Presentation is loading. Please wait.

Presentation is loading. Please wait.

Aspinall Unit Seasonal Operation Goals Fill Blue Mesa Reservoir before end of runoff. Operate to the 2012 Aspinall ROD at the Whitewater Gage. Meet the.

Similar presentations


Presentation on theme: "Aspinall Unit Seasonal Operation Goals Fill Blue Mesa Reservoir before end of runoff. Operate to the 2012 Aspinall ROD at the Whitewater Gage. Meet the."— Presentation transcript:

1

2 Aspinall Unit Seasonal Operation Goals Fill Blue Mesa Reservoir before end of runoff. Operate to the 2012 Aspinall ROD at the Whitewater Gage. Meet the NPS Black Canyon water right peak flow. Meet all state water right needs on the river downstream. Maximize hydro power production. Meet Blue Mesa Reservoir End of December ice target of 7490.0 ft Meet flood control needs of storing water in Blue Mesa Reservoir and to avoid flooding down river in the town of Delta. Adjust river flows for diversion needs through the Gunnison Diversion Tunnel. Adjust flows for trout spawning needs in the fall and spring months.

3

4

5

6

7 6400 cfs March 15 Forecast 850 KAF

8

9

10 Reserved BC Water Right 24-Hr Peak of 6400 cfs

11 Reserved BC Water Right 24-Hr Peak of 635 cfs

12 Water year 2011 we expect to meet the water right and fill blue Mesa


Download ppt "Aspinall Unit Seasonal Operation Goals Fill Blue Mesa Reservoir before end of runoff. Operate to the 2012 Aspinall ROD at the Whitewater Gage. Meet the."

Similar presentations


Ads by Google