JEETENDRA DAHAL MANAGER TECHNICAL SERVICES CITY OF PALMERSTON RISK BASED INFRASTRUCTURE INSPECTION SYSTEM.

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

Barhale Procedure for Site Establishment
OHS Induction Training
Work Health Safety Regulations Regulations Module: Workplace WHS requirements Workbook page 8.
2 3 There are two basic areas where there is a need to have resources available. Internal:  Financial  Personnel  Assets  Time External  Consultants.
Cope: 343 Occupational Health and Safety Training — Level 1 Workplace Inspections Version 5.
Policy & Procedures Manuals for Supportive Housing Anne Cory Corporation for Supportive Housing MHSA Operations TA Call 2/2/11
Status Quo Assessment of Wastewater Ponding Systems.
DOE OFFICE OF INDIAN ENERGY Step 4: Project Implementation 1.
Contractor Safety Management
OHS Worksite Inspections February Health & Safety Systems > The goal of any health & safety system is to eliminate or reduce as far as is practicable.
CHCAC1C Provide support to the older person Chapter 4: Responding to risk.
BRC Storage & Distribution Safety and Quality Management System Training Guide
3 May 2013 Presented By: Joanna Oborne Councils Powers and Obligations with respect to Driveways.
The Australian/New Zealand Standard on Risk Management
This document remains the intellectual property of Arrow Accounting and may not be copied, or used without their prior written approval Use of any material.
Workshop Summary ISPS Drills & Exercises Workshop Port Moresby 2006.
All rights reserved. Copyright Geomatic Technologies 2012 Presenter Name Presenter Contact GT’s PowerPoint Template Option 1 Presentation Subtitle.
Copyright © 2011 Resource RTO 1 Copyright © 2011 Resources RTO 1 When things go wrong! What are the issues buried within the training systems?
BRC Food Safety Quality Management System Training Guide
Hazard Identification
High Potential Incident Intervention. Background 2 The principle policy of Downer Blasting Services regarding to our staff is “Zero Harm” The success.
VETiS Moderation meetings – November 2012 Welcome to the Australian Institute of Education and Training.
YACHTING AUSTRALIA Club Risk Management Template A Practical Resource for Clubs and Centres.
Corporate Support Richard Brown, Business Director.
Contractor Management
Environmental Health and Safety (EH&S) Supplier Awareness Training ISR Systems Danbury, CT 2011.
Physical Building Audit Physical Building Audit By; Engr.Dr.Attaullah Shah PhD ( Civil) Engg, MSc Engg ( Strs), BSc Engg ( Gold Medalist),), MBA, MA (
Presented by: Meg Boyd The Blue Mountains Drinking Water System: DWQMS Overview.
Managing Council’s Road Network for Better Outcomes Storm Damage Experience Ian de Bruyne Manager Program Planning & Delivery IPWEA Regional Forum 15 May.
Cape Town: A city ready to host the 2010 FIFA World Cup™ 2010 FWC Event – Overview of City’s Disaster Risk Management Preparations 24 February 2010.
1 Fire Planning Prevention and Preparedness 27 November 2013.
Preventing Slips & Trips at Work
Worker Focused Safety Program Violence in the Workplace Worker Training Module 5.
School Finances for Finance Subcommittees School Councils.
Proposed Modifications to the Gated Community Ordinance Board of County Commissioners April 8, 2008.
Modernising Pharmacy Regulation An inspector calls: A new regulatory model in pharmacy Deborah Hylands Inspector, GPhC 19th February 2014.
A procedure for controlling risks 1 st step – to eliminate and identify hazards 2 nd step – to rank the risk associated with the hazards 3 rd step – to.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
WSSB Capacity Enhancement Workshops The Uganda Performance Contract & Purpose 2. Performance Key Elements 3. Water Board’s Rights & Obligations.
Darwin City Council’s Asset Management Journey, Learning & Future Directions LUCCIO.
1 ROADS Services Training Group LOCAL AUTHORITY ROADS CONFERENCE 2014 Reforms, Challenges and Safety Treacys West County Hotel, Ennis, May 2014.
Water Resource Management Company (WRM) Ministry of Energy Iranian Approach to Dam Safety - Practice - Achievements - Future plans.
A Plan for Transformation: Integrity Process Mark A. Bartkoski, P.E. 143 rd SME Meeting & Exhibit February 26, 2014 Salt Lake City, Utah.
Conservation Planning Friday 9 March Introductions Find out about the person next to you: their name reasons for attending the workshop place of.
Financial Management and Budgeting The Details. What Is a Budget? A useful tool for keeping track of funds. A useful tool for keeping track of funds.
Highway Reactive Maintenance Darren Coffin-Smith May 2014.
ESSENTIAL MANAGEMENT PACKAGE For Physical Rehabilitation Centers Kate Wilson, Technical Advisor, LMG November, 2014.
Systems mitigate risks Risks not eliminated Public Works: Prepared Annual valve testing Ongoing dam infrastructure improvement program.
Town of Oro Valley Oro Valley Stormwater Utility Commission Overview.
SUPPORTING PEOPLE PROVIDER FORUMS An overview of Supporting People’s new approach to Performance Monitoring and Quality Assurance.
Rarotonga 29 th January, What is an EMP? An EMP sets out how a business will undertake its operation to manage pollution risks. EMPs deal with pollution.
Engineering Environment Awareness
THEME: EMPOWERING FACILITY MANAGEMENT AND HEALTHCARE TECHNOLOGY IN KENYA TOPIC:MEDICAL EQUIPMENT MANAGEMENT DATE’13/11/2013 BY MILLICENT ALOOH.
Review of Observation Policy What triggered the review? 4 in-patients deaths where observation was a factor. Methodology Reviewed SUI reports and disciplinary.
20 Principles for Managing Behavioural Safety & Process Safety
Maintaining Safety Standards
Maintaining Safety Standards
Safety Accountabilities
Risk management - HIRAC awareness presentation
Bloxham Parish Council Internal Audit Final Report
Community buildings in a changing landscape
Safety plan.
OHS–Occupational Health & Safety
Hornton Parish Council Internal Audit Final Report
How to conduct Effective Stage-1 Audit
SIS20512 Certificate II in Sport Coaching
Parker domnick hunter. Safety of Electrical and
CEng progression through the IOM3
Presentation transcript:

JEETENDRA DAHAL MANAGER TECHNICAL SERVICES CITY OF PALMERSTON RISK BASED INFRASTRUCTURE INSPECTION SYSTEM

Purpose  To inspect and identify the risks associated with roads, pathways and stormwater drainage infrastructure in order for Council to  Minimise the potential insurance liabilities  Achieve better outcomes on community safety

Assessment of risks  For roads: Based on size of failure/defects and hierarchy of road  For pathways: Based on size of the trip hazard, slipperiness and unevenness  For stormwater drainage: Based on the potential risk and the location of the asset

Inspection methodology  Inspection team  1 inspector, 1 assistant  Inspection procedure  Roads- observations from car  Pathways- carried out on foot  Stormwater drainage- within road reserves from car and within public open space on foot

System procedure  Program for inspection  Collect inspection data including the coordinates of asset locations, and photos  Enter data in the records system & develop a program for maintenance works  Prioritise & arrange urgent responses to make conditions safe  Undertake repair works  Maintain a register of repair works  Have regard to budget and resources constraints

Response  Required actions are taken under 3 categories:  Category 1 (Requires immediate response to make the site safe)  Category 2 (Requires monitoring)  Category 3 (No action)

Coronial Inquest  Issue : An 8 year old boy entered into a fully flowing pipe during a storm event resulting in a drowning death  Coroner’s statement” there should be a system of risk management and risk avoidance”

Council’s resolution  A register of all secured drains be established and maintained  All drains on the register be inspected specifically and regularly not less than twice a year (including once during the wet season)  The results of each such inspections be recorded  Any maintenance and repairs undertaken be recorded

Coroner's response and final recommendation  Response: “It is extremely pleasing to see Council taking such a proactive approach…”  Recommendation: undertake inspections prior to, during and after wet season

Thank you