Yellowtail Dam & Bighorn Lake 2010 Operation Review Billings, MT January 2011 RECLAMATION Managing Water in the West.

Slides:



Advertisements
Similar presentations
Aspinall Unit Reservoir Operations CRFS Meeting November 16, 2010.
Advertisements

Yellowtail Dam & Bighorn Lake Billings, Montana October 18, 2007 RECLAMATION Managing Water in the West.
US Army Corps of Engineers BUILDING STRONG ® Mid-West Electric Consumers Association September 16, 2014 Corps of Engineers US Army Missouri River Mainstem.
Yellowtail Dam & Bighorn Lake Water Supply & Operations Meeting Billings, Montana October 8, 2009 RECLAMATION Managing Water in the West.
US Army Corps of Engineers BUILDING STRONG ® Skiatook Lake Drought Issues and Management.
Hydrology and Hydraulics. Reservoir Configuration.
Chubaka Producciones Presenta :.
IDWR Water Supply Meeting May 12, 2011 NRCS Snow Survey Measuring Lost Lake SNOTEL Site, elevation 6,110 feet, along the NF Clearwater and St Joe Divide.
2007 Water Supply Summary Idaho Department of Water Resources.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Modeling the Boise Reservoir System with Climate Change Leslie Stillwater, Pacific NW Region.
Long Term Streamflow Forecast Validation Western Washington Watersheds Water Year 2004 If only we’d seen this one coming... Pascal Storck 3TIER Environmental.
Hemlock Butte SNOTEL March 2008 Clearwater Basin 2008 Forecasts: Over, Under and Right On, and Amount of Snow Needed in 2009 for Adequate Surface Irrigation.
Idaho's Climate and Water Resource Forecast for the 2008 Water Year Sponsored by: The Climatic Impacts Group at the University of Washington and the.
Yellowtail Dam & Bighorn Lake Potential Revisions to Draft Criteria Based on Comments and Operating Experience Billings, MT October 13, 2011 RECLAMATION.
Yakima Basin Total Water Supply Available March 2005 Presented by: Quentin Kreuter River Operator Chris Lynch Civil Engineer, PE Kate Puckett River Ops.
Yellowtail Dam & Bighorn Lake Billings, Montana January 2011 RECLAMATION Managing Water in the West.
Yellowstone River Compact Commission Technical Committee Discussions Sheridan County Courthouse Sheridan, WY April 24, 2007 Bighorn Reservoir operations.
2011 Peak Flows and Daily Forecasts CBRFC 2011 Stakeholder Forum November 3, 2011.
CRFS Technical Committee Spring Meeting LC Operations Update March 26, 2015.
CRFS Technical Committee Fall Meeting LC Operations Update November 20, 2014.
CRFS Technical Meeting LC Operations Update November 8, 2011.
Southwest Hydrometeorology Symposium Tempe, AZ September 28, 2011 Kevin Werner NWS Colorado Basin River Forecast Center : A Year of Extremes.
Yellowtail Dam & Bighorn Lake Operating Criteria Review Billings, MT September, 2010 RECLAMATION Managing Water in the West.
44 th Annual Mid-Pacific Region 2011 Water Users Conference Water Supply Outlook Reno, Nevada January 26-28, 2011.
Boise River Accounting Liz Cresto February 26, 2013.
Yellowtail Dam & Bighorn Lake Climate Change Billings, MT September, 2010 RECLAMATION Managing Water in the West.
US Army Corps of Engineers BUILDING STRONG ® Omaha Districts Inflow Forecast Regression Analysis Carrie Vuyovich and Steven Daly ERDC-CRREL Cold Regions.
Cowichan Lake Storage Assessment – 2015 Final Results Craig Sutherland, M.Sc., P.Eng. July 27, 2015.
