Targets for project progress 2015: graduation review – clear documentation and PoC implementation specify general framework and API requirements gap analysis.

Slides:



Advertisements
Similar presentations
Reporting Status or Progress. Define the Subject n Break the subject into areas of discussion n List the main subject components here.
Advertisements

GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
FCMAT Response & Preparation: Process Outline October 25, 2006.
1 Femto Cell System Overview S.P Status Update to CDG and Femto Forum Fukuoka, Japan, September 2010.
S&I Framework Testing HL7 V2 Lab Results Interface and RI Pilot Robert Snelick National Institute of Standards and Technology June 23 rd, 2011 Contact:
8/28/2005ECEN5543 Req Elicitation1 Targets of Requirements Engineering ECEN 5543 SW Engineering of Standalone Programs University of Colorado, Boulder.
1 April 2010 TX SET Timeline Project Conceptualization 11 weeks Market Requirements 12 weeks ERCOT Requirements 12 weeks Conceptual Design 6 weeks Detail.
Escalator Project Proposal 20 April 2015 Jie Hu, ZTE.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
Development and Quality Plans
About Waterloo website Project report June Outline Overview of process Project deliverables Lessons learned.
Configuration Management Avoiding Costly Confusion mostly stolen from Chapter 27 of Pressman.
Release & Deployment ITIL Version 3
ENTERPRISE DATA INTEGRATION APPLICATION ARCHITECTURE COMMITTEE OCTOBER 8, Year Strategic Initiatives.
CEOS-CGMS Working Group on Climate John Bates, NOAA SIT-30 Agenda Item #11 Climate Monitoring, Research, and Services 30 th CEOS SIT Meeting CNES Headquarters,
Functional Model Workstream 1: Functional Element Development.
RUP Fundamentals - Instructor Notes
© Blackboard, Inc. All rights reserved. Back to the Feature: An Agile, User-centric Software Development Lifecycle Cindy Barry Senior Product Manager Martha.
OSF/ISD Project Portfolio Management Framework January 17, 2011.
Enterprise Product Implementation Process. Components of a Successful Implementation  A detailed Scope Document for customer review and signoff  Creation.
Rational Unified Process Fundamentals Module 4: Disciplines II.
University of Wisconsin System HRS Project Update to ITC November 19, 2010.
EGEE is a project funded by the European Union under contract IST Testing processes Leanne Guy Testing activity manager JRA1 All hands meeting,
1561 INITIATIVE Lessons Learned and Future Considerations
MPTCP – MULTIPATH TCP Interim meeting #3 20 th October 2011 audio Yoshifumi Nishida Philip Eardley.
Project Management Models
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
Progress update on developing Health Sector Strategic Plan (HSSP IV) Joint Annual Health Sector Review Technical Review Meeting Wednesday 5 th.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 5 Project Integration Management.
Objectives: Develop a solution to either enhance or replace the FasTrak tool Scope/Why is this important?: Increase the transparency for issues that are.
S&I Standards Organization Engagement & Communication Plan DRAFT Standards Support Team 1 September 2011.
IHE Marketing and Implementation Resources IHE Marketing and Implementation Resources Chris Carr Director of Informatics, Radiological Society of North.
Lifecycle of a Requirement in Product Development Scenario RMsis – v Simplify Requirement Management for JIRA.
PSCIOC-PSSDC Workplan Coordination Strategy– Draft Coordination Committee Telecon
Proposed B-release planning for dpacc documentation (for discussion) 9/16/2015 1December 7, 2015 OPNFV Introduction.
Pilot Workgroup (WG) S&I Team ONC Communication Paths Legend Communications Point of Contact (POC) Pilot Workgroup (WG) S&I Pilot Communications Transitions.
Southend Together Secretariat 21 st February Developing Southend Together’s Sustainable Community Strategy
Overview of RUP Lunch and Learn. Overview of RUP © 2008 Cardinal Solutions Group 2 Welcome  Introductions  What is your experience with RUP  What is.
Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts.
Worldwide Protein Data Bank wwPDB Common D&A Project Full Project Team Meeting Rutgers March 16-19, 2010.
State of Georgia Release Management Training
1 Item 2.1.b of the agenda IT Governance in the ESS and related issues Renewal of mandates STNE Adam WROŃSKI Eurostat, Unit B5.
Doc.: IEEE /1394r0 Submission November 2008 Jose Puthenkulam (Intel)Slide 1 Summary of m Development Process Date: Authors:
Recent Results of JCA-NID and TSAG Byoung Nam LEE HyoungJun KIM ETRI, Korea.
Doc.: IEEE /0147r0 Submission January 2012 Rolf de Vegt (Qualcomm)) Slide ai Spec Development Process Update Proposal Date:
Mitigation & Education (MES) Subcommittee Update Chris Jonientz-Trisler, FEMA Co-Chair.
CERES-2012 Deliverables Architecture and system overview 21 November 2011 Updated: 12 February
Middle Fork Project Relicensing Process Plan April 25, 2006.
Reliability Standards Development Plan David Taylor Manager Standards Development Standards Committee Meeting June 12-13, 2008.
Lead from the front Texas Nodal 1 Early Delivery System Testing Environments & Planning – Involving Market Participants TPTF May.
In the Framework of: Financed by: Developed by: Business Planning for Water Associations Prepared by Water Supply and Sewerage Association of Albania SHUKALB.
Chris Price TSC Chairperson TSC Composition & Governance 1.
PROPOSED STRATEGIC PLANNING PROCESS DECEMBER 3, 2014 Port of Port Angeles.
CIIMS Proposal for TOP-003 Approach Stacen Tyskiewicz WECC CIIMS Chair March 22, 2016.
Defining ONAP APIs With BSS/OSS
20th CJK UNIOT-WG (Standardization of Mobile IPTV in ITU-T)
CIIMS Proposal for TOP-003 Approach
GEOSS Data Sharing Principles
ETSI NFV POCS and PLUGTESTS
Tomi Juvonen SW Architect, Nokia
Validation & conformity testing
PM 584 Competitive Success/snaptutorial.com
PM 584 Education for Service/snaptutorial.com
ESS Vision 2020: ESS.VIP Validation
Reliability Standards Development Plan
Strategic Planning Timeline Overview
PaP Product Definition
Timeline Overview Planned Timescales
Project Overview.
E-learning Projects Overview
Presentation transcript:

