Positioning fork M. Ciappeti R. Vuillermet 29/09/20111.

Slides:



Advertisements
Similar presentations
Duct numbering for EE- Wolfgang Funk - CERN CMS 23/09/ B 06.A07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B12.A 13.B 13.A 14.B 14.A 1.
Advertisements

Clutch Fundamentals Chapter 69.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
IBL IST G&S Integration Ned Spencer, UCSC July 15, /15/11IBL IST G&S Integration1.
Corner Raft Conceptual Design Corner Raft Conceptual Design Kirk Arndt, Ian Shipsey Purdue University LSST Camera Workshop SLAC Sept , 2008.
1 IBL Stave & loading tools University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, P. Iacobucci, M. Weber The main goal for today…  Review.
Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
31 août 2011 Didier Laporte – LPNHE Paris 1 IBL Integration Stave Review Université de Genève.
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
SPACE FRAME Interface between the LGT and the IST 21/06/2011 Marco Ciapetti.
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
1 IBL Integration & Testing activities University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, M. Weber  Preliminary definition of Integration.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
WG3 Insertion/Extraction Testing Program R. Vuillermet 11/04/20111.
Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels1 PP0 & Service Panels 1.Introduction 2.Technical Status 3.Goals for 2002.
Hall D Integration Status GlueX Collaboration Meeting Indiana University, Ravi Anumagalla.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
November 04 Jason Tarrant CCLRC1 SCT EC Interconnects l Progress of SCT EC Interconnects »Services (Required for Disc Insertion 2004 / Integration 2005)
An Idea of Next Sci-ECAL Prototype for FNAL Beamtest Feb Sci-ECAL meeting S. Uozumi (Kobe)
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
UPDATE ON ID INTEGRATION Alice TB, E.Rosso ALICE TECHNICAL BOARD CERN, Ettore Rosso / CERN 1. 3 rd Cone 2. V0_L and Si_3 support 3.
IBL Mock up Mounting procedure V.2 François-Xavier Nuiry Simon Feigl
FEM/CFD thermo-mechanical analyses on IBL Mock-up A. Sciuccati.
D. Piccolo Barrel RPC Cable procurement, installation Davide Piccolo INFN Napoli.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
August 04 Jason Tarrant CCLRC1 SCE EC Design & Manufacture l Progress of SCT EC »Support Structure (Required for Disc Assembly 2004) »Services (Required.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
Estimated total mass of new Beam Pipe and IBL package Y. Gusakov 3/2/2010.
1 st LTEX meeting Protecting the experimental caverns and personnel from a "sector 34 like" incident: work planned in the LHC tunnel Prepared by M GASTAL.
IBL CO 2 cooling flexible transfer integration into IDEP 24 July 2013 Jan Godlewski, Bart Verlaat, Siegfried Wenig, Nicolas Massol, Tomasz Blaszczyk 1.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
1 David Santoyo sLHC OXFORD 17/06/2010 EC Structure Review ? ? ? ? ? ? IFIC-Valencia.
IBL Progress D. Ferrère for the IBL community LHCC Upgrade Session – June 14 th 2011 Detailed progress was reported at the IBL General meeting, June 8-10.
ESS DTL: Prototyping M.Comunian - F. Grespan – P. Mereu Lund– 10/04/2013F.Grespan.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
DCal-ALICE integration and installation plan and status A. Tauro.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
Central Tracker Cabling and Mechanics Paola Gianotti26/4/111.
Movable beam pipe and NNC Study & prototype development Manchester 14/12/20091D. FP meeting.
DBM status and path to the prototype D. Giugni / INFN Milano D. Giugni nSQP meeting
22/09/2011 ADO-PO section meeting ADO : Atlas Detector Operation PO : Project Office R. Vuillermet.
Baby-MIND Modules & Services
IBL project for DT Science-Techno Tea
"Drawer Mechanics - MiniDrawer"
Clutch Fundamentals.
Update of MVD services and requests
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
cooling and supports of the forward endcap EMC
IR Detector - Test cryostat : Machining
Endcap shielding senarios:
Mini-drawers, FE-ASIC , Integrator
LumiCal mechanical design, integration with LDC and laser alignment
IBL Wire Handling Concepts for Beampipe Support and Adjustment
Integration issues at IHEP
Status of upgrade works at Clermont-Ferrand
HPS Motherboard Electronic Design
New Design for Beam Test Structure
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
BRAN: LS2-plans TREX M. Palm, E. Bravin, BE-BI-PM.
Presentation transcript:

Positioning fork M. Ciappeti R. Vuillermet 29/09/20111

Cooling pipes HV, LV, DCS Signal, clock PP0 Cooling pipe bushing Flex connectors PP1 Cooling pipe Fitting Cables connectors Cables and cooling pipe sliding / ring Side AIP Beam Pipe supports same interface as current beam pipe Sealing ring with soft interface Pulling cables for insertion/extraction of the IBL Package inside IST ID end Plate IBL package kinematic scheme with services 2 PP0 board support Z-stopper mechanism

Beam pipe + IST See next slide Side A Side C 29/09/20113

Beam pipe detail Side A Side C I.P. See next slide Positioning fork 29/09/20114

Positioning fork + pin + IST Side A Side C Positioning fork IST pin IST 29/09/20115

Positioning fork + pin Side A Side C Positioning fork IST pin 29/09/20116

Positioning fork Side A Side C Positioning fork 29/09/20117

Positioning fork Side ASide C See next slide 29/09/20118

Positioning fork Side ASide C 29/09/20119

Positioning fork 29/09/201110

Purpose of the Z stopper Function of the Z stropper – Position along Z the IBL package respect to the IST – Guaranty that once engaged, the package can not extract – But is shall allow disengagement for the extraction process – Orientate angularly the package Constrain in the design – Limited space to position this Z stopper – Made out of material with low X/Xo Can withstand activation of the area With high enough elasticity 29/09/201111

IBL package characteristics IBL package weight : – about 20kg (to be re-evaluated) Friction coefficient between IBL package and IST : – to be measured (this operation can be done at cern as we have IST with some peek interfaces 29/09/201112

Work to be done Step 1 – Fabricate a prototype out of a titanium plate (1.5mm) – Fabricate a test bench to measure insertion/extraction force – Test : Measure the insertion/extraction force Evaluate if the extraction with cables are helpful – Loop on the design to modify geometrical parameters Step 2 – Fabricate a second prototype out of a titanium plate – Test : Measure the insertion/extraction force – Loop on the design to modify geometrical parameters Step n – Make a prototype out of a titanium block – Test : Measure the insertion/extraction force Validate the design Install this block on the integration mock-up at CERN – Validate integration – Validate the positioning precision – Validate the insertion/extraction force 29/09/201113