ScECAL BeamTest Analysis Asian ScECAL Meeting Jan 14 th, 2010 Adil, Satoru Uozumi, DongHee Kim.

Slides:



Advertisements
Similar presentations
Same Channel Same Satellite. Channel 3B N18 Channel 3B N18 Channel 3B N19 Channel 3B N19 Channel 3B M2 Channel 3B M2 A0 vs A1A0 vs A2A1 vs A2.
Advertisements

R. Zitoun, Stony Brook and LAPP CTF Meeting10 February Much Noise About Nothing? Robert Zitoun Stony Brook and LAPP CTF Meeting February 10, 2003.
With Real Detector: The MIP Apollo Go, NCU Taiwan Ped:  ADC cnts MIP: 39.0  12.6 ADC cnts S/N should be better with 3 time samples, better.
November 3rd, 2006 CALICE-UK, Manchester - A.-M. Magnan - 1 Noise studies DESY + CERN TB overview Anne-Marie Magnan Imperial College London.
1 AHCAL answers IDAG Erika Garutti On behalf of AHCAL analysis team.
Adil Khan Kyungpook National university Korea-Japan Joint ScECAL Group Meeting kobe University Japan 3 rd September 2010.
Calibration Munich group version Checks. SWM UD, April 2004Nadia Tonello, MPI 2 Idea Calibration runs: same number of photons in all PMs Flat fielding:
1 Summary on the Wednesday access of BBC FEM 07/28/05 Kazuhisa Yamaura Koutaro Kijima Daisuke Watanabe Misaki Ouchida.
Preshower 15/03/2005 P.Kokkas Preshower September Run Data Analysis P. Kokkas.
Calibration of the VA2 B Pal, R Mountain, M Artuso 6/29/2010 Goal: get an absolute calibration of a VA2 channel to measure diamond charge collection.
Checking the Acd hardware veto setting The hardware veto is generated in the front-end electronics Discriminator with coarse and fine settings Both are.
1 Data Analysis Framework for DHC Tower Update - 07/28/2003 Kurt Francis - Northern Illinois University.
CSC DQA Status Ken Johns, Venkat Kaushik, Caleb Lampen, Xiaowen Lei (U. Arizona)
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Oct, 24, 2007.
11 CSC DQA Status Ken Johns, Venkat Kaushik, Caleb Lampen, Xiaowen Lei (U. Arizona)
12.18 report LIU Qian. Moon box test Purpose: Try to find the reason why the Q resolution is about 10%. Test: The stability of Ref-PMT test Ref-PMT voltage.
VELO ADC vs Charge Calibration Jianchun Wang April 16, 2008 This is an update to the presentation at April 11 st VELO Group Meeting. A new scan data of.
Status Report For Threshold Scans. Shaper/Sampler Drop Trims As promised new and improved trimming techniques have been developed. As suggested, we will.
More on Testbeam Analysis FLZ. Stability Checks for TCMT Pedestal stability already shown by Kurt MIP calibration stability Response stability.
ACD calibrations Pedestals Measured from online script Measure PHA w/ HV off, no charge injection Use cyclic triggers ~ ADC counts, very narrow.
Performance test of STS demonstrators Anton Lymanets 15 th CBM collaboration meeting, April 12 th, 2010.
MuTr HV Optimization RIKEN/RBRC Itaru Nakagawa 1.
K1.8 meeting Report from E05 group Toshiyuki Gogami 26 Dec 2014.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
ScECAL Fermilab Beam Test analysis ScECAL Group Meeting Kyungpook National University, Daegu, Republic of Korea, August 6 th, 2010 Adil Khan, Satoru Uozumi,
S-2S MEMO Toshiyuki Gogami 17 May Contents Analysis results of WC test.
Photon Beam Position Stability Mike Grissom UNCW July 29,2005.
Photon Beam Position Stability Mike Grissom UNCW July 29,2005.
Montpellier, November 15, 2003 J. Cvach, TileHCAL and APD readout1 TileHCAL- fibre readout by APD APDs and preamplifiers Energy scan with DESY beam –Energy.
N. Saoulidou, Fermilab1 Study of the QIE Response (Current Injection Mode) & development of diagnostic tools
1234 Dec Jan Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14.
MPPC Measurements at LSU Brandon Hartfiel LSU Hardware Group Thomas Kutter, Jessica Brinson, Jason Goon, Jinmeng Liu, Jaroslaw Nowak Sam Reid January 2009.
