The organization and on-site follow up of the electrical installation work for the LHC The organization and on-site follow up of the electrical installation.

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

SIEP HSE Management System
Appoint a CDM – Coordinator if is notifiable. What is notifiable Prevent work starting if if no coordinator and council not notified. Retain a health and.
AUDITS AND INSPECTIONS
LHC Performance Workshop - Chamonix January 2010 Session 4 - Safety for Personnel Underground - He Evacuation What can the Safety Coordination.
Presentation for health and safety coordination CERN Safety Coordination Mission and Role M. Arnaud, C. Bedel, J. Etheridge, E. Paulat.
Safety Management of the LIU Project A. Funken Anne Funken, LIU PT 21/05/15.
M. Scharfenstein - ES&H Coordinator 8 June 2009
Process Engineer’s Role in Project Management Dr Abdullah Malik.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Course Overview Course Requirements Knowledge and Skills Student Expectations.
Interaction of ST & TIS in matters of safety Mandate & OrganisationMandate & Organisation InteractionsInteractions Basis for cooperationBasis for cooperation.
Firefighter III Introduction Mod A Identify the Firefighter III’s role as a member of the organization. (4-2.1) The role of a firefighter III.
Company’s short presentation. General presentation We offer a complete package of professional Occupational Health and Safety services; We hold the certification.
17 July 2002RSOC presentation G.D. 1 NEW SAFETY CODE A9 Origin –Revision of SAPOCO 42 document Main modifications: –Official name becomes SAFETY POLICY.
U D T Workshop on the Pressure Equipment Directive, Warsaw June 2004 INTERFACES BETWEEN NATIONAL LEGISLATION AND DIRECTIVE 97/23/EC SYSTEM OF ENSURING.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
H&S Consultants Consulting Services and Project Management.
Health and Safety Policy
1 Exotic Disease Response Training Introduction to Organism Management.
Prime Responsibility for Radiation Safety
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
6th ST workshop, Thoiry, 1-3 April ST-HM Design Section Strategy and working methods 3rd April 2003 C. Bertone ST-HM.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
Marc Tavlet - GLIMOS1 Paperwork needed to come and work at CERN 1. Access Rights – Registration 2. Tests with Beams 3. Safety Procedures to work at Point-2.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
CERN EN-EL Cabling and Optical Fibre Section CERN EN-EL Cabling and Optical Fibre Section Mini Workshop, Simao Machado, EN/EL/CF.
The new approach to the CERN Safety Policy and Safety Organisation A. Goehring-Crinon & R. Trant.
LS2 Safety Thomas Otto, LS2 Safety Coordinator.
CERN Safety Coordination How it functions. CERN Safety: Who is Responsible?  Everyone present on CERN’s site, i.e. staff, members, and contractors alike.
GLM 22/10/2002 E.Sánchez-Corral, L. Symons / ST D. Mathieson /AS 1 AOC Project Progress Report Organization Scope, Strategy, Objectives Status: – specification,
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
M. Arnaud, C. Bedel, J. Etheridge, E. Paulat CERN SAFETY AND COORDINATION TEAM.
Review of Sector th of February Electrical Safety for the interventions during Hardware Commissioning of LHC Anne Funken, TS-ICC.
Last but not least : LS2 General Safety 1 Thomas Otto, LS2 Safety Coordinator for LHC Ana-Paula Bernardes, LS2 Safety Coordinator for Injectors.
TE-CRG-CE OMP Meeting 06 / 11 / 2014TE-CRG-CE OMP Meeting.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
International Technical Safety Forum CERN, Geneva, Switzerland, April 12-16, 2010 CERN Safety Coordination How it functions M. Arnaud, C. Bedel, J. Etheridge,
Health and Safety Coordination at CERN Environmental Health and Safety managing risks today for a safer tomorrow John Robert Etheridge, Emmanuel Paulat,
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. General.
Sustainable Direction Ltd PM – The STH Way sustainable direction ltd. 6 Twigworth Court Business Centre Twigworth, Gloucester GL2 9PG UK T +44 (0) 1452.
Edexcel BTEC Level 2 Diploma in Construction Members of the Construction Team Unit 1 Structure of the Construction Industry.
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
Being TSO at CERN Safety at CERN Being TSO at CERN Safety at CERN.
Some arrangements for personnel safety 1- Procedures for access
CERN Construction Planning and Scheduling (LHC installation)
National Standards for Athletic Coaches
WP 3 How to assess implementation of ALARA
Safety in Construction and Upgrade Phases
HSE rules & regulations
Quality Assurance applied to Accelerator Safety
FC facilitation of Installations
EP Experiments safety validation process Safety Permits
Workshop on Accelerator Operations
M. Scharfenstein - ES&H Coordinator 14 May 2009
Installation Binder / IRR – an example
Workshop commissioning Installation Coordination at ESS
Ian Evans SSRL Safety Office
PSS verification and validation
DOE Review of the LCLS Project October 2006
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Work and Service Supervisor
CR-GR-HSE-419 Safety of excavation works
Presentation transcript:

The organization and on-site follow up of the electrical installation work for the LHC The organization and on-site follow up of the electrical installation work for the LHC A. Vairo 6 th ST Workshop April 2003

ST Workshop April 2003 A. Vairo ST/EL-WO Organization and follow up on site. The following has been mandate to the section ST/EL-WO: Management of the works for new electrical installations Tests for commissioning The results of these activities are:  An installation that is in conformity with the specifications, delivered within the scheduled time.  Ready for handover and commissioning by the EL-MO section

ST Workshop April 2003 A. Vairo ST/EL-WO Works managers’ role:  Manage the on site logistic of the work  Check all the necessary administrative task for the contractors  Organize the inspections at the start of the work (safety and technical)  Assure the safety during the execution of the works (in collaboration of the safety inspectors)  Set up provisional electrical power for the work  Organize, with the operation section the power outage.  Site coordination of the activities of the contractors  Follow up of the planning during the execution of the works  Perform tests for commissioning

ST Workshop April 2003 A. Vairo ST/EL-WO

ST Workshop April 2003 A. Vairo ST/EL-WO

ST Workshop April 2003 A. Vairo ST/EL-WO Management of the installation works ST/EL Installation Works Works Manager Project documents Study phase Project Manager Overall schematic of the installation Lay out of the equipement List of cables Equipement documents Data for the protection relais Planning Etc. Feedback

ST Workshop April 2003 A. Vairo ST/EL-WO Interface with the contractors General CERN regulations and instructions:  “Regles de securite applicable aux activites des enterprises sur le domain du CERN”. · IS 39, Notice of start of works (AOC). · Overall safety coordination and health protection plan. · Sapoco 42, Basic safety regulations and rules Consequent actions: Check that the contractors have all the necessary documents to perform work. Verify that all the personnel followed the appropriate safety course and are in possession of the necessary official documents Establish the Notice of Start of Works (AOC, “Avis d’Ouverture de Chantier”). Verify, in collaboration with the safety coordinators, the aspects of the Safety Prevention Plan with respect to the job. Carry out regular site inspections. Contracts set up with the contractors specific ST/EL.

ST Workshop April 2003 A. Vairo ST/EL-WO Interface with the ST/EL main contractors. The large majority of the installation work is done by holders of contracts C170/ST and C171/ST The interface to these contractors is governed by the Quality Plans The interface of the contractors to CERN is covered by means of procedures dealing with all the phases of development of a job. These procedures have been developed in collaboration with the CERN. Efficent processing of all non conformities.

ST Workshop April 2003 A. Vairo ST/EL-WO On site coordination

ST Workshop April 2003 A. Vairo ST/EL-WO

ST Workshop April 2003 A. Vairo ST/EL-WO

ST Workshop April 2003 A. Vairo ST/EL-WO On site coordination between different disciplines Regular on site coordination meetings in the context of the LHC Installation and Coordination organization, or in the context of experimental areas coordination. This coordination aims at solving interface problems between different trades either: On site or Bringing up the information at the r competent level

ST Workshop April 2003 A. Vairo ST/EL-WO Coordination of the works at different levels EL group coordination: Follow up of the advancement of the works, checking the conformity with the general planning LHC. Presence of the LHC planning team. Review the preparation of the works The main contractors being present at the meeting, solution can be immediately analized. ST/EL inscribes itself in the ST coordination for LHC works Coordination of the installation of the LHC machine ( or experimental areas): Review all the installation works for the LHC. Coordination, logistic, safety

ST Workshop April 2003 A. Vairo ST/EL-WO Test of the installation Works Manager Test reports Project Manager Installation ready for commissioning Test of all equipment Functional test of the installation

ST Workshop April 2003 A. Vairo ST/EL-WO Installation hand over to the exploitation service for commissionig The transfer of the installation takes place with a site inspection with the following attendants During the inspection a formal procedure is followed with the check of: Works Manager The exploitation service, section EL-MO Project Manager Representative of TIS User The documents constituting the technical dossier The test reports The dossier must allow the EL/MO section to operate the installation in a safe an proper way. The conformity the installation.

ST Workshop April 2003 A. Vairo ST/EL-WO Conclusions Some data about the activity of the EL-WO section: 40 Notices of Start of Work (AOC) estabilished from the beginning of 2003 From October Medium Voltage installations have been built up and tested

ST Workshop April 2003 A. Vairo ST/EL-WO