Multifunction Phased Array Radar PAR Work Group Magda Batista-Carver September 11, 2007 Legacy Radar Lifecycle Cost Data Analysis Update Magda Batista-Carver,

Slides:



Advertisements
Similar presentations
Session 6: Way Ahead to Address MPAR Risk Reduction— Implementation Strategy and Interagency Management Approach Moderator: Dr. Paul D. Try, Science and.
Advertisements

Friends and Partners in Aviation Weather (FPAW)
Presented to: Right Sizing Team By: Ken Hamm, AJP-6830 Aviation Weather Office Date: July 14, 2010 v0.1 Federal Aviation Administration Aviation Weather.
Transportation Estimators Association Conference Saratoga Springs, New York October 4, 2008 Procedures Guide for Right of Way Cost Estimation and Cost.
ITIL: Service Transition
1 Statewide General Waste Discharge Requirements for Sanitary Sewer Systems BACWA.
Presented to: By: Date: Federal Aviation Administration Early Tests of Aircraft Tracking on NWRT PAR Working Group William Benner, Weather Processors Team.
Presented to: MPAR Symposium By: William Benner, Aviation Weather Group, Operations Planning Date: 12 October 2007 Federal Aviation Administration Multi-function.
Small Projects & Tailoring Using the PPA 1:15 – 2:15 Teresa Kinley, OPHPR With Panelists: Susan Wilkin, NCCDPHP Andy Autry, NCBDDD Carol Waller, NCEH/ATSDR.
Project Integration Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project.
Presented to: MPAR Symposium II By: James Williams – Director, Systems Engineering and Safety Date: 17 November 2009 Federal Aviation Administration Multifunction.
Presented to: MPAR Working Group By: William Benner, Weather Processors Team Manager (AJP-1820), FAA Technical Center Date: 19 March 2007 Federal Aviation.
Future of Surveillance in the National Airspace System
MIT Lincoln Laboratory 2007 MPAR-1 JSH 5/2/2007 Session 2: Current State of Military Investment in PAR Panel Lead: Dr. Jeffrey Herd (MIT LL) Panelists:
Multi-function Phased Array Radar Findings of the Joint Action Group
@ Industrial Engineering by Bopaya Bidanda David I. Cleland.
Centers for Medicare & Medicaid Services eXpedited Life Cycle (XLC) [Insert Project Name] Project Baseline Review (PBR) [Insert Date of PBR] 1.
Presented to: Aerospace Control and Guidance Systems Committee By: Stan Pszczolkowski, Manager, System Analysis Division Date: March 1, 2006 Federal Aviation.
Mr. Samuel P. Williamson Federal Coordinator for Meteorology Sponsored by: The Office of the Federal Coordinator for Meteorological Services and Supporting.
Life Cycle Overview & Resources. Life Cycle Management What is it? Integrated concept for managing goods and services towards more sustainable production.
Unit I Module 2 - NAVAIR RCM Policy and Organization
Presented to: Aerospace Control and Guidance Systems Committee By: Stan Pszczolkowski, Manager, System Analysis Team Date: October 11, 2006 Federal Aviation.
Federal Agency Update - A Public Real Estate Symposium Las Vegas, Nevada January 26, 2010 Procedures Guide for Right of Way Cost Estimation and Cost Management.
1 THE NATIONAL SPACE WEATHER PROGRAM Sixth Symposium on Space Weather Session 1: Space Weather Agency Updates AMS Annual Meeting January 12, 2009 Mr. Samuel.
Presented to: MPAR Working Group By: Garth Torok, Weather Processors Group, Aviation Weather Directorate Date: 21 June 2007 Federal Aviation Administration.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
Common Activities Activities and Tasks in the WBS.
Page 1 Designing for Health; A Methodology for Integrated Diagnostics/Prognostics Raymond Beshears Raytheon 2501 W. University McKinney, TX
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
