last plate of the day left under HV test during the night, 10 hours. No extra bad plates found so far.

Status of MB4 Production Preparation Production of FE and HV SL frames ongoing in Torino. 20 MB4 HV side + 9 FE side frames produced.

Status of MB4 Production Preparation Plotter Y axis supports 99% ready for table installation. Completion expected by delivery of last part (rails protective tape fixations).

Status of MB4 Production Preparation Inflatable tube (2.5m,  =7.5mm) Elastic rubber Commercial profile I beam tool drawings (P.Mereu) 12.7 mm ALCOA support OPEN CLOSED

Status of MB4 Production Preparation Final prototype executive drawings ready Torsion springs Rails Movable locating block

Status of MB4 Production Preparation Main Structure: Rohacell Sandwich Thickness 500mm Load 5000N

Status of MB4 Production Preparation