June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 1 Status of gaseous DHCAL R&D in Europe Vladimir Ammosov, IHEP – Protvino IPNL,LAL, LAPP, LLR, SACLAY.

Slides:



Advertisements
Similar presentations
1 m 3 Prototype Digital Hadron Calorimeter Collaborators Argonne National Laboratory Boston University University of Chicago Fermilab University of Texas.
Advertisements

Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
Digital Hadron Calorimetry using Gas Electron Multipliers Andy White University of Texas at Arlington.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Micromegas for a DHCAL LAPP, Annecy Catherine Adloff Jan Blaha Sébastien Cap Maximilien Chefdeville Alexandre Dalmaz Cyril Drancourt Ambroise Espagilière.
Andy White U.Texas at Arlington (for J.Yu, C.Han, J.Li, D.Jenkins, J.Smith, K.Parmer, A.Nozawa, V.Kaushik) 10/18/04 IEEE/NSS Digital Hadron Calorimetry.
November 5, 2004V.Ammosov ITEP-Moscow, Russian CBM meeting 1 IHEP possible participation in CBM TOF system Vladimir Ammosov Institute for High Energy Physics.
CALICE meeting Prague 2007, Hervé MATHEZ 1 DHCAL PCB STUDY for RPC and MicroMegas (Electronics recent developments for the European DHCAL) William TROMEUR,
Sept. 24, Status of GEM DHCAL Jae Yu For GEM-TGEM/DHCAL Group Sept. 24, 2010 CALICE Collaboration Meeting Univ. Hassan II, Casablanca Introduction.
CALICE ECAL/AHCAL Electronics 5-6 July DESY L.Caponetto, H.Mathez 1 Developments and Planning towards 1 m 3 Technological DHCAL Prototype Didier.
Second generation Front-end chip for H-Cal SiPM readout : SPIROC DESY Hamburg – le 13 février 2007 M. Bouchel, F. Dulucq, J. Fleury, C. de La Taille, G.
C. Combaret TILC april m2 GRPC Acquisition System C. Combaret, IPN Lyon For the EU DHCAL collaboration
Towards an RPC-based HCAL Design Stephen R. Magill Argonne National Laboratory Digital HCAL for an E-Flow Calorimeter Use of RPCs for DHCAL RPC Design.
Development of a DHCAL with Resistive Plate Chambers ECFA/DESY Workshop at NIKHEF, Amsterdam, Netherlands April 1 - 4, 2003 José Repond Argonne National.
Progress towards a technological prototype for a semi-digital hadron calorimeter based on glass RPCs Nick Lumb Paris, 8 October 2010.
José Repond Argonne National Laboratory Status of the DHCAL Project SiD Collaboration Week January 12 – 14, 2015 SLAC.
V. Ammosov 13th CBM meeting,GSI,March 10 1 Beam test of pad tRPCs with ultra-thin glass Status of IHEP+INR activity for high rate RPCs.
08/10/2007Julie Prast, LAPP, Annecy1 The DHCAL DIF and the DIF Task Force Julie Prast, LAPP, Annecy.
Progress towards a technological prototype for a semi-digital hadron calorimeter based on glass RPCs Nick Lumb International Linear Collider Workshop Beijing,
RPC detection rate capability ≈ 1/ρ Float-Glass ( Ω-cm) RPC rate capability < Bakelite( Ω-cm) one. New kind of doped glass was developed.
Front-End electronics for Future Linear Collider calorimeters C. de La Taille IN2P3/LAL Orsay on behalf of the CALICE and EUDET collaborations
Catherine Adloff16 June 2009 CALICE Technical Board 1 DHCAL-MICROMEGAS Yannis KARYOTAKIS For the LAPP group.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
M. Chefdeville LAPP, Annecy, France. Introduction  Motivations for a Digital hadronic calorimeter Count hits instead of measuring energy deposits Reduce.
J. Prast, G. Vouters, Arlington, March 2010 DHCAL DIF Status Julie Prast, Guillaume Vouters 1. Future CCC Use in DHCAL Setup 2. Calice DAQ Firmware Implementation.
The DHCAL Data Analysis José Repond CALICE Meeting, Prague, September 10 – 12, 2007.
