RockOn! 2008 1 RockOn! Structure Build RockOn! 2008.

Slides:



Advertisements
Similar presentations
CRIMPING Introduction
Advertisements

Build Your Own Future RC2 Serviceability. Build Your Own Future Safety and Ground Rules Before servicing, always remove A/C power from the unit and disconnect.
Zebra® 105SL™ * Removing and Installing Printhead
AnaSonde Assembly. What is the AnaSonde? *Reads temperature, pressure, and humidity data from the atmosphere *After it is sent into the atmosphere, it.
UVM CricketSat Assembly Manual. Getting Started Make a hard copy print out of the following page It will help you identify the proper components Place.
Assembly Manual Mike Fortney 04/09/2004 CricketSat Receiver.
CricketSat Receiver Assembly Instructions This is the instruction slides for the assembly of a receiver board. It would be a good idea to review soldering.
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
RockOn! Canister Integration RockOn! 2009.
Breaking, Measuring, and Adjusting Chain ~The most used drive system on a FIRST robot uses chains and sprockets. Understanding the proper techniques to.
Optical Manufacturing Solutions 1 Probe Assembly.
Assembling a Functional Multi-Wire Proportional Counter - Page 1 Work in pairs. One person will take the chamber apart, and the other will reassemble it.
A-dec 300 Dual Mount on 500 Installation. Agenda ► General Information ► Recommended tools ► Installation ► Follow through install guide ► Hands-on install.
Click on this image to open the full PDF document.
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Materials QtyLWHDescription 28’X4’X15/16”Plywood (15/16” is also known as ¾”) 88’X2”X1”Lumber – Pine 16Home Depot 5 Gal Bucket 48’Rolls of hook and tie.
Robot Quick Build Session Frame Assembly Instructions Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team 1750 Special Thanks to Oklahoma.
ASSEMBLY INSTRUCTIONS. 2 ASSEMBLY INSTRUCTIONS TOOLS REQUIRED: SIDE CUTTING PLIERS PRY BAR 7/16” & 9/16” WRENCH 3/16” ALLEN WRENCH T-15 TORQUE.
1 Zebra 170 XiIII Plus Removing and Installing Printhead Calibrating Head Resistance Print Quality Adjustments.
CricketSat LP (Transmitter) Assembly Instructions This is the instruction slides for the assembly of a transmitter board. This is the board that will fly.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Confidential Steelers Mechanical Design Review 1 PLC MODULE INSTALLATION INSTRUCTIONS IN CGR1240.
Hydraulic Digger Step-by-step assembly instructions (c) 2013 Mechanical Kits Ltd.1.
Pneumatic Arm Assembly Instructions
Building a Pressure/Temperature Weather Station (Sensor Pack) AEM 1905, Fall 2008.
Electronics Merit Badge Class 4 5/17/2015Electronics Merit Badge Class National Scout Jamboree1.
L.C. Technology ROBOT ASSEMBLY. Base Assembly BASE File off raised tabs on each side of Servo. Place Servo in vice between Fibre Clamps. Raised Tabs Repeat.
Service Seminar Memory Craft Table of Contents MC10001 Top Cover Removal…………………………………………………………………..…………1 Belt Cover Removal……………………………………………………………..……………2-4.
