RPCs for CMS – Phase I Status report L. M. Pant BARC-NPD L.M.Pant India-CMS Meet, PU, Chandigarh 05 th April, 2007.

Slides:



Advertisements
Similar presentations
Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
Advertisements

Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
Prototyping and study of Glass Spark Chamber detectors B.Satyanarayana TIFR, Mumbai.
CMS Outer Hadron Calorimeter (HO) Project Naba K Mondal Tata Institute, Mumbai, India.
Resistive Plate Chambers for CMS (Pre-assembly Jobs done at BARC) Archana Sharma, Suman B.Beri P.U, Chandigarh & L.M.Pant BARC, Mumbai.
M. Bhuyan 1, V.M. Datar 2, S.D. Kalmani 1, S.M. Lahamge 1, S. Mohammed 3, N.K. Mondal 1, P. Nagaraj 1, A. Redij 1, D. Samuel 1, M.N. Saraf 1, B. Satyanarayana.
ARNAB BANERJEE Variable Energy Cyclotron Centre, India.
Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
C. Lu, RPC System Installation Workshop, 6/11/2009, CUHK 1 1 RPC gas system installation (step by step plan) (CUHK, 6/11/2009) Changguo Lu, Kirk McDonald.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
Walls crates cables gas chambers electronics CERN adb.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Status of INO detector R&D B.Satyanarayana TIFR, Mumbai.
C. Bromberg 1 Michigan State University Feb. 8, 2004 RPC Monolithic Detector l Most absorber shipped direct to the site äShipping minimized äHeavy (~20.
FAZIA DAYS, Bologna 10-12/feb/2010, WG8, Emanuele Vanzanella (mechanics & cooling), Alfonso Boiano (electronics) ELECTRONICS HOLDER & COOLING SYSTEM Side.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
Experiences with RPC Detectors in Iran and their Potential Applications Tarbiat Modares University Ahmad Moshaii A. Moshaii, IPM international school and.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
GEMs for CMS Upgrade Muons are quite central to most of the Physics that would unfold from “CMS” Triggering and tracking with muons, is therefore a challenging.
 Read out strips production : We will provide 200 strips (100 RE4/2 and 100 RE4/3) Contract with Beijing Gaonengkedi Co. signed on 10-Aug., 3 RE4/2 and.
RPC STATUS AT PANJAB UNIVERSITY Panjab University, Chandigarh India-CMS Meeting, 28 th July, 2011.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
LiH Casting & Testing1 Lithium Hydride Disc Casting & Testing Approaches C. M. Lei March 2, 2007.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Prototypes For Particle Detectors Employing Gas Electron Multiplier
SiD Concept – R&D Needs Andy White U. Texas at Arlington SiD Concept Meeting LCWS06 Bangalore, India March 11, 2006.
1 Aging Study for SiD Hcal and Muon System RPCs (University Linear Collider Detector R&D, project 6.19) Changgo Lu, W. Sands, K. T. McDonald, A.J.S. Smith.
DVCS-2 Assembly & Installation Charles Hyde DVCS Collaboration Meeting 18 December 2009 Clermont-Ferrand.
Production of Forward RPC Gaps CMS Forward RPC EDR (10/10/2002 – 11/10/2002) Seong Jong Hong KODEL, Korea University.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels1 PP0 & Service Panels 1.Introduction 2.Technical Status 3.Goals for 2002.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
India CERN Meeting, BARC, 28/02/11
Status summary of RPC R&D for INO ICAL detector B.Satyanarayana, TIFR, Mumbai Satyajit Jena, IIT Bombay, Powai For INO Collaboration.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
NCP-CERN Project status Waqar Ahmed. Items Production sites requirements Clean room Gas system Gas leak measurement station. Leakage current measurement.
Introduction Straw Working group meeting CERN group 1 NA62 Collaboration meeting, Brussels 7-10/9/2010.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
Micromegas Bulk Demonstrator One type of Bulk: Active area; 115 mm for 288 strips, 500 mm long Material: 100 µm PCB, 5 µm Cu, 18µm mesh, 20µm Mylar Two.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
Chiho Wang ATLAS TRT Krakow Workshop Duke University May, HV Plate Design & Assembly Chiho Wang Duke University.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
K.W. Glitza University of Wuppertal IBL Stave (Lessons for Upgrade)
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
LARP Collaboration Meeting Racetrack Coil Fabrication
CMS GRPC detector& cassette I. laktineh. Concepts Two concepts of RE1/1 detectors were developed : 1- One based on gluing glass plates to have large RPC.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
W.Van Doninck February 2010 The CMS muon upscope Restore the TDR version of CMS  ME4 CSC’s and RE4 RPC’s on Yoke YE3  When ? During first long shutdown.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
L. M. Pant1 RE Workshop, 19/11/12 Validation of RE4 Cu cooling systems for mass production Validation of RE4 Cu cooling systems for mass production L.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
The Phase-1 Extension of the CMS Endcap RPC System Michael Tytgat on behalf of the CMS Collaboration Outline :  Introduction  RPC Upgrade  Simulation.
R & D Status report on INO Naba K Mondal Tata Institute of Fundamental Research Tata Institute of Fundamental Research Mumbai, India.
Resistive Plate Chambers for CMS and INO
RE 4/3 RPC Pre-assembly manual 1. HCP case preparation
University of Wisconsin
Service channels between Tracker and PP1
Chamber Design and Integration RE3/1 and RE4/1
CMS RPC Endcap RE1 Status Report
Status of the PANDA Solenoid Magnet Production in BINP
Presentation transcript:

RPCs for CMS – Phase I Status report L. M. Pant BARC-NPD L.M.Pant India-CMS Meet, PU, Chandigarh 05 th April, 2007

Indents Status (12 sets) : Three RE*/3 & Nine RE*/2) SNItem DescriptionQuantityOrder placed with AmountExpected date of delivery 1HCP12Beijing BAMTRI Tech. & Devp. Co. 05 th Jan 2007 USD 6,922 May 2007 Adv. Payment gone 2Cu + Mylar sheets for Faraday Cage 12Beijing GaoNengKedi Science & Tech. Co. Ltd. 06 th Feb USD 7,469 May 2007 Adv. Payment being processed 3Read out strips12same as above 4Ferrules for signal cables (all 80 RPCs) 16,667same as above 5FEBs (for 12 chambers) 36M/s Matrix, Italy 5 Jan 2007 USD 7,758 May 2007 Adv. Payment gone 6Bakelite gaps (3 x RE*/3) 9 gaps (RPC Box) From CERNArrived in Mumbai on 15 th Feb Bakelite gaps (9 x RE*/2) 27 gaps (?) NO IDEA L.M.Pant India-CMS Meet, PU, Chandigarh 05 th April, 2007

Signal cable preparation (Draka cable : ~ 3 mm OD) : RE*/2 & RE*/3 RPC Type  Total number of cables ~ with contingency (1300) Total length (682 meters) RE*/296 x 10 chambers = 960 ~ x 460 = mm 460 metres RE*/396 x 3 chambers = 288 ~ x 740 = mm 222 metres Adaptor sideRead out side 460 mm; 740 mm RA L.M.Pant India-CMS Meet, PU, Chandigarh 05 th April, 2007

460 mm; 740 mm L1L2L Adaptor side L1L2L Read out side L1 L2 L3 sheath Copper braid insulator core L1 L2 L3 L1 L2 L3 dimensions in mm Signal cable preparation (Draka cable : ~ 3 mm OD) : RE*/2 & RE*/3 AR AR L.M.Pant India-CMS Meet, PU, Chandigarh 05 th April, 2007

460 mm of signal cable being marked Signal cables being cut Top sleeve removedCu braid being adjustedCu braid being cut at 5 mm Signal cable preparation for RE*/2 L.M.Pant India-CMS Meet, PU, Chandigarh 05 th April, 2007 Supreet from PU Abhinav from DU

