Montana’s Statewide Montana’s 511 Traveler Information System T3 Webinar January 9, 2008.

Slides:



Advertisements
Similar presentations
Emergency Response via the Web Two emergencies in August 2007 highlight the Internet as a dynamic communication tool.
Advertisements

Kansas City 511 Kansas City ITS Symposium May 6, 2009 Presented by: Barb Blue, ATIS/511 Program Manager Kansas Department of Transportation (KDOT)
Tuesdays at APA–DC 13 th May 2014 The Community Streets Program in Hounslow, London: A Community-Led Approach to Street Design Gareth James Community Engagement.
Clarus Initiative: Overview and Progress James Pol, PE, PMP USDOT ITS Joint Program Office MDSS Stakeholder Meeting #7 October 2005.
November, 2008 Montana Department of Transportation Transportation Management Plans.
North Carolina’s Integration of 511 and Workzone Information Jo Ann Oerter State Technology Implementation and Maintenance Engineer North Carolina Department.
Caltrans IRIS – T3 Webinar T3 Webinars are brought to you by the ITS Professional Capacity Building Program (ITS PCB) at the U.S. Department of Transportation’s.
Integrating Surface Transportation Weather Information Systems - The DOT Role Transportation Research Board 85th Annual Meeting Session 494: SAFETEA-LU.
March 2009 Permitting Over Sized Loads In Texas Ray Hutchinson Motor Carrier Division, TxDOT.
Optimal Highway Durability in Cold Regions Jia Yan Washington State University 18 June 2015.
Lawrence Regional ITS Architecture Update. Today’s Agenda What is ITS? Review 2007 ITS Plans Review the proposed work plan Define project goals and objectives.
Florida Department of Transportation District 4 TSM&O Program Advanced Transportation Management System (ATMS) Installation in South Broward County ATMS.
Ohio Department of Transportation Marian Thompson Freeway Operations Engineer September 20, 2005 Current / Future Direction of ITS Programs.
Michigan VII: Technology Improving Lives ITS Midwest Annual Meeting February 7, 2006 Gregory D. Krueger, P.E. Statewide ITS Program Manager Michigan Department.
State Maintenance Office Using Customer Feedback to Manage Performance Florida’s Customer Comment Card System Florida Department of Transportation October.
The Dutchess County Fair Traffic Plan Talking Operations Web Seminar April 26, 2006.
An Intelligent Transportation System Evaluation Tool in the FSUTMS Regional Demand Modeling Environment By Mohammed Hadi, Florida International University.
1 511 Services “Hit the Road” Kentucky Florida Nebraska Utah San Francisco Iowa.
1 Dixie ITS Architecture Study Section ? Utah ITS History.
Arizona 511 Model Deployment Matt Burt – Battelle Talking Operations Webcast Rural Issues: 511 and Traveler Information July 27, 2005.
Fast Forward Full Speed Ahead Presented at the Joint ITS Georgia / Tennessee Annual Meeting September 25, 2006 by Carla W. Holmes, P.E., PTOE Georgia Department.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
Active Traffic Management: The Next Step in Congestion Management NTOC Webinar Presented by Jessie Yung, P.E. Office of Transportation Management April.
1 Road Weather Management Performance Metrics Development: An Update Chris Cluett, Leon Osborne, Arthur Handman, Jeff Jenq ITS America 2007 Annual Meeting.
Project Monitoring and Evaluation in the GMS 7-18 May 2012, Mekong Institute, Khon Kaen Project Monitoring and Evaluation for Road Construction in Lao.
Outline Project Background ITS Architecture Overview GVMC ITS Architecture Deployment Plan.
Introduction ► Brian Saville ► RoadStats, LLC ► GCM Travel Stats Web Site  Developed With IDOT ITS ► Scott Lee, David Zavattero ► Started Work March 2004.
Overview of Advanced Traveler Information Systems Evaluations Joseph I. Peters, Ph.D. Manager, ITS Program Assessment U.S. Department of Transportation.
1 Clarus: The National Surface Transportation Weather Observing and Forecasting System Roemer M. Alfelor FHWA Office of Transportation Operations Washington.
V ehicle I nfrastructure I ntegration Jeffrey F. Paniati Associate Administrator for Operations and Acting Program Manager for ITS Joint Program Office.
Department of Human Services Office of Information Services Statewide IT Performance Measures Pilot Project DHS Initial Measures & Next Steps Presentation.
Some things can’t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
Enhanced 511: Beyond the Basics Jerry Woods Florida DOT – District 5 iFlorida - Automated Message Generation Based on Travel Times.
California Department of Transportation Transportation Management Systems (TMS) and their role in addressing congestion Discussion Materials Lake Arrowhead.
June 5, Georgia Travel Info Brought to you by.
1 Overview of Wireless Service Levels in California Michael Aguilar Regulatory Analyst Policy Analysis Branch Communications Division California.
Ohio Department of Transportation Steering Committee Meeting #3 Steering Committee Meeting #1May 30, 2012 Steering Committee Meeting #1 WELCOME Steering.
1 NTOC Talking Operations – Road Weather Management – September 30, 2008 MDSS Update Ray Murphy, ITS Specialist FHWA/Resource Center, Chicago, IL.
U.S. Department of Agriculture eGovernment Program eGovernment Working Group Meeting February 11, 2004.
September 25, 2013 Greg Davis FHWA Office of Safety Research, Development and Test Overview of V2I Safety Applications.
Weather-Responsive Transportation Management Weather-Responsive Transportation Management ROEMER ALFELOR Federal Highway Administration NTOC Webcast March.
Adverse Weather Preparedness and Managing Expectations King County Department of Transportation Metro Transit Division November 1, 2010.
BELMONT TRANSPORT PACKAGE A49 – B4349 (Relief Road Southern Section) Meeting 14 June 2013.
Regional Concept of Transportation Operations: The Hampton Roads Experience Presented by: Camelia Ravanbakht, PhD Talking Technology & Transportation (T3)
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Lina Williams Budget & Financial Analyst Tuesday, July 28 th 2015.
Michigan VII: Technology Improving Lives Safety Summit Lansing, MI February 28, 2006 Gregory D. Krueger ITS Program Manager Michigan Department of Transportation.
Approaches for Integrating Systems Engineering into Your Agency's Business Practices. Talking Technology and Transportation (T3) Webinar August 2, 2007.
1 Development and Implementation of a Statewide Pilot Project for Standardized TIM Performance Measurement and Reporting— Nevada Department of Transportation.
1 RESPONDER SYSTEM Mandy Chu Project Manager Division of Research & Innovation /
1 Florida Department of Transportation ITS Performance Measures Breakout Session 2 – Elizabeth Birriel, P.E.
Regional Concept for Transportation Operations: An action plan to address transportation operations in Southeast Michigan Talking Technology & Transportation.
His Story Board Monthly Theme-Focused Activities Choose Truth
The CEOS MIM Database & EO Handbook 2013 G Dyke & S Ward (ESA MIM team) I Petiteville (ESA) 27 th CEOS Plenary Montreal, 5-6 Nov 2013.
1 expect the best Lemuel C. Stewart, Jr. CIO of the Commonwealth Information Technology Investment Board February 9, 2006 CIO Status.
Work Zone Operational Enhancements Jennifer Livingston, P.E. ADOT – Senior Project Manager.
1 Clarus Clarus Nationwide Surface Transportation Weather Observing & Forecasting System Paul Pisano Team Leader Road Weather Management Office of Transportation.
FDOT Annual ITS Working Group Meeting ITS Updates.
1 U.S. Department of Transportation ITS Joint Program Office CASE STUDY #3 INTEGRATING THIRD PARTY CROWDSOURCED DATA Elizabeth Birriel, Florida DOT.
Real-Time Information and Response Jon Nelson, P.E. MoDOT.
Kansas 511 Traveler Information System T3 Webinar January 9, 2008.
USDOT ITS and Operations Training Grant Zammit Operations Technical Service Team Manager Office of Technical Services – Resource Center
Arterial Travel Times Using Bluetooth Detection Presented by Amit Sidhaye, P.E., PTOE Project Manager SIGNAL SYSTEMS & ITS ARLINGTON COUNTY May 16, 2013.
Redmond Police Functional Plan Update Council Study Session January 14, 2014.
PART 1 UNIFORM CRIME REPORT
Overview of Advanced Traveler Information Systems Evaluations
2040 Long Range Transportation Plan Update
What is TSMO? TSMO encompasses a broad set of strategies that aim to optimize the safe, efficient, and reliable use of existing and planned transportation.
Change of Supplier Data Provision to Ofgem
What is TSMO? TSMO encompasses a broad set of strategies that aim to optimize the safe, efficient, and reliable use of existing and planned transportation.
Regional Operations Forum Road Weather Management
Presentation transcript:

Montana’s Statewide Montana’s 511 Traveler Information System T3 Webinar January 9, 2008

2 Overview   Montana’s Traveler Information System   511 in Montana   Benefits   Partnerships   Usage/User Satisfaction   Lessons Learned   Future Enhancements

3 Traveler Information in Montana

4 Montana’s 511 System   Deployed January 8, 2003   9 th Statewide system   13 th overall system   When deployed – largest geographical area with smallest population Photo courtesy of AHMCT

5 Montana’s 511 System   System Content – –Winter road conditions – –Construction project information – –Road closures / major delays / chain requirements – –Route specific weather forecast – –Glacier National Park Information – –Alert capability – –Comment line

6 Montana’s 511 System, cont’d   Choosing Meridian – –Existing database – –Integrated forecast – –Cost benefit from shared infrastructure   How is the information gathered?   How often is the information updated?

7 Who Benefits From Deploying 511 in Montana?   MDT   Traveling public   Other agencies

8 511 Partnerships/Potential   Glacier National Park   Department of Justice   National Weather Service   Yellowstone National Park   Travel Montana   Montana Highway Patrol

9 Statistics   Increase in call volumes more than threefold   Peak months are November through March   More than 1.5 million calls to date   System has accommodated more than 35,000 calls a day with no busy signals or disconnects

Awareness   WTI’s Customer Survey – March 2003 – –58% heard of 511 – –29% used 511 – –12% of those aware found out thru TAP   MDT’s Customer Survey – October 2004 – –51.1% heard of 511 – –46.8% heard of 511 and had used it

11 Customer Feedback   Comment Line   National Progress Report   Continued Education and Public Awareness   Identify system flaws or weaknesses and improve

12 Lessons Learned   Detailed contract   Create system requirements   Mileposts vs. landmark reference   Put a timestamp on 511 information   Create a test plan

13 Future Enhancements   511 – –Inclusion of all secondary routes – –Yellowstone National Park – –Tourism Information – –Transit   TMC – –Microwave   AVL

14 Any Questions?

15 Contact Information Brandi Hamilton Traveler Information Program Manager Maintenance Division (406)