06/09/2011TIPP 20111. Introduction Observational study of supernova explosion (SN) is important for understanding the mechanism of SN in detail. – Observation.

Slides:



Advertisements
Similar presentations
Trigger issues for KM3NeT the large scale underwater neutrino telescope the project objectives design aspects from the KM3NeT TDR trigger issues outlook.
Advertisements

Overview of the current TDR system Introduction Electronics for instrumentation TDR core : Metronome, ADC, Merge Data Handling Pete Jones, University of.
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
IceCube IceCube Neutrino-Trigger network of optical telescopes Anna Franckowiak 1, Timo Griesel 2, Lutz Koepke 2, Marek Kowalski 1, Thomas Kowarik 2, Anna.
An ATCA and FPGA-Based Data Processing Unit for PANDA Experiment H.XU, Z.-A. LIU,Q.WANG, D.JIN, Inst. High Energy Physics, Beijing, W. Kühn, J. Lang, S.
ANTARES aims, status and prospects Susan Cartwright University of Sheffield.
21-25 January 2002 WIN 2002 Colin Okada, LBNL for the SNO Collaboration What Else Can SNO Do? Muons and Atmospheric Neutrinos Supernovae Anti-Neutrinos.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Trigger-less and reconfigurable data acquisition system for J-PET
A feasibility study for the detection of SuperNova explosions with an Undersea Neutrino Telescope A. Leisos, A. G. Tsirigotis, S. E. Tzamarias Physics.
RENO Electronics - QBEE - 장 지 승 ( 전남대학교 ) RENO Collaboration Meeting,
Status of the digital readout electronics Mauro Raggi and F. Gonnella LNF Photon Veto WG CERN 13/12/2011.
K. Honscheid RT-2003 The BTeV Data Acquisition System RT-2003 May 22, 2002 Klaus Honscheid, OSU  The BTeV Challenge  The Project  Readout and Controls.
Takeo Higuchi IPNS, KEK COPPER Revision and New CPU.
The Application of DAQ-Middleware to the J-PARC E16 Experiment E Hamada 1, M Ikeno 1, D Kawama 2, Y Morino 1, W Nakai 3, 2, Y Obara 3, K Ozawa 1, H Sendai.
September 22, 2005 ESF Workshop-Perugia 1 Virgo Control Electronic upgrade Annecy/Pisa/EGO B.Mours.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
TRIGGER-LESS AND RECONFIGURABLE DATA ACQUISITION SYSTEM FOR POSITRON EMISSION TOMOGRAPHY Grzegorz Korcyl 2013.
K.T. McDonald  BooNe Collaboration Meeting Jan. 23,  BooNE Options for the Supernova Trigger Kirk T. McDonald Princeton University (Jan. 16, 2009)
GBT Interface Card for a Linux Computer Carson Teale 1.
LECC2003 AmsterdamMatthias Müller A RobIn Prototype for a PCI-Bus based Atlas Readout-System B. Gorini, M. Joos, J. Petersen (CERN, Geneva) A. Kugel, R.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
7 th 高能物理学会大会, 李小男, 高能物理研究所 1 大亚湾反应堆中微子实验 触发和数据获取系统 李小男, IHEP On behalf of 触发 : 清华大学 DAQ:IHEP.
PHENIX upgrade DAQ Status/ HBD FEM experience (so far) The thoughts on the PHENIX DAQ upgrade –Slow download HBD test experience so far –GTM –FEM readout.
Detectors and read-out DetectorNo. of ch.Read-out method Device candidates CsI(Tl)768Flash ADCCOPPER + 65 MHz FADC FINESSE Active Polarimeter600 x 12 x.
Present and Future of Super-Kamiokande Experiment Chen Shaomin Center for High Energy Physics Tsinghua University.
ICARUS General Trigger Design Contributions from: M.Della Pietra, A.Di Cicco, P.Di Meo, G.Fiorillo, P.Parascandolo, R.Santorelli, P.Trattino B.Baboussinov,
David Abbott - JLAB DAQ group Embedded-Linux Readout Controllers (Hardware Evaluation)
A Front End and Readout System for PET Overview: –Requirements –Block Diagram –Details William W. Moses Lawrence Berkeley National Laboratory Department.
ANTARES  Physics motivation  Recent results  Outlook 4 senior physicists, ~5 PhD students, ~5 technicians M. de Jong RECFA 23 September 2005.
FADC progress in Vienna Reported by H.Ishino for Vienna FADC group M.Pernicka and H.Steininger.
11th March 2008AIDA FEE Report1 AIDA Front end electronics Report February 2008.