July 8, 2003V.Ammosov GSI, CBM meeting1 RPC TOF system for HARP experiment (Applicability for CBM) Vladimir Ammosov Institute for High Energy Physics Protvino.
Towards a 1m 3 Glass RPC HCAL prototype with multi-threshold readout M. Vander Donckt for the CALICE - SDHCAL group.
May 31, 2007CALICE DHCAL J. Yu 1 Gas DHCAL R&D May 31, 2007 WWS CAL R&D Review, DESY Jae Yu University of Texas at Arlington For CALICE DHCAL Groups Introduction.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
Application of Large Scale GEM for Digital Hadron Calorimetry Jae Yu For GEM DHCAL Group June 11, 2011 TIPP 2011 The Goals 30cmx30cm 2D readout with KPiX.
A Hadron Calorimeter with Resistive Plate Chambers José Repond Argonne National Laboratory CALOR 2006, Chicago, June 5 – 9, 2006.
MicroMegas for DHCAL Status and activities at LAPP Catherine Adloff Jan Blaha Sébastien Cap Maximilien Chefdeville Alexandre Dalmaz Cyril Drancourt Ambroise.
Second generation Front-End ASICs for CALICE LCWS07 Hamburg C. de La Taille IN2P3/LAL Orsay On behalf of the CALICE collaboration HaRDROCSKIROCSPIROC.
Marcello Abbrescia RPCs for CMS during Phase II RPC rate capability M. Abbrescia, The dynamic behaviour of Resistive Plate Chambers, NIM A 533 (2004) 7–10.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
The Prototype Simulation of SDHCAL Ran.Han Gerald.Grenier Muriel.Donckt IPNL.
Julie Prast, Calice Electronics Meeting at LAL, June 2008 Status of the DHCAL DIF Detector InterFace Board Sébastien Cap, Julie Prast, Guillaume Vouters.
Front-End electronics for Future Linear Collider calorimeters C. de La Taille IN2P3/LAL Orsay On behalf of the CALICE collaboration
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
HARDROC: Readout Chip for CALICE/EUDET Digital Hadronic calorimeter Nathalie Seguin-Moreau.
HaRDROC performance IN2P3/LAL+IPNL+LLR R. GAGLIONE, I. LAKTINEH, H. MATHEZ IN2P3/IPNL LYON M. BOUCHEL, J. FLEURY, C. de LA TAILLE, G. MARTIN-CHASSARD,
12/09/2007Julie Prast, LAPP, Annecy1 The DIF Task Force and a focus on the DHCAL DIF Remi Cornat, Bart Hommels, Mathias Reinecke, Julie Prast.
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
June 13rd, 2008 HARDROC2. June 13rd, 2008 European DHCAL meeting, NSM 2 HaRDROC1 architecture Variable gain (6bits) current preamps (50ohm input) One.
News from the 1m 2 GRPC SDHCAL collection of slides from : Ch.Combaret, I.L, H.Mathez, J.Prast, N.Seguin, W.Tromeur, G.Vouters and many others.
SKIROC status Calice meeting – Kobe – 10/05/2007.
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
DHCAL Acquisition with HaRDROC VFE Vincent Boudry LLR – École polytechnique.
HARDROC HAdronic Rpc ReadOut Chip
Test Beam Request for the Semi-Digital Hadronic Calorimeter
The European DHCAL status
CEPC 数字强子量能器读出电子学预研进展
DHCAL TECH PROTO READOUT PROPOSAL
A Digital Hadron Calorimeter Resistive Plate Chambers
SiD Calorimeter R&D Collaboration
Status of the DHCAL DIF Detector InterFace Board
GRPC activity for EuDHCAL in IHEP-Protvino
Status of GEM DHCAL Andy White RD51 Collaboration Meeting CERN
Semi-Digital Hadronic CALorimeter
Tao Hu, Jianbei Liu, Haijun Yang, Boxiang Yu For the CEPC-Calo Group
C. de La Taille IN2P3/LAL Orsay
CALICE/EUDET Electronics in 2007
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
HaRDROC status: (Hadronic RPC Detector Read Out Chip for DHCAL)
HaRDROC status: (Hadronic RPC Detector Read Out Chip for DHCAL)
Pre-installation Tests of the LHCb Muon Chambers
AIMS 1- Build SDHCAL prototype of 1m3 as close as possible to the one
Test Beam: Calorimetry
Presentation transcript:

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 1 Status of gaseous DHCAL R&D in Europe Vladimir Ammosov, IHEP – Protvino IPNL,LAL, LAPP, LLR, SACLAY CIEMAT, DESY, IHEP, UK DAQ groups Cooperation

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 2 Outline   R&D with small gaseous prototypes   Toward ILC DHCAL prototyping

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 3 DHCAL motivation Particle Flow Approach requires high longitudinal and transverse granularity in calorimetry for precise jet measurement It implies highly segmented steel sandwich hadron calorimeter (HCAL) Digital Hadron Calorimeter (DHCAL) may provide fine segmentation (~1cm 2 ) with simplest yes/no read out system which is enough for neutral hadron pattern recognition and muon ID

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 4 Gaseous active medium candidates Pad array Mylar sheet FR4 sheet 0.55mm Glass sheet 0.85mm Glass sheet Resistive paint (On-board front-end) 1.2mm gas gap -HV GND RPC gain ~10^8, low rate or pads MicroMegas gain ~10^5, high rate IHEP (Protvino) + collaborators R&D is advanced LAPP (Annecy) + collaborators R&D is started

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 5 DHCAL RPC performance RPC pad size GEANT 3.2 simulation of DHCAL response for pions 38 layers – 2cm SS absorber, 6.5 mm RPC RPC – 1.2 mm gas monogap, TFE gas, glass as resistive plates MIP/2 cut nonlinearity is taken into account 1x1 cm2 pads case is compatible when all hits are counted Preliminary R M ~ 1.65 cm

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 6 DHCAL RPC performance It was choosen in beam tests in IHEP with small 4x4 pads RPCs 5 GeV/c h + beam RPC samples   1.2, 1.6, 2.0 gaps    cm window glass   4x4 pads of 1x1 cm 2 In saturated avalanche and streamer modes with TFE based mixtures: avalanche: TFE/IB/SF6=(90-93)/5/(5-3) % streamer : TFE/IB/Ar or N2=80/10/10 % Trigger S1  S2  S3  S4 for 2x2 cm 2 area FE(D i ) – 16 ch. preamp+disc based on discrete elements, on side Avalanche mode was selected

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 7 RPC in avalanche mode Typical Q and m distributions 1.2 mm, 2% SF 6, 8.4 kV - working point, 2.2 mV thr Q ~ 10 7 e2 adj pads Mean 2.8 pC RMS 1.6 pC Mean 1.47 RMS 0.58

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 8 RPC in streamer mode Typical Q and M distributions, 200 V above knee 1.2 mm gap, TFE/Ar/IB=80/10/10 FWHM=20% RMS/Q=0.6 No ways to suppress multi streamer tail

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 9 Comparison of avalanche and streamer modes Rate capability streamer ~2-3 Hz/cm 2 avalanche ~100 Hz/cm 2 It is hard to work in streamer mode even for usual beam conditions Streamer is suitable only for very low rates like e+e - ILC

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 10 Comparison of avalanche and streamer modes As example, for 1.2 mm gap

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 11 DHCAL RPC features Geant3 simulations It seems eff down to 80% does not hurt resolution much It seems up to does not hurt resolution much

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 12 Summary of RPC features 14 mm AHCAL

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 13 Combined RPC Our results confirm first observation of ANL group about combined RPC – low hit multiplicity, ~ 1.1 at 95% with 400 V plateau. It seems that the combined RPC is promising option for the DHCAL. Long term stability study of combined RPC is underway.