Assembly Manual Mike Fortney 04/02/2006 CricketSat Receiver.
Building a Computer Kate Chapin Capstone Project.
CricketSat Receiver Assembly Manual Mike Fortney 06/26/2006.
Colorado Space Grant Consortium Timing Circuit HW #4 Class #07 Timing Circuit HW #4 Class #07.
Robot Build IT Girls Allowed 2014 Updated 14 th August.
1 Student Hands On Training I (2007) Timing Circuit & Camera Integration Timing Circuit & Camera Integration.
1 Student Hands On Training I (2009) Soldering 101.
University of Minnesota Unmanned Aerial Vehicle Research Lab Goldy Flight Control System Manufacturing Instructions.
SpectraSonde Assembly. What is the SpectraSonde? Reads temperature, pressure, and humidity data from the atmosphere. The SpectraSonde doesn’t fly like.
Replacing board in CLAP Tools: Flashlight (torch for those of you in Cape Town)) small philips screwdriver spacer tool* dish to hold screws 2 rolls of.
School Name Date Volunteer Name Electric Generator SEEDKIT Workshop.
Treezilla Clinic Lonestar Region, Division 3 - Mike Jobe.
Treezilla Clinic Lonestar Region, Division 3 - Mike Jobe.
1 FREE CLIMBER 4400 ASSEMBLY INSTRUCTIONS PART NUMBER
Plans for the 2015 Invention Challenge Target Paul MacNeal August 9,
Control System and Electrical Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
AnaSonde-3M Assembly. What is the AnaSonde-3M? The AnaSonde-3M reads temperature, pressure and humidity data from the atmosphere. After the AnaSonde is.
Framed Canopy Fitting Instructions Contents – 6- Angled frame fixing brackets 1 x handle pack 6 x self drilling tech screws 3 keys 1x door 6 x coach screws.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #06 Gateway To Space ASEN / ASTR 2500 Class #06.
Build a Simple Electric Motor Uses a stator made of windings, an armature with two coils, and a commutator.
Year 8 Fuse Tester Design & Technology PCB Information Fixed value resistors 470R = Yellow, Purple, Brown This component is soldered directly onto the.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
AVIVA™ ELECTRIC BIKES VIPER ASSEMBLY INSTRUCTIONS Aviva™ - For A New Way Of Life.
1 Equilibrium The Balancing Robot By: Kerry Scharfglass Whiz Kid.
Build A Motor You must follow the directions step-by-step!
RockOn! RockOn! Structure Build RockOn! 2009.
VIEW SERIES with Sliding Door
Select your System Freedom Micro DI.
What is TETRIX? If you can dream up a robot design, you can build it with the TETRIX Robotics Design System.
Installation Walkthrough Image Guide
GENERAL CAUTION TOOLS REQUIRED ASSEMBLY AND INSTALLATION
Bilge Pump Service Project Model Service Kit
Student Hands On Training Workshop (SHOT 2007)
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Assembly instructions for M-K all bolt together hoppercone kit.
AEM 1905: Spaceflight with Ballooning University of Minnesota
Wiring the Light and Relay
BUILDING AN AUTONOMOUS QUADCOPTER.
2019 Investing Now Summer Program
Presentation transcript:

RockOn! RockOn! Structure Build RockOn! 2008

2

3

4

5

6 Step 11: Staking AVR Wires -Stake the soldering location of the AVR wires on the AVR PCB as shown.

RockOn! Structures Overview: -Open your structures kit and verify its contents. -ESD protection should be utilized during the entire building process! -Make sure anyone handling the hardware is protected from ESD damage. -If any issues arise raise your hand for assistance.

RockOn! Structural Kit Overview: Nuts and Bolts Purple M3.0x10 (2) M2.0 nuts (2) Light Green M2.5x10 (3) M2.5 nuts( 3) Black M3.0x25 (4) Red M3.0x35 (4) Light Blue M3.0x10 (4) Red M2.0x10 (2) M3.0 nuts (16) Light Green M3.0x10 (2) *Bolts and nut are 1:1 scale Nylon spacers (24)

RockOn! Structural Kit Overview: Brackets Z Accelerometer bracket (1) ‘L’ Battery bracket (1) Battery bracket (1) G-Switch bracket (1)

RockOn! Structural Kit Overview: Adding Electrical Tape Z Accelerometer bracket Leaving the holes free, add electrical tape to the Z accelerometer on the three-hole piece.

RockOn! Structural Kit Overview: Parts from other kits G-switch (1) Green LED (1) Blue RBF Wire (several feet) Red LED with connector (1)

RockOn! Structural Kit Overview: Parts from other kits G-switch (1) Green LED (1) Blue RBF Wire (several feet) Red LED with connector (1)

RockOn! Structural Kit Overview: Parts from other kits Z Accelerometer Board (1) Geiger Board (1) AVR Board (1)

RockOn! Structural Kit Overview: Tools Screwdriver Set Small Wrench Needle Nose Pliers

RockOn! Z Acc (green) Structural Kit: Mounting Plate AVR (black) Geiger Board (red) G-Switch (purple) Batteries (blue)

RockOn! Let’s Start Building! RockOn! 2008

17 Structural Kit: Completed Plate

RockOn! Step 1: AVR Mounting -Find the M3.0x25 Black bolts for the AVR. -Mount the AVR in the orientation shown on the following slide using nylon spacers. -The nylon spacers will be above and below the board as shown. -AVR holes are colored black on the mounting plate. -Hand tighten with an M3.0 nut followed by a final ½ turn using the wrench and screwdriver.

RockOn! Step 1: AVR Mounting x4 for all holes on the AVR ***Note the orientation of the AVR***

RockOn! Z Acc Step 1: AVR Mounting [Before] AVR Geiger Board G-Switch Batteries

RockOn! Step 1: AVR Mounting [After]

RockOn! Step 1: AVR Mounting [After close-up] Bottom-Up View Side View Top Down View

RockOn! Step 2: Z Accelerometer Mounting -Find the M3.0x10 green bolts for the Z accelerometer bracket. -Mount the Z accelerometer bracket as shown. -Make sure the electrical tape is oriented on the correct side of the Z accelerometer bracket. -Z accelerometer holes are colored green on the mounting plate. -Hand tighten with an M3.0 nut followed by a final ½ turn using the wrench and screwdriver.

RockOn! Step 2: Z Accelerometer Mounting [Before]

RockOn! Step 2: Z Accelerometer Mounting

RockOn! Step 2: Z Accelerometer Mounting [after]

RockOn! Step 2: Z Accelerometer Mounting [after close-up] Top View Bottom View

RockOn! Step 3: Z Accelerometer Mounting -Find the M2.5x10 Light Green bolts for the Z accelerometer. -Mount the Z accelerometer as shown. -Hand tighten with an M2.5 nut followed by a final ½ turn using the pliers and screwdriver. -*** Use three nylon washers between the bracket and PCB of the accelerometer. *** -Hand tighten with an M3.0 nut followed by a final ½ turn using the wrench and screwdriver.

RockOn! Step 3: Z Accelerometer Mounting [before]

RockOn! Step 3: Z Accelerometer Mounting

RockOn! Step 3: Z Accelerometer Mounting [after]

RockOn! Step 3: Z Accelerometer Mounting [after close-up] Front View Behind View Top Down View (note the washers used for spacing) Caution! These are the leads in question.

RockOn! Step 4: Z Accelerometer Connection -Connect the four pin header to the ‘Z main’ location on the AVR as shown. -Make sure you connect Red to “+” and Black to “-”.

RockOn! Structures Overview: -Open your structures kit and verify its contents. -ESD protection should be utilized during the entire building process! -Make sure anyone handling the hardware is protected from ESD damage. -If any issues arise raise your hand for assistance.

RockOn! Step 5: Geiger Counter Mounting -Using hot glue, stake down the red wire leading off the Geiger counter to the Geiger PCB near the bend in the wire.

RockOn! Step 5: Geiger Counter Mounting -Make sure the red Geiger wire is staked down before you mount the Geiger counter. -Using four nylon spacers and the Red M3.0x35 bolts mount the Geiger Board to the plate as shown. -Hand tighten with an M3.0 nut followed by a final ½ turn using the wrench and screwdriver.

RockOn! Step 5: Geiger Counter Mounting Side View Bottom View

RockOn! Step 6: Geiger Counter Connection -Connect the three pin header on the Geiger counter to the breadboard on the AVR as shown. Connect black to the black wire, red to the red wire as depicted.

