15th of December 2012 IEE/09/702/SI2.558239, Project duration from 1/07/2010 to 31/10/2012 Expert-system for an INtelligent Supply of Thermal Energy in.

Slides:



Advertisements
Similar presentations
1 Intelligent Energy Europe 2009 European Commission, EACI Market Replication Eco-Innovation and Intelligent Energy Astrid Geiger, Head of Sector Energy.
Advertisements

You are a Smart Consumer USmartConsumer Contract number: 13/590/SI Project duration: 36 months (03/ /2017) Last modified: USmartConsumer.
EXPERT SYSTEM FOR AN INTELLIGENT SUPPLY OF THERMAL ENERGY IN INDUSTRY SAVE - Innovative approaches in Industry Duration: 09/2007 –
Getting European Research Funds Dr Philip Griffiths Associate Head of School, Built Environment Centre for Sustainable Technologies University of Ulster.
International Energy Agency Energy Conservation in Buildings and Community Systems Programme - ECBCS IEA Energy Conservation in Buildings & Community Systems.
Mr. Filippo MAZZARIOL Project Manager European Commission Enterprise and Industry GReening business through the Enterprise Europe Network Project Overview.
Green Energy Clusters Project supported by the ”Intelligent Energy – Europe” programme for the European Community Stimulation of regional RES HEAT markets.
Project duration: 36 monthsAugust 2009 Project supported by the „Intelligent Energy Europe“- Programme of the European Community
RES and RUE Stimulation in Mountainous – Agricultural in Mountainous – Agricultural Communities towards Communities towards Sustainable Development Contract:
Monika Schönerklee-Grasser JTS CENTRAL EUROPE PROGRAMME The CENTRAL EUROPE Programme Staccato is a project of the concerto initiative co-funded.
“Low cost ZERO WASTE Municipality” Under the MED programme, Objective 2.1: Protection and enhancement of natural resources and heritage 1 Project.
1 RENDEV Reinforcing provision of sustainable ENergy services in Bangladesh and Indonesia for Poverty alleviation and sustainable DEVelopment January 07.
GIS-based decision support system aimed at a sustainable energetic exploitation of biomass at regional level Contract number: IEE/07/638/SI Project.
Networks ∙ Services ∙ People John DYER TF-MSP Video Conference Community Procurement Support Building on the SPOT-ON Proposal Smart Procurement,
C-LIEGE Contract N°: IEE/10/154/SI Project duration: from 1 st June 2011 to 30 st November 2013 Date of creation: 4 th July 2011 Clean Last mile.
ENERGY EFFICIENCY IN INDUSTRY: TRENDS AND PROGRAMS IN AUSTRIA.
GREENFOODS - Towards Zero fossil CO 2 emission in the European food & beverage industry GREENFOODS Contract number:IEE/12/723.SI Project duration:28.
Leipziger Institut für Energie GmbH – Torgauer Str. 116 – Leipzig – Tel./Fax: 0341/ /-833 – Energy saving.
Renovation through quality supply chains and energy performance certification standards EU programme supported by Intelligent Energy Europe.
 For the implementation of the EPBD and the targets optimal design strategy is needed for energy efficient buildings by applying an integrated.
GET SUPPORT IN GREENING YOUR VEHICLE FLEET IEE Contract number: IEE/11/907/SI Project duration: 1/9/ /8/2015 Date of slides: June 2013.
Information Day on Irish International Education Strategy
OBJECTIVES The overall objective of this project is to build the private sector’s capacity in CDM project activities and related carbon trading concepts.
UNFCCC/UNDP Expert Meeting on Methodologies for Technology Needs Assessments Seoul April 2002 Holger Liptow Technology Needs.
SCORE project “Virtual community of the key stakeholders to assess and promote innovative technologies”
With the financial support of the European Commission Study ‘Impact on employment in the EU-25 of CO2 emission reduction strategies by 2030’ Construction-housing.
France-Finland Commission Activation of forest owners to increase forest fuel supply
ROAD TRANSPORT RESEARCH, TECHNOLOGICAL DEVELOPMENT AND INTEGRATION (2003 Call)
European Federation of Geologists Christian Boissavy, member of EFG Expert Panel on Geothermal Energy, France Herald Ligtenberg, EFG EU Delegate, the Netherlands.
Global Action Plan and its implementation in other regions Meeting for Discussion of the draft Plan for the Implementation of the Global Strategy to Improve.
Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG Barcelona May DISPOWER Distributed Generation with High Penetration of Renewable.
IEE/08/631/SI Project duration: 36 monthsAugust 2009 Project supported by the „Intelligent Energy Europe“- Programme of the European Community
FOsteRing Efficient long term Supply parTnerships FOREST IEE/09/656/SI June 2010 to December 2012 Version: June 2010.