LBNE Working Group Meeting December 20, :00– 5:00 PM Snake Pit.
P1516.4: VV&A Overlay to the FEDEP 20 September 2007 Briefing for the VV&A Summit Simone Youngblood Simone Youngblood M&S CO VV&A Proponency Leader
Update on Multifunction Phased Array Radar (MPAR)
Presented to: NASA Applied Sciences Weather Program Review By: Warren Fellner, Aviation Weather Office Date: November 18, 2008 Federal Aviation Administration.
Federal Aviation Administration NextGen Environmental Management System (EMS)
PAR Study-1 JSH 3/28/2005 MIT Lincoln Laboratory MPAR Cost-Benefit Discussion Mark Weber Jeff Herd 14 December 2009.
Presented to: By: Date: Federal Aviation Administration Multifunction Phased Array Radar PAR Work Group Magda Batista-Carver June 21, 2007 Radar Operations.
NOAA Aviation Safety Board Meeting May 16, 2006 Lieutenant Commander Debora Barr NOAA Aviation Safety Program.
Office of the Federal Coordinator for Meteorology OFCM Assessment of MPAR Capability to Meet Agency Needs Jud Stailey, OFCM Executive Secretary, MPAR EC.
Joint Planning and Development Office (JPDO) Col Mark Weadon Air Force Weather Deputy for Federal Programs May 17 th,
Federal Aviation Administration FPAW October Delivering NextGen Next Generation Air Transportation System Presented to: FPAW By: Alfred Moosakhanian,
Presented to: By: Date: Federal Aviation Administration NextGen Network Enabled Weather Capability Evaluations Demonstration and Prototyping Information.
Federal Software Asset Management Initiative Concept of Operations Report to the Executive Steering Committee March 8, 2004 Implementing the President’s.
SDC Update June 5, SDC Update – June 2012 Investment Plans submitted to OCIO for approval – Core Network – Firewall – Storage OB2 Heat Reduction.
MPAR Symposium / Implementation Strategy MPAR Risk-Reduction Implementation Strategy Fiscal Year RDT&E NSSL, MIT/LL, others.
Presented to: MPAR Working Group By: Jim Williams, Director of Systems Engineering, Operations Planning Date: 11 September 2007 Federal Aviation Administration.
Tax Administration Diagnostic Assessment Too l PREPARING FOR A TADAT ASSESSMENT.
Parts Management Re-engineering and Warfighter Support International Society of Logistics May 17, 2005 Gregory E. Saunders Director, Defense Standardization.
Multifunction Phased Array Radar (MPAR) Update 1ICMSSR 12/16/11 ICMSSR Meeting December 2011 Doug Forsyth, Co-chair, WG/MPAR.
Presented to: By: Date: Federal Aviation Administration Runway Safety Nextgen Initiatives Capstone 3 Industry Day Paul S. Erway, AJS-4SW, Runway Safety.
GOES-R Series User Readiness Planning and Development May 12, 2004.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
GAO’s Cost and Schedule Assessment Guides U.S. Government Accountability Office Applied Research and Methods Cost Engineering Sciences Jason T Lee, Assistant.
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
Presented to: By: Date: Federal Aviation Administration Florida NextGen Test Bed Demonstration and Prototyping Information Exchange Briefing Alex Nguyen,
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
Implementation Strategy July 2002
Phase 2 Tollgate Review Discussion Template
Phase 3 Tollgate Review Discussion Template
Phase 1 Tollgate Review Discussion Template
Phase 3 Tollgate Review Discussion Template
Phase 2 Tollgate Review Discussion Template
Phase 1 Tollgate Review Discussion Template
Phase 3 Tollgate Review Discussion Template
Phase 1 Tollgate Review Discussion Template
Phase 2 Tollgate Review Discussion Template
Principal Investigator ESTCP Selection Meeting
Principal Investigator ESTCP Selection Meeting
Presentation transcript:

Multifunction Phased Array Radar PAR Work Group Magda Batista-Carver September 11, 2007 Legacy Radar Lifecycle Cost Data Analysis Update Magda Batista-Carver, William J. Hughes Tech Center, FAA Tim Crum, NEXRAD Radar Operation Center, NOAA

Radar Lifecycle Cost Data Collection Analysis being developed in response to MPAR Working Group Action Item # , “Complete life cycle cost analysis for legacy [primary] radar systems” Radar systems under analysis in this study - NEXRAD - TDWR - ASR-8 - ASR-9 - ASR-11 - Long-Range/Enroute Radars* * Includes ARSR-1, -2, -3, -4

Life Cycle Cost Study Team Composition National Oceanic & Atmospheric Administration –Tim Crum –Marty Williams –Russ Cook Department of Defense –Mike Spaulding Office of Federal Coordinator for Meteorology –Mark P. Weadon Federal Aviation Administration –Magda Batista-Carver –Dennis Roofe

Methodology Apply Work Breakdown Structure (WBS) to each system to ensure all life cycle costs are included and that no costs are counted twice. WBS for NEXRAD WBS for FAA Radars 1.0 Maintenance Personnel 5.1 Preventative Maintenance (FAA, AF, NWS) (personnel) 2.0 Materials (reparables, 5.6 Watch Standing Coverage consumables, mod kits) 5.7 Program Support 3.0 Tech Transfer 5.8 Logistics 4.0 Facilities 5.9 In-service Training 5.0 Sustainment (ROC) 5.10 Second-level Engineering 6.0 Communications 7.0 Maintenance Training 8.0 Test Equipment WBSs do not align exactly, but all equivalent costs are captured

Assumptions All costs that contribute to system’s lifecycle cost should be included - Include SLEP and Tech Transfer as well as basic O&M costs in the total Inflationary factors should be industry standard applied to baseline Then-Year (TY) dollars System-unique costs (such data archival for NEXRAD) were included as legitimate costs for operating the particular system Communications costs should only be included if integral to the radar system (i.e. maintenance hotlines, antenna-to-RDA comm lines, etc); all other ancillary comm costs were excluded

Challenges FAA Cost data from Quantech Inc. reports do not go out to target date (2025)—some extrapolation was required Effects of completed Service Life Extension Programs (SLEPs) on life-cycle O&M costs has not yet been quantified No equivalent studies have been accomplished for NEXRAD—analysis had to be done from scratch NEXRAD portion of O&M report will have to be reviewed by ROC Director before release Lack of dedicated resources to apply to the analysis project have slowed process

WSR-88D/NEXRAD O&M Costing Information from the NEXRAD triagencies going into database Identifying source of data and major assumptions: –~7 - year technology “refreshment” of CPUs included –Continuous modification/retrofit/obsolescence avoidance actions projected to continue –More WSR-88D technology transfer and science evolution work/funding than other radars in study

WSR-88D/NEXRAD O&M Costing Plan to “roll up” the data from the agencies and more detailed cost lines into 8 cost categories –Maintenance Personnel –Materials –Technology Transfer –Facilities –Sustainment –Communications –Maintenance Training –Test Equipment Using “then year” dollars and known programmatic trends for cost projections Now primarily in a “tuning” mode to ensure no duplication of costs in database and clarifying issues Need final review and approvals Target March completion

Preliminary Conclusions and Next Steps No firm retirement decisions have been reached on any of the systems under review - Notional end-of-life dates in Table 3-1 of JAG PAR report cannot be substantiated, and are probably too conservative - All system retirement decisions are conditional Team will continue to refine WSR-88D lifecycle data Seeking further information on FAA SLEPs, both total cost and implications for system retirement decisions Barring any major setbacks, team will have a first draft for WG review by March 2008

BACKGROUND

Radar Lifecycle Cost Data Collection Among its tasks, the MPAR WG will perform: “A detailed analysis of the life expectancy of existing legacy radars (i.e., WSR-88D; TDWR; ARSR-1, 2, 3, and 4; ASR-9; ASR-11—Table 3-1 of report) and the critical programmatic replacement decision timeframes for each type of legacy radar. This analysis should be compared to the timelines of the MPAR risk-reduction R&D program schedule (Figure 6-2 and Appendix D of report), with the goal of optimizing the MPAR risk- reduction strategies with the critical programmatic replacement decision timeframes.” (MPAR WG TOR)

Radar Lifecycle Cost Data Collection Table 3-1 JAG PAR Report (2006) Radar System Design DateInstall. DateEstimated End-of-Life WSR-88D TDWR ARSR-1/ ARSR ARSR ASR ASR

Summary of FAA Programmatic Radar Decision Points ( ) SLEP decision on ASR-9 through 2025 (97) SLEP decision on ASR-8 through 2025 (98) Tech Refresh decision for ASR-11 through 2025 (99) 2011 Decision to implement NextGen primary radar systems, which include wx surveillance (77) TDWR SLEP segment #2 decision (60) Replacement decision for legacy primary radars (ASR-8/-9) (104) 2018 – Investment decision to SLEP NEXRAD or replace with NextGen wx surveillance capability (91)