RockOn! Step 6: G Switch Bracket Mounting -Find the G Switch bracket and mount to the plate as shown. -The mounting bolts are two M3.0x10 colored purple. -The holes to be mounted are closest the bend in the ‘L’ bracket. -Finger tighten with an M3.0 nut followed by a final ½ turn using the wrench and screwdriver.

RockOn! Step 6: G Switch Bracket Mounting [after]

RockOn! Step 6: G Switch Bracket Mounting [after close-up] Top View Bottom View

RockOn! Step 7: G Switch Mounting -Find the G Switch and mount to the G Switch bracket. -The mounting bolts are two M2.0x10 colored red. -Finger tighten the bolts with M2.0 nuts plus an additional ½ turn using the pliers and screwdriver.

RockOn! Step 7: G Switch Mounting

RockOn! Step 7: G Switch Mounting [After]

RockOn! Step 7: G Switch Mounting [After Close-up] Front View Back View

RockOn! Step 7: G Switch Mounting -Connect the G Switch header to the AVR board location labeled ‘G- switch’. -Since there is no polarity to this shorting mechanism, the orientation of the wires does not matter.

RockOn! Step 7: G Switch Mounting [After]

RockOn! Step 8: Battery Bracket Mounting -Acquire Flight Batteries in your structures kit. -Find both battery brackets and mount to the plate as shown. -Mount all brackets using m 3.0x10 bolts colored light blue. -Hand tighten with an M3.0 nut followed by a final ½ turn using the wrench. -Mount the ‘L’ bracket first pushing the batteries flush with it on the plate.

RockOn! Step 8: Battery Bracket Mounting [Before]

RockOn! Step 8: Battery Bracket Mounting

RockOn! Step 8: Battery Bracket Mounting [After] -Orient the battery connectors to lead the extending wires to the left.

RockOn! Step 8: Battery Bracket Mounting [After close-up] Top View *Note flushness of batteries with ‘L’ bracket Bottom View

RockOn! Step 8: Battery Connection -Connect the header from the batteries to the ‘Power’ location on the PCB. -The header should be right next to the ‘RDY’ and ‘ON’ locations within the PCB. -**Note the Red lead from the battery should connect to the ‘+’ indication on the PCB.

RockOn! Staking and Mounting RockOn! 2008

55 Step 1: Mounting the AVR -Slide some nylon threading underneath the AVR socket and tie down to the socket as shown. -The nylon should be tightly secured to the chip. Have a partner (who is also ESD protected) help you tie a tight knot.

RockOn! Step 1: Mounting the AVR -Slide some nylon threading underneath the AVR socket and tie down to the socket as shown. -The nylon should be tightly secured to the chip. Have a partner (who is also ESD protected) help you tie a tight knot.

RockOn! Step 1: Mounting the AVR

RockOn! Step 2: Tying sensor wiring [plate overview]

RockOn! Step 2: Bundling Wires -Each set of wires on the board should be bundled two or three times. -Use the nylon threading to bundle the wires together as shown. -Use a square knot to tie the nylon threading and trim the excess leaving an inch remaining. -USE CAUTION!! Don’t snip your wiring while doing this!!!

RockOn! Step 2: Bundling Wires AVR Overview

RockOn! Step 2: Bundling Wires Plate Overview

RockOn! Step 3: Mounting Battery wires -Orient the battery wiring as shown and stake to the AVR bolt indicated. -Wrap nylon thread around the bolt as shown and tie around the bundle of battery wires. -The wires are now secure to the plate.

RockOn! Step 3: Mounting Battery wires

RockOn! Step 3: Mounting Battery wires

RockOn! Step 3: Mounting Battery wires [plate overview]

RockOn! Step 4: Mounting G-switch wires -Orient the G-switch wiring for mounting to the AVR bolt indicated. -Wrap nylon thread around the gold battery bracket as shown and tie around the bundle of G-switch wires. -Wrap nylon thread around the bolt as shown and tie around the bundle of G-switch wires. -The wires are now secure to the plate.