Missouri River Basin Forecast Brian Anderson Wyoming Area Office Meeting, January 20, 2010.
Idaho Water Supply Outlook IDWR State Water Supply Meeting Jan 12, 2012 Current Conditions & New Normals Maybe new normals also means new peaks and new.
NE Drought Conditions CARC Update: April 2010 Mark Svoboda and Brian Fuchs National Drought Mitigation Center University of Nebraska-Lincoln Al Dutcher,
NE Drought Conditions CARC Update: April 2011 Mark Svoboda and Brian Fuchs National Drought Mitigation Center University of Nebraska-Lincoln.
Water Year 2012: Review of Water Supply Forecasts in the Colorado River Basin CRFS November 14, 2012.
Modeling Development CRFS—Technical Meeting November 14, 2012.
Boysen/Buffalo Bill Reservoir Operations John H. Lawson Area Manager Wyoming Area Office April 24, 2007.
USBR Updates: Green River CRFS Meeting March 27, 2014.
Yellowtail Dam Modeling Results Brian Marotz Hydropower Mitigation Coordinator.
Yellowtail Dam & Bighorn Lake Water Supply & Operations Meeting Billings, Montana October 9, 2008 RECLAMATION Managing Water in the West.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
CRFS Technical Meeting LC Operations Update March 29, 2011.
CRFS Technical Meeting LC Operations Update March 30, 2010.
Water Year 2009 Forecast Review: Green River Basin CRFS November 19, 2009.
CRFS November 20, Green River Basin Upper Green  Near record February precipitation  Large increases in forecasts on March 1  Much above average.
USACE Managing a Drought  Overview  Timeline  Depletion Scenario Current Status– 17 Oct 07.
Martin Rule Curve Study Ashley McVicar, APC Maurice James, Water Resources Consulting LLC.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
International Osoyoos Lake Board of Control International Osoyoos Lake Board of Control Public Meeting Osoyoos Lake Water Science Forum October 8, 2015.
Colorado River Basin: Overview of Determining Lake Powell and Lake Mead Annual Operational Tiers WSWC Seasonal Precipitation Forecast Workshop December.
2 009 W ater S upply F orecasting William B. Reed Senior Hydrologist Colorado Basin RFC September 18, W ater S eminar “Dust in the Wind and.
Model Overview Application of CALSIM II to Friant System.
US Army Corps of Engineers BUILDING STRONG ® Corps of Engineers Omaha District Forecast Update Brian Twombly Kellie Bergman January 2010 Jay Lincoln.
Lake Powell Operations CRFS Spring 2015 March 25, 2015.
Yellowtail Dam & Bighorn Lake Reservoir Operating Criteria Proposed Modifications Lovell, Wyoming July 29, 2008 RECLAMATION Managing Water in the West.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
CRFS Technical Committee Fall Meeting LC Operations Update December 8, 2015.
Reclamation and Hoover Dam It’s All About The Water.
CRFS Technical Meeting LC Operations Update November 14, 2012.
CRFS Technical Meeting LC Operations Update March 27, 2014.
CRFS Technical Committee Spring Meeting LC Operations Update March 15, 2016.
Kootenai Basin Spring/Summer Operations for 2016
Albeni Falls Dam Operations
Constructing Climate Graphs
Trends in Runoff and Soil Moisture in the Western U.S
McDonald’s calendar 2007.
Hydrologic Changes in the Western U.S. from
Kootenai Basin Spring/SummerOperations for 2016
McDonald’s calendar 2007.
2015 January February March April May June July August September
Presentation transcript:

Yellowtail Dam & Bighorn Lake 2010 Operation Review Billings, MT January 2011 RECLAMATION Managing Water in the West

2010 Bighorn Lake Operations Using the Draft Criteria “A Yo Yo Year”

November – March Period Nov-Mar parameters used for calculating release rate April-Oct. gain = 265,000 AF End of Oct. storage =1,064,000 AF (Elev ) Boysen planned release =900 CFS Buffalo Bill planned release =360 CFS Based on above Nov-Mar Release set at 2750 cfs

Bighorn River Release Rate NOVEMBER - MARCH ABCDEFGHI ENTERCALCULATEDENTER InitialCALCULTEDCALCULATEDTARGET ELEV Bighorn Lake Nov-MarBighorn LakeBuffalo BillBoysen Res31-Mar Release toRiver Release31-Mar Apr-Oct GainForecasted GainOct. 31 StoragePlanned Nov-Mar Stor TargetAfterbayFrom AfterbayReservoir acre-feet Release Avg cfs acre-feetcfs Target Elevation 265,000247,3391,064, , Sample Data Water Year -183, , , , ,341 1,060, ,425 1,063, DIRECTIONS: Enter appropriate data under A, C, D, and E (Yellow Cells A10, C10, D10 and E10). RIVER RELEASE: The release to the river for November - March. is calculated under H (cell H10) TARGET ELEVATION: The March 31 taget elevation is shown under I (cell I10)

Forecasted Nov. – Mar. Inflow acre-feet Forecasted Actual Forecast % of Actual , ,500 97% , ,500 97% , , %

February– March Period “Down It Goes” February 1 Apr-Jul Forecast 634,200 AF57% March 1 Apr-July Forecast591,000 AF53% Minimum Forecast for Rule curve719,000 AF64% Under minimum rule curve a release of 2,000 cfs is needed

Apr-July Rule Curve Analysis “Up She Goes” Apr 1 April-July Inflow Forecast 625,000 AF 56% Apr 15 April-July Inflow Forecast 730,000 AF 65% Based on the April 15 Forecast being greater than 719,000 AF a rule curve was prepared

Spring Runoff Forecasts April-July Inflow % of DateForecast (ac-ft)Average Feb ,000 57% Mar ,000 53% Apr ,000 56% Apr ,000 65% May 1 900,400 81% May 151,121,400101% June 11,263,300113% Actual1,504,354135%

August-October Period “and Down Again” Inflows dropped sharply during the 2 nd haft of July and continued to drop and remain low through the end of October. Since most of the snow occurred in the spring it melted rapidly reducing snowpack to supply late summer flows. August –October were unusually dry and warm reducing runoff and increasing irrigation depletions. August –October gains to Bighorn Lake were -53,000 AF compared to an average of 35,800 AF, 88,800 AF less than average.

August-October Gains Actual 2010 Aug-Oct Gains = -53,000 AF Average Aug-Oct Gains = 35,800 AF Difference = 88,800 AF In CFS this difference is 490 CFS Lowest Gains of Record

November – March 2011 Nov-Mar Parameters used for calculating Release Rate April-Oct. Gain = 201,000 AF265,000 AF End of Oct. Storage = 938,000 AF 1,064,000 AF Boysen Planned Release 800 CFS 900 CFS Buffalo Bill Planned Release 355 CFS 360 CFS Nov-Mar Release2,370 CFS 2,750 CFS

QUESTIONS & COMMENTS

March 31 Target Elevation Target elevation determined on November 1 prior to accumulation of snowpack in the mountains. Target elevation is set at a level that will handle both high and low spring runoff Reservoir level is adjusted by March 31 based on forecasts to deal with expected runoff. Reservoir allowed to gradually fill with average to below average forecasts and to be further drafted with above average forecasts

Target Elev Compared to 3610 Lake ElevationStorage af ,600 af ,200 af Diff ,400 af ,140,399 af ,070,029 af Diff ,370 af

QUESTIONS

PEAK BIGHORN RIVER DISCHARGE YearActual PeakEst. With Rule Curve ,000 CFS12,000 CFS ,000 CFS12,000 CFS ,000 CFS12,000 CFS ,500 CFS11,000 CFS

PEAK BIGHORN LAKE ELEVATION YearActual Est. With Peak Rule CurveDifference

PROPOSED RESERVOIR TARGETS Date Existing Proposed Difference _______ Targets Targets (feet) Oct ft Nov Eliminated+5-7 ft Mar ft July Same

Nov.-Mar. Operations Bighorn River release rate cfs River discharge 275 cfs above 2500 cfs March 31 Bighorn Lake target level – feet Current Lake Level – 36??

2010 Forecasted Rule Curve

QUESTIONS & COMMENTS