SPS re-commissioning with beam K. Cornelis PS-SPS days.

Slides:



Advertisements
Similar presentations
Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
Advertisements

IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
BI Outlook for BI Day 2012 Based on latest (last Monday) feedback from EN/EL XXX As foreseen originally Partially ‘As foreseen originally‘ Postponed.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Injection test? Mike Lamont For initial discussion.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
SPS Beam Loss System The SPS Beam-Loss System Hardware: Gianfranco Ferioli Software: Lars K. Jensen CERN SL/BI SL/OP Linkman: Antoine Ferrari.
LHC beams in the SPS in 2014 H. Bartosik, G. Rumolo, G. Iadarola With the help from K. Kornelis, V. Kain and SPS OP crew.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
B.O.S.S. SPS ring and transfer lines Serge Massot for BE-OP-SPS European Organisation for Nuclear Research CERN CH-1211 Genève 23 Switzerland 27/05/2014CERN.
LHC Utilities & Facilities WAO Daejeong 12/04 – 16/04/2010 Markus Albert on behalf of LHC Operations.
SPS RESTARTING AFTER LS1 05/03/2015 Stéphane Cettour Cavé.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
1 Beam Plans for Accelerator Systems: The Machine Protection System Jan Uythoven On behalf of the MPWG and the MPS Commissioning WG Special thanks to R.Schmidt,
1 Interlock logic for LHC injection: intensity limitations Jörg Wenninger AB-OP-SPS Outcome of the join Machine-Experiments Workshop on Machine Protection.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
PS and East Area re-commissioning with beam from the CCC after a 17 month shut-down R. Steerenberg with help of many colleagues from different groups PS.
ATC / ABOC Days 23 Jan LHC injector Chain, E.A., Facilities. MTTR, spare parts and stand-by policy for BI equipments J.Tan AB/BI on behalf of BI.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
Schedule IT General Schedule 9 th, September 09 Today.
‘Review’ of the machine protection system in the SPS 1 J. Wenninger BE-OP SPS MPS - ATOP 09.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
Overview Extraction tests: TT40 and TT60, week 21 –controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity,
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
MG - APC meeting 29/02/20081 MTE commissioning strategy and requirements M. Giovannozzi What is needed to implement MTE ScheduleCommissioning Acknowledgements:
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
19 January 2006 PS&SPS DAYS AD equipment tests and startup with beam Slide 1 AD and AD experimental areas: equipment tests and startup with beam Tommy.
1 Machine Checkout and Setup Periods Jan Uythoven Thanks to: O.Aberle, R.Bailey, F.Bordry, O.Brunner, L.Bottura, E.Carlier, P.Charrue, E.Ciapala, S.Claudet,
PSB H - injection system commissioning J.Borburgh, C.Bracco, C.Carli, E.Carlier, B.Goddard, K.Hanke, B.Mikulec, J.Hansen, C.Maglioni, A.Newborough, D.Nisbet,
14/01/2005M. Giovannozzi - PS-SPS Days1 When can we have a clean Multiturn Extraction from the PS? M. Giovannozzi M. GiovannozziContentIntroduction Summary.
LHC 8 & 9 May :10: Injection kicker B1 faulty on oil level –Check in UA and RA. Leaks fixed, to be further checked in TS1 10:30: Pre-cycle started.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
LIU-Ions overall status and outlook: LEIR H. Bartosik for the LIU-IONS LEIR team* with lots of material from “Beam dynamics studies on LEIR”, H. Bartosik,
1 TI 8 LHC SPS LSS6 IR2 TT41 LSS4 IR8 TI 2 TT60 TT40TT20 LSS2 LSS1 TT10 Mobile dump block (TED) Targets T2, T4, T6 Target T40.
ApEx needs for CeC PoP Experiment December 11, 2015.
Reminder of upcoming milestones For all machines: Nov. 2012:Table of performance parameters Jan. 2013: Baseline activities defined Feb. 2013: Update APT/EVM.
MTE commissioning status S. Gilardoni, BE/ABP With C. Hernalsteens and M. Giovannozzi.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
LEIR re-commissioning and other operational aspects First ideas for new tools and organization First draft re-commisisoning plan H. Bartosik, A. Huschauer,
Readiness for RF capture Cavities – all 16 cavities commissioned with RF feedback loops closed klystron polar loop still to commission on 2 cavities 2.
PS - SPS Day 18-Jan-2006 PS Ring by Ray Brown.. 2.
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
SPS start up 2014 SPS OP. SPS changes during LS1 New transformers and 18kV cables for MPS. New function generators (FGC’s) with lots of new and different.
SPS Applications Software issues - startup in 2006 and legacy problems
DRY RUNS 2015 Status and program of the Dry Runs in 2015
Wednesday 8.9 External crossing angles:
Minimum Hardware Commissioning – Disclaimer
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
Installations up to Start of Commissioning
The LHC - Status Is COLD Is almost fully commissioned
Instrumentation for SPS 2006 restart
-9:00: Test IP transverse adjustment (CMS) and optics verification.
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Summary of week 7 Hardware Commissioning:
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Interlocking of CNGS (and other high intensity beams) at the SPS
SPS Transverse Damper System
Hall C Hot Check Out Process
CLIC damping rings working plan towards the CDR
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
The LHC Beam Interlock System
ThomX – Commissioning Meeting – 25/01/2018
15/12/2009 Vacuum interlock in sector 78 understood  out-gassing of a Penning gauge ignited as a result of ionization or dust arcing In conclusion: NO.
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
Presentation transcript:

SPS re-commissioning with beam K. Cornelis PS-SPS days

The 3 ingredients for a successful startup 1. A good cold check out 2. A good cold check out 3. A good cold check out Everything that can be checked must be checked HOWEVER

Certain things can only be checked with beam.  Aperture and obstacles in vacuum chamber.  The well functioning of beam instruments.  Alignment.  Feedbacks.  Conditioning with beam.  Optics checks and matching

Boundary conditions  New control room  New software  New hardware  New interlocks  Modified access system  A long shut-down.

The new control room  Available as from beginning of February.  Will be used for North area cold run  Will be used for cold check out so that operators will become acquainted with it.

New Software  Equipment level : SL-EQUIP to FESA MASTER TIMING MASTER TIMING  Application soft : C-tree to ORACLE Wilkie to LSA TZ to LSA Worries : -Will software be ready? (under development) -The bugs -We have to know How to use it

Interlocks Interlocks  New Hardware Interlock crates in BA1, BA4, BA6.  Software interlock system : equipment calls.

Access Access  Locks on equipment doors.  Emergency stop connected to some zone limiting doors.

Commissioning with beam (TT10)  Re-alignment in TT2  Low beta for stripping (Check matching) Tools : BPM’s, profile monitors, screens

Injection  Tools : Kicker timing, OASIS, BCT TT10, MOPOS first turn.

RF capture and acceleration  New timing modules in RF-cage  Re-commissioning and tuning the loops is a lengthy job done by specialists.  Several iterations needed, interleaved with transverse work. Tools : Soft to control timing modules, longitudinal PU‘s, OASIS, first turn and orbit measurements.

Closed orbit  Half of the orbit PU‘s were modified during shutdown (polarity checks) Tools : CO software and analysing algorithms

Alignment  Important for SE (orbit in sextupoles and limited bumper strength)  We need accelerated beam Tools : Closed orbit Assistance from magnet people and geometers.

Aperture  For the CNGS beam we need full aperture. Tools : Closed orbit, beam loss monitors Assistance from vacuum group in case obstructions are found.

Transverse feedback  No major changes but power amplifier was taken out during shutdown for protection. Tools : Q-meter, OASIS.

Slow extraction  TZ software replaced by LSA  Spill feedback moved from PCR to BA1  The resonant extraction magnifies all the errors in the machine so it must be done once the machine is ‘cleaned-up‘  Takes a few hours if all the tools are available and working well.  If NOT, it can take a shift or more Tools : closed orbit monitors, RF timing module control, profile monitors, control of the extraction elements.

TT20  Certain alignments were done during shutdown.  Tools : screens, position monitors, SSIS, profile monitors, orthogonal steering on splitters and targets.

Conditioning  New graphite beam dump in LSS1  RF cavities Tools : Vacuum monitoring available in CCC

North area  New controls at equipment and application level. (CESAR)  A cold run took place in November 2005 testing two secondary beam lines.  A new cold run will take place in March 2006 involving all the lines.  For commissioning with beam the EA team wants 3 days without physicists.

Conclusions  The different steps in the beam commissioning will take more setting up and checks due to the numerous changes.  Increased risk for ‘bad surprises‘.  New tools may have bugs, less functionality or be only partly ready.  We will need all the help we can get.