RockOn! Step 4: Mounting G-switch wires

RockOn! Step 4: Mounting G-switch wires

RockOn! Step 5: Mounting Geiger wires -Orient the Geiger wiring for mounting to the Geiger bolt indicated. -Wrap nylon thread around the Geiger bolt as shown and tie around the bundle of Geiger wires. -The wires are now secure to the plate.

RockOn! Step 5: Mounting Geiger wires [Geiger PCB overview]

RockOn! Step 5: Mounting Geiger wires [Geiger PCB overview]

RockOn! Step 5: Mounting Geiger wires [plate overview]

RockOn! Indicator LED and RBF Wiring RockOn! 2008

74 Step 6: LED Mounting [General] -Make sure the Green LED is attached to the ‘ON’ header with the correct polarized orientation. -Additionally, make sure the connector for the Red LED is attached to the ‘RDY’ header in the correct orientation. -Extend all three sets of wires underneath the plate using the notch nearest the AVR as shown.

RockOn! Step 6: LED Mounting [General] -Use copious amounts of hot glue without being overly excessive. -Keep the tip of the hot glue gun from touching hardware, only molten glue should touch the hardware.

RockOn! Step 6: LED Mounting [General] -There are two orientations of LED mounting for the structures build. -If your plate serial number is odd (ending in 01, 03, 05) orient the LEDs in the first orientation given. This is opposite the Geiger Counter. -If your plate serial number is even (ending in 02, 04) orient the LEDs in the second orientation given. This is underneath the Geiger Counter. Example of an even plate serial number

RockOn! Step 6: LED Mounting [General] -Extend the wiring underneath the plate and match the red ‘x’ mounting location as shown. -Mount the blue RBF wiring and stake near the middle of the appropriate notch on your plate. -Make sure the lip of the red LED connector is flush with the edge of the plate. -The front of the green LED should be even with the edge of the notch when mounting. -Consult the following pictures of each orientation with any questions.

RockOn! LED Mounting: Odd Serial Number RockOn! 2008

79 Step 6: LED Mounting: Odd Serial Number -The red LED connector goes on top of the red x as shown. Orient the lip down and flush with the edge of the plate. -Also note the positive red wire is oriented inwards for this orientation.

RockOn! Step 6: LED Mounting: Odd Serial Number -Have a partner hold the LED and RBF wiring in place. -Now hot glue the wiring in place in the same manner the photo shows. -Be careful not to burn your partner’s hand!

RockOn! Step 6: LED Mounting [plate overview] Bottom View

RockOn! LED Mounting: Even Serial Number RockOn! 2008

83 Step 6: LED Mounting: Even Serial Number -The red LED connector goes on top of the red x as shown. Orient the lip down and flush with the edge of the plate. -Also note the positive red wire is oriented outwards -Also notice the green LED is flush with the notch edge, but under the plate.

RockOn! Step 6: LED Mounting: Second Orientation -Have a partner hold the LED and RBF wiring as shown. -Now hot glue the wiring in place in the same manner the photo shows.

RockOn! Staking Components RockOn! 2008

86 Step 7: Staking bottom nuts -Add hot glue to the nuts on the bottom of the plate. -Stake all nuts on the bottom of the plate using hot glue as shown in the following two pictures.

RockOn! Step 7: Staking bottom nuts Side View

RockOn! Step 7: Staking bottom nuts

RockOn! Step 8: Staking the AVR -Add hot glue across the AVR as shown for extra structural security.

RockOn! Step 8: Staking the AVR Side View

RockOn! Step 9: Staking connectors -Ensure all connectors are attached in the correct orientation. -Add generous amounts of hot glue to pot the connectors to the AVR PCB. -Now the wiring is mounted solidly to the AVR PCB. Example Connector

RockOn! Step 9: Staking connectors Example Connector

RockOn! Step 9: Staking connectors

RockOn! Step 10: Staking Geiger Wires -Stake the soldering location of the Geiger wires on the Geiger PCB as shown.

