Heavy Construction Association March 20, 2013 Robert Sharon, Director of Community Services Kit Woods, P. Eng., Manager of Environmental Services Allan.

Slides:



Advertisements
Similar presentations
Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.
Advertisements

Capital Improvement Program City of Snoqualmie Public Works Department.
Bryan Station Middle – Renovation Architect: Clotfelter-Samokar Architects General Contractor: Preston Construction Group Substantial Completion Date:August,
District 2 System Preservation Projects for FY 15 and FY 16 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
City of Clinton Fiscal Year 2013 Sewer Rate Recommendations Committee of the Whole April 24, 2012.
2009 Wyoming Street and Utility Improvements Neighborhood Informational Meeting December 18, :00 P.M. – 8:00 P.M. 6:00 P.M. – 8:00 P.M. Mark A. Erichson,
Greeley and Hansen Agenda New Rules For Sanitary Sewer Systems EPA Enforcement Overflow from a Manhole on to the Ground – into a stream, into a basement.
1 Chatham-Kent Windsor Heavy Construction Association Capital Works Budget Presentation Wednesday, March 23, 2012 Current tender opportunities can be reviewed.
City and County of Denver 2015 Capital Projects - Wastewater
MARCH 2015MARCH HIGHLIGHTS OF 2015 CAPITAL BUDGET Roads, Sewers, Transportation, Parks, Miscellaneous, Special Projects.
2014 STREET & UTILITY IMPROVEMENT PROJECT CITY COUNCIL MEETING November 18, 2013.
Arterial Street Rehabilitation for Riverside Drive 24 th Street to 35 th Street Public Informational Meeting July 22, 2014.
6 th Street Water Main And Street Reconstruction 2013.
DISTRICT 7 CONSTRUCTION PROGRAM Frederick Carroll Howard.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
Facilities & Campus Planning North Pleasant Street Improvement Plan Faculty Senate – February 28, 2008.
Public Works Technical Services Working Together to Make a Difference 2012 Construction Projects.
S.R. 3 / South State Street Added Auxiliary Lanes Project in North Vernon Wednesday, June 29, :30pm Presentation Jennings County High School.
District 2 System Preservation Projects for FY 14 and FY 15 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
1 Chatham-Kent Windsor Heavy Construction Association Capital Works Budget Presentation Wednesday, March 20, 2013 Current tender opportunities can be reviewed.
Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010.
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
SEA LEVEL RISE IN MIAMI BEACH MIAMIBEACH. Seawall Construction.
SEA LEVEL RISE IN MIAMI BEACH MIAMIBEACH. Seawall Construction.
The Corporation of the Town of Amherstburg Public Works Department March 21, CAPITAL BUDGET.
PUBLIC WORKS DEPARTMENT FY Budget Worksession July 22, 2009.
MARCH 19, 2014MARCH 19, HIGHLIGHTS OF 2014 CAPITAL BUDGET Roads, Sewers, Transportation, Parks and Recreation, Other.
Town of Tecumseh 2012 Capital Works Projects. Road Projects ProjectBudget Road Paving Projects……………………..$850,000 – Asphalting – tar & chip – crack sealing.
The Corporation of the Town of Amherstburg Public Works Department 2013 CAPITAL BUDGET Presented to: The Heavy Construction Association March 20, 2013.
What does PWD do for our City?. Administrative Services Engineering Operations.
Leila Talebi (3/28/2012).  The existing land use of Cincinnati Zoo consists of various types including parking lot, open space areas, and steep wooded.
Heavy Construction Association March 25, 2015 Robert Sharon, Director of Infrastructure Services Ken Brown, P.Eng., Manager of Public Works Kit Woods,
TENTATIVE BUDGET PRESENTATION CITY COUNCIL PUBLIC HEARING SEPTEMBER 8, 2010.
STA Safety Project PID #76439 December 12, 2006.
EA204 Environmental Technology Stormwater Management Lot Grading & Easements.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Water Street Hydrologic and Hydraulic (H&H) Analysis (Drainage Study) Water Street Hydrologic and Hydraulic (H&H) Analysis (Drainage Study) City of Platteville.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
 Prepared by  Prepared for  City of Palm Coast, Florida  August 30, 2011  Drainage Study Sections 31 & 35/37 for Development of City Wide Stormwater.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
ITEM 9B Authorize a Commercial Developer Agreement with Keller Watermere, L.P., for South Village at Watermere, located south of West Southlake Boulevard.
Essex County Transportation Services Department Essex County Highways 2016 Construction Program Peter Bziuk P. Eng. Manager Design and Construction Services.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
DFW Connector Project Main Street Bridge Starting in March 2010 Subject to Change.
Linford School Drainage Improvements 21 March 2016 City of Laramie.
P UBLIC W ORKS D EPARTMENT Total Proposed Budget $52,121,714 Funded Full Time Equivalent Positions (FTEs) = 238 Budget page Budgets shown in Millions.
Public Works Capital Projects FY Projects Completed FY 2014.
COVINGTON RIDGE DEVELOPMENT Development Concerns for Nimishillen Township Board of Trustees and Nimishillen Township Residents An analysis by Stark County.
Excellence - Integrity - Service - Creativity - Communication Courts of Canterbury HOA Meeting Rufe Snow Reconstruction Project Construction Update Keith.
165 Partners, LLC. ALR Westgate Development-The Landings Russell County August 30, 2011 DP.
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
D Board of Aldermen Retreat May 19, 2012 City of Wentzville Transportation Program & Street Budget Update Scott J. Smith, P.E., Director of Public Works.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Stormwater Management
2nd Street Drainage and Paving Improvements
Environmental Services
Comprehensive Sewer Planning Update Meeting
DICKINSON AVENUE RECONSTRUCTION
Sherwood Drive Wolfville
Kerr Tar Project Update – June 2016
PROJECT NO. T SE Adams Street - SE 29th Street to SE 33rd Terrace
North Main Street Intersection Improvements at Route 460 Bypass
SE 12th Street Roadway Improvements February 8, 2005.
2008 Dirty Dog Run Course St Rt 46 North Main Street
Capital Budget Presentation
PROJECT 3004(18) NORTH CARPENTER ROAD MAJOR RECONSTRUCTION
Monterey County Project Report for Measure X Expenditures
City of Spruce Grove Capital Region Partners Presentation 2019
2019 Construction Season Preview
Presentation transcript:

Heavy Construction Association March 20, 2013 Robert Sharon, Director of Community Services Kit Woods, P. Eng., Manager of Environmental Services Allan Botham, P. Eng., Manager of Engineering Services

2013 Phase 6 PCC - Stormwater Retention Conversion$ 1,250,000 Miscellaneous$ 700,000 Total$ 1,950,000

Engineering Engineering to prepare for multiple, stand alone watermain replacement projects in $230,000 Construction Multiple, stand alone watermain projects to replace an aging cast iron system in the urban area.$1,915,000 Total $2,145,000

ROADS Various Paving Projects $ 1,370,000 Erie/Oak Intersection – Construction$ 2,000,000 Sidewalk Program$ 160,000 TOTAL $ 3,530,000

Erie South Storm Outfall – Cleaning/Insp$ 125,000 Pelee Drive Sanitary Sewer – Finish EA $ 87,000 Pond Modifications$ 170,000 Erie S. Sanitary Pump Station /FM$ 820,000 Total$1,202,000

Marentette Pump Scheme$ 10,500 McLoed Drain Culvert$ 20,000 5 th Conc. Drain Improvements$110,000 Sturgeon Creek Drain Modelling$ 48,600 Pelee Creek Drain Improvements$ 60,000 Murray Smith Drain Improvements$ 72,000 Setterington Lane Drain$ 96,000 Various others$ 13,000 Engineering – Drainage – Total $430,100

Possibilities Beyond 2013 Marlborough West Sewer Separation (2014/15)$1,700,000 Erie View Road $ 800,000 Erie Street South – North of Oak (2014)$1,200,000 Active Trails (2014/15)$ 500,000 Bridge Construction (2014/16)$ 820,000 Pelee Drive Sanitary Sewers (beyond 2016)$6,000,000