CLIC damping rings working plan towards the CDR

Similar presentations


Presentation on theme: "CLIC damping rings working plan towards the CDR"— Presentation transcript:

1 CLIC damping rings working plan towards the CDR
Yannis Papaphilippou March, 12th 2009

2 Working packages Basic lattice design
Linear imperfections and correction Non-linear dynamics and correction Injection and extraction Super-conducting wiggler design Magnet systems Collective effects (including IBS) Vacuum systems RF systems Instrumentation Power system System integration and parameters 12/03/2009 CLIC DR meeting

3 Damping ring energy Evaluate the energy impact of the damping rings
Numerical tools Lattice design and non-linear dynamics Impedance estimation Participate in common experiments at test facilities IBS CESR-TA Low emittance SLS Resonance ATF, CESR-TA, Light Sources Communication Organize a workshop (winter ) Document common work in a working group report 12/03/2009 CLIC DR meeting

4 Basic lattice design Linear optics optimization including IBS
Working point and tunability Chromaticity correction and DA with sextupoles PDR optics optimization including DA Geometrical aperture for DR and PDR Magnet specifications for DR and PDR May 09 April 09 September 09 12/03/2009 CLIC DR meeting

5 Linear imperfections Orbit, coupling and vertical dispersion correction (low emittance tuning) Gradient and optics correction Tolerances for magnet alignment and linear imperfections Correction systems for PDR and rough tolerances Corrector magnet parameters May 09 April 09 September 09 12/03/2009 CLIC DR meeting

6 Non-liner dynamics Non-linear imperfections and DA
Non-linear correction systems (sextupole, octupoles) Error specifications for magnets Effect of wigglers and tolerances    May 09 April 09 September 09 12/03/2009 CLIC DR meeting

7 Injection-Extraction
Injection and extraction optics and concept for DR and PDR Injection and extraction elements specifications and tolerances Conceptual design of kicker and septa May 09 April 09 September 09 12/03/2009 CLIC DR meeting

8 Injection-Extraction
Injection and extraction optics and concept for DR and PDR Injection and extraction elements specifications and tolerances Conceptual design of kicker and septa May 09 April 09 September 09 12/03/2009 CLIC DR meeting

9 Injection-Extraction
Injection and extraction optics and concept for DR and PDR Injection and extraction elements specifications and tolerances Conceptual design of kicker and septa May 09 April 09 September 09 12/03/2009 CLIC DR meeting

10 Super-conducting wiggler design
NbTi prototype work, including measurements Nb3Sn prototype work, including magnet models, mechanical design and measurements Radiation absorptions scheme and mechanical design May 09 April 09 September 09 12/03/2009 CLIC DR meeting

11 Magnetic modeling of main magnets, including field quality
Magnet systems Magnetic modeling of main magnets, including field quality Corrector modeling WP7. Collective effects E-cloud and fast ion instability evaluation for final lattice design Instabilities (transverse and longitudinal) Space charge Impedance evaluation for key components (absorbers, collimators, wiggler chambers, BPMs…) Coherent synchrotron radiation Intrabeam scattering for non-Gaussian distributions Vacuum specifications Feedback systems WP8. Vacuum systems Chamber coatings and experimental program for e-cloud mitigation (ESRF, CESR-TA) Preliminary chamber mechanical design Vacuum quality (pumps) WP9. RF system Conceptual design of RF system Evaluation of longitudinal instabilities (HOM) Longitudinal impedances Design of the PDR RF system WP10. Instrumentation List of instruments for DR and PDR with required resolution, accuracy and stability Ideas for the most critical items (e.g. turn-by-turn beam profile monitors) WP11. Power systems Inventory of needed power supplies and parameters for PDR and DR WP12. Survey and stabilization Alignment tolerances and stabilization issues WP13. DR and PDR coordination DR and PDR parameter consistency and design strategy Design of PDR/DR for 500 GeV parameters Systems integration and layout Power consumption and costing CLIC-ILC collaboration for DRs May 09 April 09 September 09 12/03/2009 CLIC DR meeting

12 Collective effects E-cloud and fast ion instability evaluation for final lattice design Instabilities (transverse and longitudinal) Space charge Impedance evaluation for key components (absorbers, collimators, wiggler chambers, BPMs…) Coherent synchrotron radiation Intrabeam scattering for non-Gaussian distributions Vacuum specifications Feedback systems May 09 April 09 September 09 12/03/2009 CLIC DR meeting

13 Vacuum systems Chamber coatings and experimental program for e-cloud mitigation (ESRF, CESR-TA) Preliminary chamber mechanical design Vacuum quality (pumps) May 09 April 09 September 09 12/03/2009 CLIC DR meeting

14 RF system Conceptual design of RF system
Evaluation of longitudinal instabilities (HOM) Longitudinal impedances Design of the PDR RF system WP10. Instrumentation List of instruments for DR and PDR with required resolution, accuracy and stability Ideas for the most critical items (e.g. turn-by-turn beam profile monitors) WP11. Power systems Inventory of needed power supplies and parameters for PDR and DR WP12. Survey and stabilization Alignment tolerances and stabilization issues WP13. DR and PDR coordination DR and PDR parameter consistency and design strategy Design of PDR/DR for 500 GeV parameters Systems integration and layout Power consumption and costing CLIC-ILC collaboration for DRs May 09 April 09 September 09 12/03/2009 CLIC DR meeting

15 RF system Conceptual design of RF system
Evaluation of longitudinal instabilities (HOM) Longitudinal impedances Design of the PDR RF system  issues May 09 April 09 September 09 12/03/2009 CLIC DR meeting

16 CLIC @ 500GeV Evaluate the energy impact of the damping rings
Numerical tools Lattice design and non-linear dynamics Impedance estimation Participate in common experiments at test facilities IBS CESR-TA Low emittance SLS Resonance ATF, CESR-TA, Light Sources Communication Organize a workshop (winter ) Document common work in a working group report 12/03/2009 CLIC DR meeting