Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla.

Slides:



Advertisements
Similar presentations
A Pressurized Gas Cerenkov Detector for PID in Hall A Robert J. Feuerbach Jefferson Lab Design and prospective fabrication in collaboration with: Argonne.
Advertisements

Preparing for the CD-2 Review Elton Smith Hall D Collaboration Meeting October 12-14, 2006.
NTOF11 Hg System Design Status Van Graves Tony Gabriel, Phil Spampinato Collaboration Meeting – Princeton University Apr 2005.
MERIT Hg System Final Design Review Hg Target System Design Interfaces V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma.
SHMS Design, Engineering & Construction Status for Hall C Users meeting Paul Brindza January 2010.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
INFN of Genova, Pavia and Roma Flavio Gatti, PSI, February 9 th, Timing Counter status Timing Counter status.
GlueX Simulations Status Report on CD3 geometry Richard Jones GlueX Collaboration Meeting, Newport News, January 10-12, 2008.
BaBar: The Detector Richard F Boyce 21 October 2003.
Progress on Photon Beam and Simulation Part 1: active collimator Part 2: physics simulations Richard Jones, University of Connecticut GlueX collaboration.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
20 October, 2004GlueX Detector Review 1 The GlueX Detector Curtis A. Meyer This talk Next talk.
Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.
1 Design of Solenoid and iron yoke for GLD KEK Hiroshi Yamaoka Ken-ichi Tanaka July 13, ‘05.
Thomas Jefferson National Accelerator Facility Page 1 CD Workshop Dec 2-3, 2009 CLAS12 Central Detector Overview and Integration David Kashy Hall B Lead.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
Hall D Civil and Detector Progress Elliott Wolin 12-Sep-2002 U. Of Regina Middle of Nowhere Canada.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status Paul Brindza January 26, 2009.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN H. Felice, R. Hafalia, D. Horler, T.
20to2T5m100cm Images Van Graves February 13, 2014.
September 18, 2007H. J. Krebs1 SiD Collaboration One Piece End Door Design Concept plus Forward Equipment Interfaces H. James Krebs SLAC September 18,
KEK Hiroshi Yamaoka Task list for Magnet/Iron yoke Solenoid magnet Iron yoke Experimental hall and other facilities May 11, ’05.
Electronics play a critical role in modern accelerator physics experiments. Events will be recorded at a rate of 200,000/second. Modular electronics such.
Barrel Calorimeter Support Mechanism Two designs are proposed for review –Design1. Individual module (Segment) of the Barrel Calorimeter is placed inside.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
Hall D Integration Status GlueX Collaboration Meeting Indiana University, Ravi Anumagalla.
Curtis A. Meyer 20 May, 2004 GlueX Detector Infrastructure The issue of infrastructure includes details of how we assemble the detector as a whole. How.
GlueX collaboration meeting, Bloomington, May 9-11, Task list for UConn construction contract 1.order clear light guide fibers from Saint Gobain.
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
Budget Status and FY03 Requests Elton Smith Hall D Collaboration Meeting Sep 12-14, 2002.
1 ILD meeting LAL M. Joré – Integration status Matthieu Joré – 25 th of May ILD integration status and open issues.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
Robert Pak VTX Meeting Sept. 7, 2004 VTX. Robert Pak VTX Meeting Sept. 7, 2004 PHENIX Central Region From VTX Proposal (dims in mm) HBD is standalone.
Results From the Radphi LGD Dan Krop 12/11/03. The Radphi Experiment Radphi Experiment Took Data in Jlab Hall B From May to July Hours Of Beam.
1. Introduction 2. Magnetic field design Optimization of yoke configuration in several conf. Boundary conditions -
September 20, 2007H. J. Krebs/B. Wands/B. Cooper1 SiD Collaboration Preliminary End Door Design Concept Support of Forward Systems H. James Krebs Bob Wands.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
Budget Status and FY04 Requests Elton Smith Hall D Collaboration Meeting Dec 11-13, 2003.
MEA Machine and Experiment Assembly Norbert Meyners, MEA 12. July 2007ILC IRENG07 WG-A1 LDC Engineering Design (Status) Introduction General Design Detector.
Integration Prototype1 BaBar Integration as a Prototype for SuperB Bill Wisniewski SuperB Workshop at LNF 6 April 2011.
12 July 2007IRENG07 WG-A M. Breidenbach1 SiD Concept SiD is relatively modest in scale compared to the LHC detectors, and comparable to SLD: Tracker Radius.
ORKA support - status report Scope of conceptual design task Develop a conceptual design for how to support the ORKA detector inside the CDF detector Develop.
Status of the Yoke Interfaces Presented by Evgeny Koshurnikov February 2013.
June 2, 2008 Bill Wisniewski1 BaBar Disassembly and Disposal Overview.
October 6, 2009Bill Wisniewski1 State of drawings Remedies? Forward Region DIRC/DCH/EMC interplay Road Trip Discussion Beam pipe & forward cone plug ‘Quick’
2016/9/30 Yasuhiro Infra/CFS mini-ws
Some Updates on Mechanics CM-MEC Session Dec J. Lühning, GSI
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
STRAW TRACKER SYSTEM CAD STATUS :
Present status of the flux return yoke design
PANDA Yoke of the Magnet
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
SiD Muon Yoke Structure - Deformation Studies -
nSW Alignment Installation
IHEP group Shashlyk activity towards TDR
Vertex Detector Mechanical R&D Design Questions and Issues
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
Hall C Down Stream Beam Pipe And Dump Interface Design
CLEO II Magnet in Hall A for SoLID
as a prototype for Super c-tau factory
Background Concept Results Conclusions
BaBar LST Upgrade Richard F Boyce
Presentation transcript:

Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla

Hall D Subsystems Solenoid –Iron yokes –Cryostats –Filler plates Veto –Scintillators –Iron plates Cerenkov detector Cylindrical Drift Chamber Forward Drift chamber Replacement of thermal shields in the cryostat Barrel Calorimeter } Require Support Structures & Maintenance Platforms Work is being done to support the BC to the iron yokes

CDC FDCBarrel Calorimeter Iron Yokes VETO Cryo Stat Target Vertex Detector

More data needed for Cerenkov detector How is the veto fixed to the upstream end ?

The components are extracted by “4 ft” from each o other to facilitate future maintenance The detector requires a “platform” to support the ex t extracted components

Structures are designed to accommodate the solenoid and the Cerenkov detector Rails are provided to move the components backwards for having access to the FDC’s for maintenance Support Structures

Top View of the HALL The Platform is 8 ft from the base Supports the extracted components Assists in assembling the parts Detector Platform

A hole is necessary in the platform to gain access to the upstream veto Rails are provided to extract the veto in the forward direction Service Platform

The CDC enclosed in the Fiber Glass Cylinder is inserted into the Barrel Calorimeter supported by the rails CDC Barrel Calorimeter CDC OD : 120cm BC OD : 130cm

CDCFiber Glass Cylinders with the railsBarrel Calorimeter Rails Attached to the Fiber glass

A removable access platform is used for maintenance of CDC, target and vertex detector

The temporary platform is supported on the rollers Alignment features can be included to maintain the precision while extraction/installation

CONCLUSION Support structures for the hall D components have been built and drawing are created for fabrication Concept extraction mechanisms have been proposed for review Need a discussion with the individual subsystem collaborators to verify the geometry of the models in CAD ( Barrel Calorimeter, Forward VETO,CDC, FDC, Target and Vertex Detector) Comments and suggestions for improving the Design