EUDRB: the data reduction board of the EUDET pixel telescope Lorenzo Chiarelli, Angelo Cotta Ramusino, Livio Piemontese, Davide Spazian Università & INFN.
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
CKM Data Source System CKM Electronics Group July 2003.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
C.Vigorito, University & INFN Torino, Italy 30 th International Cosmic Ray Conference Merida, Mexico Search for neutrino bursts from Gravitational stellar.
CEA DSM Irfu Reconstruction and analysis of ANTARES 5 line data Niccolò Cottini on behalf of the ANTARES Collaboration XX th Rencontres de Blois 21 / 05.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
First results from the Biocams J. Brunner. Cameras on floor 1 and floor 5 together with an OM and an ADCP Floor 1 –80m above sea floor Floor 5 –270m above.
IPHC - DRS Gilles CLAUS 04/04/20061/20 EUDET JRA1 Meeting, April 2006 MAPS Test & DAQ Strasbourg OUTLINE Summary of MimoStar 2 Workshop CCMOS DAQ Status.
Takeo Higuchi (KEK); CHEP pptx High Speed Data Receiver Card for Future Upgrade of Belle II DAQ 1.Introduction – Belle II DAQ Experimental apparatus.
Sep. 17, 2002BESIII Review Meeting BESIII DAQ System BESIII Review Meeting IHEP · Beijing · China Sep , 2002.
HIGUCHI Takeo Department of Physics, Faulty of Science, University of Tokyo Representing dBASF Development Team BELLE/CHEP20001 Distributed BELLE Analysis.
1 April 2009 NA62 DAQ meeting1 LKr calorimeter readout project H.Boterenbrood, A.Ceccucci, B.Hallgren, M.Piccini, H. Wendler.
QuarkNet and Cosmic Ray Muon Flux Experiments Florida Academy of Sciences Spring Conference 2009 Alfred Menendez and Michael Abercrombie with Dr. Marcus.
KLM Trigger Status Barrel KLM RPC Front-End Brandon Kunkler, Gerard Visser Belle II Trigger and Data Acquistion Workshop January 17, 2012.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
Astroparticle physics with large neutrino detectors  Existing detectors  Physics motivation  Antares project  KM3NeT proposal M. de Jong.
Medium baseline neutrino oscillation searches Andrew Bazarko, Princeton University Les Houches, 20 June 2001 LSND: MeVdecay at rest MeVdecay in flight.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
.1PXL READOUT STAR PXL READOUT requirement and one solution Xiangming Sun.
Jan. 25, 2011 Status of the Aerogel RICH Readout Trig/DAQ Meeting in Beijing 1 S. Nishida (KEK) S. Nishida Status of the Aerogel RICH Readout Belle II.
KM3NeT Offshore Readout System On Chip A highly integrated system using FPGA COTS S. Anvar, H. Le Provost, F. Louis, B.Vallage – CEA Saclay IRFU – Amsterdam/NIKHEF,
Antares status and plans  Reminder  Project status  Plans M. de Jong.
Vladimir Zhulanov for BelleII ECL group Budker INP, Novosibirsk INSTR2014, Novosibirsk 2014/02/28 1.
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
The ALICE Data-Acquisition Read-out Receiver Card C. Soós et al. (for the ALICE collaboration) LECC September 2004, Boston.
IRFU The ANTARES Data Acquisition System S. Anvar, F. Druillole, H. Le Provost, F. Louis, B. Vallage (CEA) ACTAR Workshop, 2008 June 10.
Development of new DAQ system at Super-Kamiokande for nearby supernova A.Orii T. Tomura, K. Okumura, M. Shiozawa, M. Nakahata, S. Nakayama, Y. Hayato for.
Eric Hazen1 Ethernet Readout With: E. Kearns, J. Raaf, S.X. Wu, others... Eric Hazen Boston University.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
Digital Acquisition: State of the Art and future prospects
Commissioning of the new electronics and
DAQ ACQUISITION FOR THE dE/dX DETECTOR
JEDI polarimetry – Developments at SMART|EDM_Lab
Neutrino astronomy Measuring the Sun’s Core
Example of DAQ Trigger issues for the SoLID experiment
TELL1 A common data acquisition board for LHCb
Presentation transcript:

06/09/2011TIPP 20111

Introduction Observational study of supernova explosion (SN) is important for understanding the mechanism of SN in detail. – Observation of SN through neutrino provides unique opportunity. – Super-Kamiokande (SK) is able to detect large number of SN neutrino events, which should reveal detailed mechanism of explosion. Nearby supernovae (within the Galaxy) are being awaited. – The nearer SN is, the more neutrino events are detected. – Can we really handle such a large number of neutrino events? 06/09/2011TIPP 20112

Super-Kamiokande Detector Super-Kamiokande (SK) is a ring imaging water Cherenkov detector – 13,000 photomultiplier tubes (PMTs) equipped in 50,000 tons of water tank Physics Topics of SK – Atmospheric neutrino oscillation:  m 23,  23 – Solar neutrino oscillation:  m 12,  12 – Neutrino beam from accelerator (T2K): search for  13 – Search for neutrinos from supernovae (burst or diffused) – Search for proton decay 06/09/2011TIPP m 39.3 m 20 inch

Neutrino Astronomy Supernova Explosion (SN) – Collapse of a massive star – Release enormous amount of energy Primarily (> 99%) in the form of neutrino In just 10 seconds SN1987A – On February 23, 1987, SN occurred in Large Magellanic Clouds. – Kamiokande observed 11 events of neutrinos from SN. SN is expected to occur inside the Galaxy once every 10 to 50 years. – If a SN occurs at the center of the Galaxy, SK expects to detect about 10k neutrino events. 06/09/2011TIPP Before explosion

Nearby Supernova In June 2009, it was reported that the size of Betelgeuse (  Orionis) decreased by 15% over past 15 years. – C. H. Townes et al. 2009, ApJ, 697, L127 If a SN burst occurs at 500 ly from the earth, the total number of events in 10 s at SK reaches 30M and the maximum event rate exceeds 30 MHz. – Candidates Betelgeuse: 640 ly Antares: 550 ly 06/09/2011TIPP event rate [Hz] time [s] Event Rate [Hz]

Current DAQ Capability 06/09/2011TIPP 20116

New DAQ System Need new DAQ system in parallel to the current system for the SN burst study. Requirements for new system: – Independent from current online DAQ system – Stable against event rate Utilize number of hit PMTs – Since energy distribution of SN neutrino is narrow, we can estimate the number of neutrinos from number of hits. 06/09/2011TIPP Energy[MeV] Observed neutrino energy at SK MC

Schematic View of New DAQ Digital HITSUM – Frontend electronics board (QBee) has an output of number of hit PMTs. – Provided in 60 MHz New module – Sums up HITSUMs from 10 boards. – Summed-up numbers are read out by PC through Gigabit Ethernet and written to disk. 06/09/2011TIPP PC Digital HITSUM Digital HITSUM New Module (sum up HITSUM) Gigabit Ethernet Disk QBee ×10 QBee ×10 New Module (sum up HITSUM) 60MHz clock + 60kHz counter SK system clock (Master Clock)