RockOn! Step 10: Staking Geiger Wires

RockOn! Structures Overview: -Open your structures kit and verify its contents. -ESD protection should be utilized during the entire building process! -Make sure anyone handling the hardware is protected from ESD damage. -If any issues arise raise your hand for assistance.

RockOn! Step 11: Staking AVR Wires -Stake the soldering location of the AVR wires on the AVR PCB as shown.

RockOn! Step 12: Staking Accelerometer Nuts -Add hot glue to the Accelerometer nuts as shown. -You may also add hot glue to the wire leads of the Z-axis accelerometers if you desire.

RockOn! Step 13: Staking Battery Bracket -Add hot glue to the areas shown on the battery bracket and connectors.

RockOn! Step 13: Staking G-switch nuts -Add hot glue to the nuts on the G-switch as shown.

RockOn! Step 14: Staking G-switch weights Before Staking

RockOn! Step 14: Staking G-switch weights After Staking [back view]After Staking [front view]

RockOn! Final Check RockOn! 2008

104 Bottom of an odd plate Staking should occur at all of these places!!

RockOn! Top of an odd plate -Staking should occur at all of these places!!! -Set the completed Plate on the ESD mat and wait for further instructions.

RockOn! Structural Integration RockOn! 2008

107 Structures Overview: -Open your structures kit and verify its contents. -ESD protection should be utilized during the entire building process! -Make sure anyone handling the hardware is protected from ESD damage. -If any issues arise raise your hand for assistance.

RockOn! Overview: -Now that your payload has been built, tested, and mounted to a structural plate, it is time to assemble a stack of plates and integrate them into the RockSat can configuration.

RockOn! What Are We Building? RockOn! 2008

110 Structural Kit Overview: Parts from other kits G-switch (1) Green LED (1) Blue RBF Wire (several feet) Red LED with connector (1)

RockOn! Step 6: LED Mounting: Odd Serial Number -The red LED connector goes on top of the red x as shown. Orient the lip down and flush with the edge of the plate. -Also note the positive red wire is oriented inwards for this orientation.

RockOn! Final Product 1: Above: 5 plate stacked configuration. Below: Stacked configuration in can. (Minus lid)

RockOn! Final Product 2: SolidWorks model and actual picture of structural RockSat can. 5 Plate Stack Stand-offs attached to Top Lid. Barrel Section attached to Top Lid (8 Places) Assembled can with payload ~20 pounds

RockOn! Groups and Hardware RockOn! 2008

115 Group Formation: To Begin: - Examine your plate for a serial number. The leading number indicates which can your team flies in, and the last two digits indicate plate number. Can Number Plate Number

RockOn! Group Formation 2: -Find the other four (4) groups that have the same can number and sit together. (5 Plates total) -The assistants will come around and pass out the hardware that each team will need to build the RockSat can structure.

RockOn! Required Hardware 1: -One (1) Top Bulkhead-One (1) Bottom Bulkhead

RockOn! Required Hardware 2: -One (1) 9/64 hex key -Two 5/16 open-end wrenches -Twenty (20) long male- female (MF) stand-offs Hex Key Wrenches

RockOn! Required Hardware 3: -Five (5) male- female (MF) short (cut-off) stand-offs -Five (5) female- female (FF) stand-offs -Sixteen (16) 3/8” bolts -Five (5) 5/8” bolts 5/8” 3/8”

RockOn! Required Hardware 4: -Ten (10) locking washers -Five (5) 1/2’’ bolts 1/2”

RockOn! An Update RockOn! 2008

122 Update Note: -Some AVR boards were too close to a support stand-off during fit checks.

RockOn! Update Note: -To help alleviate the issue, a small chunk was nipped from the edge of the board. -This should resolve the issue. -If at any time you are unsure if you may be doing damage to your board while installing stand-offs, please raise your hand.