1 Latency and pedestal test Mikko Nykänen
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
T0 offline status Alla Maevskaya for T0 team 8 March 2011 ALICE offline week.
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
Hycal Energy Resolution, Timing, &Trigger Efficiency, A cumulative study. Chris Mauney.
ScECAL Fermilab Beam Test analysis ScECAL Group Meeting Kyungpook National University, Daegu, Republic of Korea, July 22 nd, 2011 Adil Khan.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
PMT Calibration R.Sawada 7/Jan/2007. Time calibration Method was talked at the previous meeting. The problems which was shown before were because I used.
Some feedbacks from DRS data analysis (very preliminary) F. Scuri - I.N.F.N Sezione di Pisa RD52 – Collaboration Meeting – Pavia, March 12, 2013 F. Scuri.
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
K. Andeen, U. Wisconsin, 6mTagger Calibration, DESY Summer Student Fest, Hamburg, GermanyApril 7, Calibration of the 6m Tagger Karen Andeen, University.
Suppress our data? Deepali and Takao. Issue now Event size for HBD is large at HV=3500V –Is not very much appreciated. –Needs to set higher zero-suppression.
CAL DQM January 2004 Thomas Schörner-Sadenius DESY, 28 January 2004.
Status Report toward the Beam Test Quick report on the MPPC mass check Other beam test related issues –Schedule –Participants –Jobs –etc … Satoru Uozumi.
Pedestal Stability and Sparsification Nick Woods UNCW July 29, 2005.
6 Gev tower = ~560 chns SMD adc:.62x 6,000/( )/6 ~ 8.45 MeV/Chn ~ is consistent with original calibration! Center strip (GeV) Center strip (chn)
CALICE, CERN June 29, 2004J. Zálešák, APDs for tileHCAL1 APDs for tileHCAL MiniCal studies with APDs in e-test beam J. Zálešák, Prague with different preamplifiers.
Report on the Beam Test Analysis Satoru Uozumi Apr GLDCAL meeting Topics of this talk are: Comparison of various MIP calibration methods Some problems.
Timing Constants for Outriggers using the Milagro Laser Matthew E. Wilson November 16, 2003.
ArgonneResult_ ppt1 Results of PoGO Argonne Beam Test PoGO Collaboration meeting at SLAC, February 7, 2004 Tsunefumi Mizuno
Brief report on May 09 running with ScECAL and AHCAL S. Uozumi (Kobe) Jun CALICE TB meeting.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
CEPC ScECAL Optimization for the 3th CEPC Physics Software Meeting
Beam test of Silicon-Tungsten Calorimeter Prototype
EZDC spectra reconstruction and calibration
Solving pedestal problem
Some Result of HyCal Resolution
Online Calibration Online calibration: validation: L3fCalCalibTool –
Timing Uncertainty Analysis Update
Rate vs. Thickness Jan 18, 2017.
Results of HyCal Analyses
Status report Minjung Kim
Equipment Tests for DHC Tower
مديريت موثر جلسات Running a Meeting that Works
Status of Instrumental Beam Studies and Technical Description of Detectors and DAQ February 24, 2017.
Current status Minjung Kim.
Stability of Calibration Data
line shape of ee->KK
Presentation transcript:

ScECAL BeamTest Analysis Asian ScECAL Meeting Jan 14 th, 2010 Adil, Satoru Uozumi, DongHee Kim

Pedestal Check Collect the Pedestal mean and Sigma Values of all the Run numbers using two times Gaussian Function. Fitting Function : gauss->µ ped ± 3σ ped Looked for channel by channel

After 2XGaussian Function

Some Bad Channels common to every Run Ch :11, L:19 Ch:48, L:29 Ch:58, L:11

RMS histogram of some runs

Chi2 Histogram of some runs

Chi2 Vs RMS

Pedestal Mean Vs RunNumber RunNumber Mean Value

Pedestal Sigma Value Vs RunNumber RunNumber Sigma Value

Plan Next Step is to use the pedestal data for the MIP Calibration constant