Ingenious-science.eu ECB National Needs Analysis Workshop – Israel Charmaine Kerr ECB Project Coordination.
INSTITUTE OF PHYSICAL ENERGETICS Institute of Physical Energetics Director Dr.habil.phys. Juris Ekmanis Riga 2 June 2008.
IEEA Contractors Meeting December 4-5, 2006 Jan Erik Nielsen ESTIF Technical Consultant SolarKey Int. A large open EU market for solar thermal quality.
SPIRIT Energising Faith Communities Contract number: IEE/13/524/SI Project duration: 30 months Last modified:
Integrated Southern Africa Business Advisory (INSABA) Contract number: EIE/04/094/S Duration: 1 April March 2008 Supported by:
Directorate General for Energy and Transport REEEP Workshop Vienna, 6 April 2006 The European Regulatory Framework: Current and Future Policies Randall.
VIRTUAL INFORMATION AND KNOWLEDGE ENVIRONMENT FRAMEWORK IP-FP
MEM Lao PDR RESIREA Renewable Energy Sustainable Programs For Intelligent Rural Electrification and Poverty Alleviation General presentation Kick-off meeting.
Solar thermal applications in Eastern Europe with Guaranteed Solar Results Solar thermal applications in EASTern Europe with Guaranteed Solar Results EAST-GSR.
ENTRANZE Policies to enforce the Transition to nearly zero energy buildings in the EU-27 Contract number: IEE/11/922/SI Project.
Renovation through quality supply chains and energy performance certification standards REQUEST EU programme supported by Intelligent Energy Europe IEE/09/870/SI
Key facts „Planning for energy efficient cities“ PLEEC European Union Seventh Framework Programme Funded by 18 partners from 13 European countries 6 mid-sized.
2nd Transnational Workshop 11th December Thessaloniki 1.
1 European Commission Enterprise and Industry DG Entrepreneurship and Innovation Programme Management Committee, Brussels, 26 June 2008 Public Procurement.
Beispielbild Schools At University for Climate and Energy – SAUCE Project slides Contract no.: IEE/07/816-SI project duration: 01/09/2008 – 31/08/2011.
European Farmers and Foresters Involved for Contributing to an Intelligent Energy Network towards the target of 20% reduction.
Benchmarking tool for Quality Assurance in VET.
EIE065-EUBIONET II – 1 EUBIONET II EUBIONET II Efficient trading of biomass fuels and analysis of fuel supply chains and business models.
Contract Number: IEE/11/885/SI PInE Project Duration: from to – Date of creation: PI N E P ROMOTING I NDUSTRIAL.
Empowerment of practitioners to achieve energy savings in urban transport Empowerment of practitioners to achieve energy savings in urban transport IEE/10/274/SI ,
Training for Rebuilding Europe Retrofitting buildings, training and improved skills, and financing energy efficiency in buildings. 10 December 2010 – 10.
Funding: STEER – INTELLIGENT ENERGY EUROPE (IEE) Grant Agreement IEE/10/290/SI Full title: ECOSTARS Europe Acronym: ECOSTARS Project start date:
6 th December 2010 Contract N°: IEE/08/696/SI June May 2012 EPOMM-PLUS Partners Learning Urban Sustainability.
Deirdre Seery The Sexual Health Centre Cork, Ireland This work is part of the Joint Action on Improving Quality in HIV Prevention (Quality Action), which.
Contract N°: IEE/10/280/SI Duration: June, 1° 2011 – May, 31° 2014 Slides date: 31/05/14 Solar Thermal in major renovations and protected urban.
COST as a network instrument: Actions in Sustainable Construction and Energy Efficient Buildings S3 Platform on smart specialisation Workshop “Towards.
REACH FOR POLYMERS A €480, month project aiming to increase the knowledge base of the European polymer industry, particularly SMEs, when complying.
Background Data Centre (DC) energy consumption doubled between 2000 and 2005 and grew by 50% from 2005 to 2010, consuming 1.5% of global primary energy.
Werner Weiss AEE - Institute for Sustainable Technologies (AEE INTEC) A-8200 Gleisdorf, Feldgasse 19 AUSTRIA SOLTRAIN Targets and Results.
DONOR COORDINATION MEETING Pristina, 10 OCTOBER 2016.
Optimisation of Support Schemes for Renewable Energy Sources for Electricity Generation, Heating and Cooling Summary Slides Contract Number: EIE
European Plastics Converting Industry Voluntary Long-Term Agreement on Energy Efficiency EuPlastVoltage 29/03/2010 IEE/08/554/SI /05/2009.
ESSnet Projects Pascal JACQUES Unit/B5 Methodology and research
for sustainable urban mobility Contract Number: IEE/12/698/SI
EC2i - COSME Project Presentation.
SQUARE A System for Quality Assurance when Retrofitting Existing Buildings to Energy Efficient Buildings Project duration: Nov 2007 – April 2010 Project.
EGEC Webinar Wednesday 12th December 2018
Presentation transcript:

15th of December 2012 IEE/09/702/SI , Project duration from 1/07/2010 to 31/10/2012 Expert-system for an INtelligent Supply of Thermal Energy in INdustry and other large scale applications EINSTEIN II

15th of December 2012 IEE/09/702/SI , Project duration from 1/07/2010 to 31/10/2012 Project Summary Objective: integral energy-efficient solutions for thermal energy supply in industrial companies with large heat demand In large non-industrial users such as hospitals, office buildings Main activities: Further development and dissemination of the EINSTEIN thermal energy auditing tool-kit Basic and advanced training courses for energy auditors Implementation of auditing campaigns Standardization activities Countries: Austria, Bulgaria, France, Germany, Ireland, Italy, Luxemburg, UK, Slovakia, Spain

15th of December 2012 IEE/09/702/SI , Project duration from 1/07/2010 to 31/10/2012 Background Optimization of thermal energy supply:  Complexity of analysis of heat demand  Quantity and QUALITY (temperature level) to be known  Holistic approach required (all available concepts / technologies: process optimization, heat recovery, CHP, renewables, heat pumps)  Need for fast but high quality audit methodology

15th of December 2012 IEE/09/702/SI , Project duration from 1/07/2010 to 31/10/2012 Objective and main steps (I) Specific objectives: consolidate experience and EINSTEIN thermal energy audit tools from previous IEE project EINSTEIN extend to new countries and new target groups (buildings in the service sector) Strategic long-term objectives convert EINSTEIN into best-practice standard for thermal energy auditing establish an EINSTEIN community for maintenance and further development as free and open source project

15th of December 2012 IEE/09/702/SI , Project duration from 1/07/2010 to 31/10/2012 Objective and main steps (II) EINSTEIN II will: consolidate the EINSTEIN thermal energy audit methodology and improve the robustness of software tool (WP5) extend its application to non-industrial uses (buildings) realise an intensive training programme in 10 European countries (WP2) 72 audits in the 10 countries (WP3) contribute to standardisation activities ongoing in the CEN/CENELEC Committees on energy management and energy audit, and elaborate a draft for a CEN workshop agreement (WP4)

15th of December 2012 IEE/09/702/SI , Project duration from 1/07/2010 to 31/10/2012 Main results Consolidated EINSTEIN tool-kit V2.2 (software tool + audit guide) with extension to non- industrial users -> auditors trained in 10 countries, 107 auditors trained in advanced trainings 72 audit reports in industry and in the service sector. Average primary energy savings of 20% (about 40% of primary energy for thermal uses) CEN/CENELEC workshop agreement “Good Practice Thermal Energy Audits (GPTEA)”

15th of December 2012 IEE/09/702/SI , Project duration from 1/07/2010 to 31/10/2012 REPORTING DATA ACQUISITION (QUESTIONNAIRE) CONSISTENCY CHECK ENERGY STATISTICS BENCHMARKING PROCESS OPTIMISATION HEAT RECOVERY HEAT&COLD SUPPLY SYSTEMS ENERGY AND ENVIRONMENTAL PERFORMANCES ECONOMIC ANALYSIS ALTERNATIVES COMPARISON DATA ANALYSIS ALTERNATIVE PROPOSALS: DESIGN ALTERNATIVE PROPOSALS: EVALUATION REPORT DATA ACQUISITION AND CHECK EINSTEIN software tool

15th of December 2012 IEE/09/702/SI , Project duration from 1/07/2010 to 31/10/2012 Project Partners PartnerCountry energyXperts.NET (co-ordinator)Spain AEE – Institute for Sustainable Technologies (AEE INTEC)Austria Austrian Energy AgencyAustria Centre de Recherche (CRP) Public Henri TudorLuxemburg Cork Institute of Technology (Clean Technology Centre)Ireland Deutsches Institut für Normung e.V.Germany TecnoalimentiItaly ZukunftsAgentur BrandenburgGermany Chamber of Commerce DrômeFrance West Midlands in EuropeBelgium / UK Ruse University “Angel Kunchev”Bulgaria Chamber of Commerce and Industry MadridSpain Slovakian Cleaner Production CenterSlovakia

15th of December 2012 IEE/09/702/SI , Project duration from 1/07/2010 to 31/10/2012 Contact Hans Schweiger (co-ordinator) energyXperts.NET Barcelona / Berlin Tel: / EINSTEIN einstein.sourceforge.net