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 14 RPC performance selection and design 1.2 mm monogap glass RPC, saturate avalanche mode 98% eff, 1 kV plateau, ~1.4 mult Combined RPC – mult < mm AHCAL

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 15 Tests of 64 channels RPCs in 5T mag field PCB is on side of RPC and includes 8 channel MINSK chips OKA (amp.+disc.), ALTERA EP1K50 as FPGA and RS232 driver for sequental read out with PC FPGA - -Signals written on coincidence with trigger 64 bits for signals + 10 bits for trigger N - -Info is storaged in FIFO - -Read out by PC with end of spill signal RPCs with 8x8 pads of 1x1 cm2 area were tested with new specially designed 64 channel FEE trigge r End of spill OKA ALTERA RS232

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 16 Tests of 64 channels RPCs in 5T mag field There is no evidence of the 5Tmagnetic field influence on the RPC performance

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 17 Tests of 32x32 pads RPC RPC with sensitive area of 36x96 cm2 was produce to incorporate 32x32 =1024 pads of 1 cm2 area. For read-out the 2 anode PBs with 16x32=512 pads were used. Connections between pads and the 64 ch. FEE are made by microcoax 50 ohm cables. Cosmic ray tests were done due to lack of beam time. It was concluded that on side FEE is dead end for 1 m2 plane. Special on board ASIC with serial output is needed.

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 18 R&D is ongoing for µMEGAS chambers with 8X8 pads, 6X16 pads, 50X50 pads of 1cm2 (collaboration with Saclay ) to select the performance for DHCAL DHCAL µMEGAS Study 6X16 pad µMEGAS chamber(LAPP,IPNL)

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 19 1m 3 DHCAL prototype It is intended to construct ~1m3 DHCAL prototype with solutions near ILC detector requirements: Single active layer plane (no dead zones) ASIC with power pulsing On board front end CALICE DAQ2 system Integrated gas, HV, LV systems Furthermore it is needed to validate gaseous approaches, to compare with MC simulations and Sc. HCAL If 1x1 cm2 cells and 40 layers with 20 mm steel plates as absorber then ~400,000 channels are needed Existing mechanical structure can be used Key question is FE ASIC Two steps in realization:  Slab construction and tests  Full ~1m3 construction and tests Comparison of hadron shower simulation codes by G Mavromanolakis

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 20 ASIC – HARDROC1 Full power pulsing Digital memory: Data saved during bunch train. Only one serial output Store all channels and BCID for every hit. Depth = 128 bits Data format : 128(depth)*[2bit*64ch+ 24bit(BCID)+8bit(Heade r)] = 20kbits Sequential 1 MHz NSM Was produced and tested successfully LAL, IPNL, LLR

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 21 Test board with packaged HaRDROC chip Ch7 Xtk Ch8 *10 Discri out/10 Scope, 50Ω) Chip performance are found as expected. Low channel-to-channel X-talk (<2%)

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 22 HARDROC1 PERFORMANCE SUMMARY Number of inputs/outputs 64 inputs, 1 serial output Input Impedance50-70Ω Gain Adjustment0 to 4, 6bits, accuracy 6% Bipolar Fast Shaper≈3.5 mV/fC tp=15ns 10 bit-DAC2.5 mV/fC, INL=0.2% Trigger sensitivityDown to 10fC Slow Shaper (analog readout) ≈50 mV/pC, 5fC to 15pC, tp= 50ns to 150ns Analog Xtk2% Analog Readout speed5 MHz Memory depth128 (20kbits) Digital readout speed5MHz or more Power dissipation (not pulsed) 100 mW (64 channels)

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 23 Slab study 4 areas of 64 pads of 1 sq cm : bottom layer Hardroc external components : top layer FPGA 8x32 pads RPC/µMEGAS 410

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 24 8x32 pads RPC 4 RPCs with 8x32 read out pads were produced. One chamber was sent to Lyon. Chambers are waiting for anode PCBs with HADROCK chips

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg µ thick 8-layers PCB with blind and buried vias 8X32 pads, 1 cm2 surface with 500µ separation between pads 6 PCBs were produced X-talk measurement (<0.3 %) 8x32 pads PCB

DHCAL Acquisition with HaRDROC VFE – Kobe may '07 26 DAQ for Slab VFE ASIC Data ADC I/O Buffer FE-FPGA BOOT CONFIG Data Format Zero Suppress Protocol/SerDes FPGA Config/Clock Extract Clock Bunch/Train Timing Config Data Clk Slab FE FPGA PHY Data Clock+Config+Control VFE ASIC Conf/ Clock VFE ASIC VFE ASIC VFE ASIC RamFull Analog output 8×32 test card (Being equiped) DIF USBUSB SCSISCSI