Time Resolution 06/09/2011TIPP Dark noise Peak of neutrization burst

Prototype of New Module 06/09/2011TIPP FPGA Digital HITSUM Inputs Ethernet Port SODIMM Socket for 4GB DDR2 SDRAM

Block Diagram of New Module Additional Feature – 4 GB RAM to store 60-MHz summed HITSUM information for 1 minute Obtain maximal time resolution around supernova trigger Dump data on memory through another Gigabit Ethernet port – Supernova trigger can be generated inside the module, or input from the other system. 06/09/2011TIPP New Module 4GB Memory GbEth1 GbEth2 FPGA Spartan6 Input Signal System Clock (60 MHz) External SN Trigger Output Signal Summed Digital kHz 60-MHz Summed Digital HITSUM Dumped from Memory Module MHz Internal SN Trigger

Status and Plan Test with prototype module at test bench is ongoing. – Basic test for the module functionality – Debug of the FPGA program (firmware) Revision of the module is underway. – Correction for the malfunctioning part – Addition of functionalities that we overlooked Test of the module with the current DAQ system is planned in this summer. – Start mass production of the module after this test Deployment will be completed in this Japanese fiscal year (by next March). 06/09/2011TIPP

Summary Super-Kamiokande is preparing for the nearby supernova neutrino burst. – Current data acquisition system can catch up with SN at 1300 ly or further. – New system is under development for the nearer SN. This new system has always the same data size, i.e., stable against the neutrino event rate. Deployment will be completed in this Japanese fiscal year. – Hope that nearby supernova burst won’t occur before new system is ready… 06/09/2011TIPP

BACK UP 06/09/2011TIPP

SK Online System LINUX Multi-threaded software is running on Online PCs equipped with 4 CPU cores. From electronics to offline disk, data is transferred using TCP/IP protocol, with commercial Ethernet network equipment. 06/09/2011TIPP Disk QBee 13,000 PMTs 550 QBees Front End PC 20 Front-end PCs 24PMTs 30QBees Merger Software trigger QBee Front End PC Front End PC Merger Software trigger Merger Software trigger 10 Merger PCs Offline analysis Sorting Data from 30Qbee Ethernet Organizer Event builder 1hit cell = 6byte (ch, T, Q) ~ 660kB/s/QBee ~ 14MB/s/FEPC ~ 430 MB/s ~ 4.5kHz/PMT Recorded Data: 9MB/s typical

Digital HITSUM Each frontend electronics module (QBee) is connected to 24 PMTs. – Every 60 MHz time period, QBee outputs number of PMT hits (0 to 24) through a dedicated port. This digital signal is continuously output independently from the main data flow. 06/09/2011TIPP MHz (~17nsec) PMT hit HITSUM = 3 HITSUM = 2 Digital HITSUM

Neutrinos from Supernova Expected number of events at SK (T. Totani, K. Sato, H. E. Dalhed, and J. R. Wilson 1998, ApJ, 496, 216) Expected energy distribution at SK for 10-kpc supernova 06/09/2011TIPP

Signal Sensitivity 06/09/2011TIPP Time Resolution [MHz] Estimated Number of Dark Noise hits [hits/bin]

Test Bench for Prototype 06/09/2011TIPP Master Clock 1. Count up event number and send to Master Clock module Prototype Board Client PC (Linux) Event number Encoded event number 60MHz system clock (LVDS level) Event number via Ethernet VME trg32 2. Receive event number and send 60MHz clock and encoded event number via RJ45, LVDS level 3. Decode event number and send it via Ethernet 4. Receive event number and read out

Current SN Detectors 06/09/2011TIPP DirectionalityNumber of events expected for 10 kpc