Targets for project progress 2015: graduation review – clear documentation and PoC implementation specify general framework and API requirements gap analysis for upstream projects invite parallel PoC implementations and coordinate testing 2016: integration review : – extend the work for more usecases – work for OPNFV release plan

Planning for 2015 Scope refinement – usecase: packet processing, encryption, transcoding (?) – management interfaces: added for documentation? documentation planning (for discussion later) – framework ( Mid April), usecase (April) – gap analysis (May) – test spec (June), test report (Dec) demo/testing planning – lab testing (May-Dec) – opnfv summit (October)

Collaborative Documentation Development Follow 3GPP/ETSI's style Consensus in the weekly meeting needed for official approval for creation/baseline update for each work item once created each work item has its own dedicated maintainer, who is responsible for – collecting contribution/dicussion from the team and propose the baseline update before online meeting review – updating baseline doc and post it through group for further contribution/discussion afterwards each team member is welcomed to post contribution – in marked version based current baseline via before meeting Meeting slots for work item discussion are scheduled per reporteaur's request or based on the item's timeline priority and activity.

WORK ITEM DISCUSSION If time allows

Work item discussion Creation discussion for framework and usecase – maintainer – scope – relation with other work items – timeline – content outline

Framework Scope: – general description of the targetted problem, the proposed overal architecture, API design considerations and potential gap at different layers/interfaces Outline: – problem statement – overall architecture and general information model capacity req description, resource mapping and scheduling resource discovery/subscription, resource utilization – related upstream components and current status timeline: Mid April

Usecase Scope: – for each use-case in scope, elaborate in more detail regarding the application scenario, operation procedure instantiation and how to benchmark the performance Outline: (for each use-case) – overview of current practices – overall architecture mapping and design considerations – specific data model for various interfaces/APIs – performance metrics and benchmarking methodology timeline: stable by the end of April for – IPsec – any other VNF scenarioes?