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 27 Assembly (soldering) of 3 PCBs June 10 Check of soldering PCBs June 15 Development of the DAQ June 15 Full assembly of one 8x32 RPC end of June Tests with cosmics July CRITICAL Tests in e beam at DESY September Tests of µMEGAS Slab in cosmics October Comparison of RPC and µMEGAS performance N.B : The PCB was conceived to be compatible with µMEGAS detector as well. Time schedule 2007 for Slab study

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 28 ~1m3 DHCAL prototype If Slab tests are OK and funding is available then roughly: Construction, cosmics tests of 1st 1m2 RPC plane with strips in IHEP, sending to Lyon. The same for µMEGAS in Annecy. Dec07 Construction of cosmics stand for tomography of pad 1m2 RPC Dec07 planes in Lyon Comparison between RPC/µMEGAS performance in Lyon Jan08 with cosmics stand to select the proper active media for the DHCAL prototype. Final Hardrock, PCB, DAQ Build elements of DHCAL prototype Dec08 Assembly and beam tests of the DHCAL prototype Jun09

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 29 IPNL(Lyon) starts to be DHCAL center RPCµMEGAS

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 30 1m 2 RPC plane As prototype for 1 m3 DHCAL prototype SS cup Cathode strip PB Anode pads PB glasses Al bar spacer g. v x96 = 9216 anode pads in total 24 anode PCBs of 80x530 mm2 8x48 = 384 pads on each = 6 Hardrock ASIC SS cups and Al bar frame form hermetic box. It prevents glass break due to gas overpressure. 1000x1030 mm2 - lateral dimensions 970 x 970 mm2 – glass area 960 x 960 mm2 – sensitive area Weight ~ 40 kg A-A cross section

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 31 1m 2 RPC plane with strip read out Construction of 1 m2 RPC plane Gas volume: anode glass – 0.5 mm thick, cathode glass – 0.8 mm thick, 1.2 mm gas gap, 6 mm dia spacers 96x6 cm2 strips for read-out 16 anode (x) strips 16 cathode (y) strips

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 32 Detailed study of the plane was performed in cosmic rays. In general :  the plane is robust and hermetic;  inefficiency of about 6% is compatible with the geometrical one due to spacers;  uniformity of efficiency on the large scale (0.06 m2 area) is (94+/-2)%;  current in HV circuit is 1  A;  noise at the plateau knee of about 0.45 Hz/cm2 is acceptable. Tests of 1m 2 RPC plane with strip read-out

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 33 Conclusion   Many efforts on gaseous DHCAL are going on in Europe.   European DHCAL project has the ambition to be as close as possible to ILC detector requirements.   European project is complementary to the american one.   It is hoped that the two projects merge in the future.

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 34 Layout in 8 layers (solution1) Blind viaBuried viaThrough via TOP GND DIGITAL SIGNAL POWER ANALOG SIGNAL GND BOTTOM TOP LAYER : Component layer GND : Ground layer and access to internal layers DIGITAL SIGNAL : Layer to interconnect between hardroc and FPGA POWER : Power to hardroc ANALOG SIGNAL : Layer to interconnect pad signals BOTTOM : RPC pads layer Layer definition ( except FPGA area )

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 35 Layout in 6 layers (solution2) TOP LAYER : Component layer+interconnect between hardroc and FPGA GND : Ground layer and access to internal layers POWER : Power to hardroc ANALOG SIGNAL : Layer to interconnect pad signals BOTTOM : RPC pads layer Layer definition ( except FPGA area ) Blind viaBuried viaThrough via TOP GND POWER ANALOG SIGNAL GND BOTTOM

June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 36

DHCAL Acquisition with HaRDROC VFE – Kobe may '07 37 DAQ2 (needed for the m³) DIF: Det. Specific. FE –To be defined next... Constraints (M. Wing): LDA: concentrator card –1 Gbits/s output –Up to 50 DIF input (#pins of the FPGA) ➔ 20 Mbits/s per DIF ODR: readout card –Can reads 2 1 GB/s –Links are expensive DHCAL