RockOn! Let’s Begin The Integration RockOn! 2008

125 Bottom Plate “01” Step 1: -Take one (1) short stand-off and place the male end through one of the 5 holes on the plate with the serial number ending in “01.” -The threaded end should protrude on the top side of the plate

RockOn! Bottom Plate “01” Step 2: -Screw on one (1) FF stand-off to the short MF stand-off you added. -Important: Tighten by hand until you cannot turn it anymore.

RockOn! Bottom Plate “01” Step 3: -Use your wrenches to tighten the stand-off an extra quarter turn. (90° or π/2 radians)

RockOn! Bottom Plate “01” Step 4: -Repeat the previous steps to add the other four (4) MF and FF stand-offs to plate “01” as shown. -Plate “01” should look similar to the pictures to the left.

RockOn! Plate “02” Step 1: -Take one (1) long stand-off and place the male end through one of the 5 holes on the plate with the serial number ending in “02.” -The threaded end should protrude on the bottom side of the plate to thread into the FF stand-off on plate “01.”

RockOn! Clocking: -Clocking is a technique where each plate is rotated 180° relative to the previous plate. -Clocking is used here to better balance the RockSat cans due to the CG not being exactly at the geometric center of the plate. AVR 01 AVR 03 AVR 05 AVR 02 AVR 04

RockOn! Plate “02” Step 2: Clocked 180° -Clock or rotate plate “02” 180° such that the AVR boards are opposite to each other. -Hand tighten the MF stand-off until you can turn it no further. MF Stand-Off

RockOn! Plate “02” Step 3: -Use your wrenches to tighten the stand-off an extra quarter turn. (90° or π/2 radians)

RockOn! Plate “02” Step 4: -Repeat the previous steps to mate the MF stand-offs into the FF stand-offs on the deck below. -Plates “01” and “02” should look similar to the pictures to the left

RockOn! Plate “03” Step 1: -Take one (1) long stand-off and place the male end through one of the 5 holes on the plate with the serial number ending in “03.” -The threaded end should protrude on the bottom side of the plate to thread into MF stand-off on plate “02.”

RockOn! Plate “03” Step 2: -Clock or rotate plate “03” 180° such that the AVR boards on plate “02” and “03” are opposite to each other. -Hand tighten the MF stand-off until you can turn it no further. Clocked 180° MF Stand-Off

RockOn! Plate “03” Step 3: -Use your wrenches to tighten the stand-off an extra quarter turn. (90° or π/2 radians)

RockOn! Plate “03” Step 4: -Repeat the previous steps to mate the MF stand-offs into the MF stand-offs on the deck below. -Your stack should resemble the picture to the left

RockOn! Plate “04” Step 1: -Take one (1) long stand-off and place the male end through one of the 5 holes on the plate with the serial number ending in “04.” -The threaded end should protrude on the bottom side of the plate to thread into MF stand-off on plate “03.”

RockOn! Plate “04” Step 2: -Clock or rotate plate “04” 180° such that the AVR boards on plate “04” and “03” are opposite to each other. -Hand tighten the MF stand-off until you can turn it no further. Clocked 180° MF Stand-Off

RockOn! Plate “04” Step 3: -Use your wrenches to tighten the stand-off an extra quarter turn. (90° or π/2 radians)

RockOn! Plate “04” Step 4: -Repeat the previous steps to mate the MF stand-offs into the MF stand-offs on the deck below. -Your stack should resemble the picture to the left

RockOn! Plate “05” Step 1: -Take one (1) long stand-off and place the male end through one of the 5 holes on the plate with the serial number ending in “05.” -The threaded end should protrude on the bottom side of the plate to thread into MF stand-off on plate “04.”

