USBR Updates: Green River CRFS Meeting March 27, 2014.

Slides:



Advertisements
Similar presentations
CBRFC May 2014 Water Supply Webinar May 6, 2014 Greg Smith These slides:
Advertisements

Aspinall Unit Reservoir Operations CRFS Meeting November 16, 2010.
US Army Corps of Engineers BUILDING STRONG ® Mid-West Electric Consumers Association September 16, 2014 Corps of Engineers US Army Missouri River Mainstem.
Yellowtail Dam & Bighorn Lake Water Supply & Operations Meeting Billings, Montana October 8, 2009 RECLAMATION Managing Water in the West.
San Juan River Environmental Flows Workshop February 12, 2015 Flaming Gorge Dam Experimental Releases.
US Army Corps of Engineers BUILDING STRONG ® Weather, Runoff, and Water Quality Summary Water Year 2010 Steven B. Barton, P.E. Chief, Reservoir Control.
Aspinall Unit Seasonal Operation Goals Fill Blue Mesa Reservoir before end of runoff. Operate to the 2012 Aspinall ROD at the Whitewater Gage. Meet the.
Hydrology and Hydraulics. Reservoir Configuration.
Colorado River Water Supply and 7 State Drought Plan Don Ostler Upper Colorado River Commission.
Unit Number Oct 2011 Nov 2011 Dec 2011 Jan 2012 Feb 2012 Mar 2012 Apr 2012 May 2012 Jun 2012 Jul 2012 Aug 2012 Sep (3/4 Unit) 7 8 Units.
IDWR Water Supply Meeting May 12, 2011 NRCS Snow Survey Measuring Lost Lake SNOTEL Site, elevation 6,110 feet, along the NF Clearwater and St Joe Divide.
Recap of Water Year 2008 Hydrologic Forecast. Conclusions: The WY 2007 ESP forecast predicted increased likelihood of drought. Observed summer flows at.
Recap of Water Year 2007 Hydrologic Forecast and Forecasts for Water Year 2008 Alan F. Hamlet Andrew W. Wood Dennis P. Lettenmaier JISAO/CSES Climate Impacts.
31 DECEMBER VARIABLE FLOOD CONTROL DRAFT FOR LIBBY RESERVOIR U.S. Army Corps of Engineers Northwestern Division, North Pacific Region.
Alan F. Hamlet Andy Wood Seethu Babu Marketa McGuire Dennis P. Lettenmaier JISAO Climate Impacts Group and the Department of Civil Engineering University.
Yellowstone River Compact Commission Technical Committee Discussions Sheridan County Courthouse Sheridan, WY April 24, 2007 Bighorn Reservoir operations.
CBRFC March 2014 Water Supply Webinar March 6, 2014 Greg Smith These slides:
Colorado River Basin Water Supply Out look Lake Powell Lake Mead.
Reservoir and Diversion Data CBRFC Stakeholder Forum July 31, 2012.
2011 Peak Flows and Daily Forecasts CBRFC 2011 Stakeholder Forum November 3, 2011.
How Much Do We Have Left? Coming to Terms With the Colorado River Water Availability Study Annual Colorado Water Workshop July 21, 2010 Ben Harding – AMEC.
CRFS Technical Committee Spring Meeting LC Operations Update March 26, 2015.
CRFS Technical Committee Fall Meeting LC Operations Update November 20, 2014.
Responding to Drought (and other) Conditions on the Colorado River Urban Water Institute’s 21 st Annual Conference August 14, 2014.
Hood River Basin Study Water Resources Modeling (MODSIM) Taylor Dixon, Hydrologist February 12, 2014.
Duchesne Price Jensen Green River August 14, 2012 August 13, 2002 Drought Conditions in August.
Green River Water Rights Distribution Model (MODSIM) Update By Division of Water Rights
CBRFC April 2014 CUWCD Briefing/Meeting 1:30pm April 8, 2014 Ashley Nielson.
CRFS Technical Meeting LC Operations Update November 8, 2011.
Southwest Hydrometeorology Symposium Tempe, AZ September 28, 2011 Kevin Werner NWS Colorado Basin River Forecast Center : A Year of Extremes.
Yellowtail Dam & Bighorn Lake Operating Criteria Review Billings, MT September, 2010 RECLAMATION Managing Water in the West.
44 th Annual Mid-Pacific Region 2011 Water Users Conference Water Supply Outlook Reno, Nevada January 26-28, 2011.
A Perspective on Today’s Colorado River Issues. Upper Colorado Region River Basins.
NE Drought Conditions CARC Update: April 2011 Mark Svoboda and Brian Fuchs National Drought Mitigation Center University of Nebraska-Lincoln.
Water Year 2012: Review of Water Supply Forecasts in the Colorado River Basin CRFS November 14, 2012.
Species or RunONDJFMAMJJAS Fall Chinook Late fall Chinook Winter Chinook Spring Chinook Steelhead Delta smelt Figure 1. Comparison of the timing of life.
Modeling Development CRFS—Technical Meeting November 14, 2012.
Yellowtail Dam & Bighorn Lake 2010 Operation Review Billings, MT January 2011 RECLAMATION Managing Water in the West.
Martin Rule Curve Study Ashley McVicar, APC Maurice James, Water Resources Consulting LLC.
CBRFC March Peak Flow Forecast Webinar March 11, 2014 Greg Smith & Brenda Alcorn These slides: Presentation.
Yellowtail Dam & Bighorn Lake Water Supply & Operations Meeting Billings, Montana October 9, 2008 RECLAMATION Managing Water in the West.
CRFS Technical Meeting LC Operations Update March 29, 2011.
CRFS Technical Meeting LC Operations Update March 30, 2010.
Colorado River Update Terry Fulp Deputy Regional Director
Water Year 2009 Forecast Review: Green River Basin CRFS November 19, 2009.
CRFS November 20, Green River Basin Upper Green  Near record February precipitation  Large increases in forecasts on March 1  Much above average.
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
NON-TREATY STORAGE AGREEMENT “Introduction to Operations and the Non Treaty Storage Scenarios” Presenter: Jim Gaspard.
Martin Rule Curve Study Ashley McVicar, APC Maurice James, Water Resources Consulting LLC.
Model Overview Application of CALSIM II to Friant System.
NE Drought Conditions CARC Update: November 17, 2015 Brian Fuchs National Drought Mitigation Center University of Nebraska-Lincoln School of Natural Resources.
Lake Powell Operations CRFS Spring 2015 March 25, 2015.
Yellowtail Dam & Bighorn Lake Reservoir Operating Criteria Proposed Modifications Lovell, Wyoming July 29, 2008 RECLAMATION Managing Water in the West.
1 Upper Basin Snowpack as of 3/26/2014
CRFS Technical Committee Fall Meeting LC Operations Update December 8, 2015.
CRFS Technical Meeting LC Operations Update November 14, 2012.
CRFS Technical Meeting LC Operations Update March 27, 2014.
Yuma Agriculture Water - Rights and Supply Terry Fulp Director, Lower Colorado Region Yuma Agriculture Water Conference January 13, 2016.
CRFS Technical Committee Spring Meeting LC Operations Update March 15, 2016.
Reservoir Operations and Water Supply Planning at Salt River Project
Upper Snake Reservoir Operations October 13, 2015
Kootenai Basin Spring/Summer Operations for 2016
Albeni Falls Dam Operations
Summit County State of the River
Long-Lead Streamflow Forecast for the Columbia River Basin for
Alan F. Hamlet Andrew W. Wood Dennis P. Lettenmaier
Recap of Water Year 2008 Hydrologic Forecast
Kootenai Basin Spring/SummerOperations for 2016
Drought Contingency Planning Efforts
Upper Hudson/Sacandaga River Offer of Settlement
Presentation transcript:

USBR Updates: Green River CRFS Meeting March 27, 2014

Green River Operations Fontenelle Flaming Gorge

Fontenelle Operations

Fontenelle Storage Live Capacity 345,000AF Capacity on 3/26/14127,317AF (37% full) slightly high for March Pool Elevation Reservoir Elev. (Min) feet Elevation on 3/26/ feet Elevation above (Min) 33.93feet Inflow and Release Average Inflow 925cfs Average Release 1,430cfs

Fontenelle Reservoir Elevation

Fontenelle Inflow and Release Apr – Jul Inflow 1,240 KAF (171%) Projected releases between 3,000-8,000 cfs over summer, likely longer duration of 8,000 cfs, depends on observed inflow

Flaming Gorge Operations

Flaming Gorge Live Capacity MAF Capacity on 3/26/ MAF Available Space.843MAF (78% full) Reservoir Elev feet Elevation on 3/26/ feet Elevation below (Full) 22.01feet Average Inflow 1,750cfs Average Release 830cfs

Spring 2014 Hydrograph Apr – Jul Inflow 1,430 KAF (146%) Projected releases steady of approximately 2,000 cfs over summer and winter Projected peak between 4,600-8,600 cfs for 3-4 weeks during larval drift

Upper Green Classifications

Yampa River Classifications

Green WY 2014 Fontenelle releases expected to be higher this summer and the reservoir is expected to fill. Flaming Gorge peak release timed with larval trigger. Runoff conditions may require releases prior to larval presence. Maximum summer releases vary between 3,000 cfs, 4,600 cfs and 8,600 cfs. Current base flow releases calculated at 1,975 cfs.