Adaptor-end Read out -end 460 mm of signal cable96 signal cables (3 x 32) for one RPC ready Soldering on the core wire Signal cable preparation for RE*/2 L.M.Pant India-CMS Meet, PU, Chandigarh 05 th April, 2007

Teflon gas pipes : OD = 6 mm; Wall thickness = 1 mm L.M.Pant India-CMS Meet, PU, Chandigarh 05 th April, 2007

A D C B Teflon gas pipes : OD = 6 mm; Wall thickness = 1 mm L.M.Pant India-CMS Meet, PU, Chandigarh 05 th April, 2007

Perspex spacers : 8 clear holes on 5 mm thick perspex 15.2 mm = X 8 mm  mm 15.2 mm x 8 = mm = Y RE*/2X (mm) Y (mm) Quantity Type A Type B Type C A B C RE*/2 L.M.Pant India-CMS Meet, PU, Chandigarh 05 th April, 2007

Gas cylinders inside the cabinet Flow divider with safety bubblers ARGONARGON Iso- B U T A N E RE134ARE134A SF6SF6 Gas Purifiers 4 channel gas mixing unit L.M.Pant India-CMS Meet, PU, Chandigarh 05 th April, 2007 Parallel sets of MFCs being attatched for large sized gaps for CMS-RPCs

L.M.Pant India-CMS Meet, PU, Chandigarh 05 th April, 2007 Adaptor card design : Prashant Patale, NPD-BARC Top viewBottom view Top and bottom overlapped

L.M.Pant India-CMS Meet, PU, Chandigarh 05 th April, 2007 Adaptor samples for FEBs Top viewBottom view FRC connector

L.M.Pant India-CMS Meet, PU, Chandigarh 05 th April, 2007 Signal cables soldered to Adaptors ferrule FRC connector

L.M.Pant India-CMS Meet, PU, Chandigarh 05 th April, Signal cables soldered to Adaptors 72 + sets required for 12 chambers

L.M.Pant India-CMS Meet, PU, Chandigarh 05 th April, 2007 Cosmic stand for CMS RPCs 2000 mm x 1600 mm

L.M.Pant India-CMS Meet, PU, Chandigarh 05 th April, 2007 Vibration free assembly table for RPCs Full gap of RE*/3

L.M.Pant India-CMS Meet, PU, Chandigarh 05 th April, 2007 Manometer with safety bubbler for leak tests 18 cm Safety bubbler with Si oil kPa

Samples of following are urgently required in a second box L.M.Pant India-CMS Meet, PU, Chandigarh 05 th April, 2007 ?

Work schedule floated on 15 Feb. to collaborators First job is to prepare about 1200 signal cables (960 +) Procurement of materials from local market (gas pipes, Cu tubes, Cu plates for cooling etc.) Prepare the gas pipes according to the particular shape requirements in the jigs Fabrication of adaptor cards (100 cards by 15 April) Leak and HV tests of the 9 gaps being sent from CMS Outlook 1 (March – April 2007) the pre-assembly jobs L.M.Pant India-CMS Meet, PU, Chandigarh 05 th April, 2007

The HCP, Cu Read outs, FEBs etc. expected by May 2007 After the above equipments arrive – More hands are needed Assembly of ten chambers : June 2007 Someone from CMS (Cai) could be around in August/Sept. (invitation should go in time) Testing of ten chambers : August 2007 Support for Cosmic tests from CMS (August 2007) Scintillators, electronics etc. (to be DISCUSSED) The ten chambers can be despatched by Sept., 2007 AS SCHEDULED Outlook 2 (June – August 2007) the final assembly L.M.Pant India-CMS Meet, PU, Chandigarh 05 th April, 2007

Acknowledgements Nuclear Physics Division, BARC Mechanical Design & Prototype Devp. Section, BARC All the collaborators EHEP Group TIFR HECR Group TIFR L.M.Pant India-CMS Meet, PU, Chandigarh 05 th April, 2007