RockOn! Plate “05” Step 2: -Clock or rotate plate “05” 180° such that the AVR boards on plate “05” and “04” are opposite to each other. -Hand tighten the MF stand-off until you can turn it no further. Clocked 180° MF Stand-Off

RockOn! Plate “05” Step 3: -Use your wrenches to tighten the stand-off an extra quarter turn. (90° or π/2 radians)

RockOn! Plate “05” Step 4: -Repeat the previous steps to mate the MF stand-offs into the MF stand-offs on the deck below. -Your stack should resemble the picture to the left

RockOn! Bottom Bulkhead 1: -Carefully turn the stack upside down. -Place the bottom bulkhead (with the outer bolt circle) on the bottom of the stack -Make sure the notch aligns with the set of blue RBF wires as shown.

RockOn! Bottom Bulkhead 2: -Take one (1) 1/2” bolt and locking washer and hand screw it into the center stand-off as shown.

RockOn! Bottom Bulkhead 2: -Lightly tighten the 1/2” bolt and lock washer with the hex key. -Important: Don’t not over tighten the bolt. After all bolts are in, they will be torqued to 30 in*lbs.

RockOn! Bottom Bulkhead 3: -Insert and tighten the remaining four (4) 1/2” bolts and washers on the bottom bulkhead. -Note: Add the bolts in an alternating fashion (like tire lug nuts) as indicated above. Tighten until bolts are flush with the plate

RockOn! Bottom Bulk Head 4: -Have two people in the group carefully rotate the stack 180° so that it now rests on the bottom bulkhead. -Your stack should resemble the picture to the left.

RockOn! Outer Skin 1: -Ensure that the blue wires all pass down the channel with the LEDs. -Also check that no wires or objects are on the edge of any of the plate. -Place the outer skin onto the bottom bulkhead.

RockOn! Outer Skin 2: -Align the outer skin to allow the skin and bulkhead holes to line up. -By hand, screw in all eight (8) 3/8” bolts through the skin to attach it to the bottom bulkhead. Good Alignment -Important: Do not over tighten the bolts. The bolts will be torqued to 30 in*lbs 8 Total

RockOn! Outer Skin 3: -Use the hex key to lightly tighten all eight (8) 3/8 bolts -Note: Use an alternating pattern (like tire lug nuts). -Caution: Do not over tighten the bolts. The bolts will be torqued to 30 in*lbs once all structural bolts are installed.

RockOn! Outer Skin 4: -Your structure should now resemble the picture to the left.

RockOn! Outer Skin 5: -Place the top bulkhead on the stack as shown to the left. -Make sure that the notch aligns with the wire path way.

RockOn! Outer Skin 6: -Align the outer skin to allow the skin and bulkhead holes to align. -By hand, screw in all eight (8) 3/8” bolts into the skin to attach it to the top bulkhead. Good Alignment 8 Total

RockOn! Outer Skin 7: -Use the hex key to lightly tighten all eight (8) 3/8 bolts -Note: Use an alternating pattern (like tire lug nuts). -Caution: Do not over tighten the bolts. The bolts will be torqued to 30 in*lbs once all structural bolts are installed.

RockOn! Outer Skin 8: -Your structure should now resemble the picture to the left.

RockOn! Top Bulk Head 1: -You might find that your top bulkhead bolts don’t align perfectly. -If this is the case, reach in through a window and apply a small amount of force to achieve alignment.

RockOn! Top Bulkhead 2: -Once alignment is achieved, insert one (1) 5/8” bolt and lock washer into the center hole. -Lightly tighten the bolt with the hex key. -Important: Leave this bolt loose enough to make slight adjustments to the other four (4) bolts.

RockOn! Top Bulkhead 3: -By hand, lightly screw in the other four (4) 5/8” bolts and lock washers.

RockOn! Top Bulkhead 4: -Use your hex key to tighten all five (5) 5/8” bolts and lock washers on the top of the bulkhead.

RockOn! Top Bulkhead 5: -Your structure should look like this, but with more wires coming down the pass-through. -Note: All LEDs and connectors should be visible in the wire way.

RockOn! Final Product: Congratulations! You have completed integration of your payload with the RockSat can. We will now walk through a shorting plug test, pull the RDY LED, and get all structural bolts torqued and ready for the hand-off to Wallops engineers!