A Combined Solution for Sediment Remediation and Waterfront Development A Combined Solution for Sediment Remediation and Waterfront Development John T.

Slides:



Advertisements
Similar presentations
Home with an Underground Heating Oil Tank (UST) Solutions for your Leaking Heating Oil Tank.
Advertisements

Twin Cities Army Ammunition Plant 2007 Remedial Actions at TCAAP Site C Excavation/Stabilization/Disposal of Contaminated Soils, Placement of Soil Covers,
Analysis of Dike 14 CDF to Public Greenspace. Who owns Dike 14? State of Ohio holds Dike 14 as a public trust land Cleveland-Cuyahoga County Port Authority.
Cytec Statement of Basis and Permit Modification July 16, 2012 Public Hearing Ohio Environmental Protection Agency.
Northwest Region Cleanup Program Zidell Waterfront Property Cleanup 2012 Portland Scott Manzano | Oregon Department of Environmental Quality.
Confined Disposal Facilities and In Situ Capping Site characterization / selection Engineering design Operational considerations Contaminant pathways and.
Oregon Cleanup Program Top Priorities. Goal: cleanup contaminated property so human health and the environment are protected and contaminated properties.
Introduction to Brownfields New Partners for Community Revitalization, Inc. June 29, 2009.
Integrated Waterfront Cleanup and Marina Development in Bellingham, WA Tom Wang, P.E. WEDA Pacific Chapter – San Diego 2009.
PA One Cleanup and Land Use Controls The “Business of Brownfields” Conference April 17, 2008 Terri Smith Environmental Liability Management, Inc.
AHMET UCANOK JOHN E. ELVIS Pump and Treat of Contaminated Groundwater at the United Chrome Superfund Site Corvallis, Oregon.
 Cold Spring is a town in New York State, situated on the Hudson River  To the south of Cold Spring is:  Foundry Cove – a small river inlet  Constitution.
US Army Corps of Engineers BUILDING STRONG ® FOLSOM DAM MODIFICATIONS APPROACH CHANNEL EIS/EIR Major Robert Dion and Cameron Sessions Project Managers.
1 UNITED CONSULTING Presentation to
Location In the mountain of Colorado consist of numerous sites in Denver area which contaminate with radioactive soils and Debris. There are about 65.
Neponset River Capen Street Investigation Milton, MA Executive Office of Energy and Environmental Affairs (EOEEA) Department of Environmental Protection.
Environmental Consultants BMI Environmental Services, LLC AN OVERVIEW OF THE WETLANDS REGULATORY PROCESS AS IT RELATES TO THE PROPOSED OCEAN SPRINGS HIGH.
Who’s Monitoring Land Use Controls on Brownfield Sites? Terri Smith Environmental Liability Management, Inc.
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
Water Conservation Measures in Green Building By Sijia Cao.
Wisconsin’s Brownfields Initiative National Governors Association Coastal Brownfields Cambridge, MA September Michael Prager-Wisconsin Dept. of.
Prepared for: Prepared by: A Tutorial for Identifying a Project-Specific Dredged Material Placement Site October 2012 Bill Goodfellow Kaitlin McCormick.
Scott Surovchak Rocky Flats Site Manager U.S. Department of Energy (DOE) Office of Legacy Management (LM) Cleanup and Remedy Implementation at the Rocky.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Overview of Regulatory Changes, Policy and Implementation Colleen Brisnehan Colorado Department of Public Health And Environment Hazardous Materials and.
Fort Ord, Monterey County, California History and Closure of a Landfill on a former Military Installation and Current Superfund Site Derek S. Lieberman,
Case Study: Campmarina Sheboygan River Sediment Removal Project.
Spectron Superfund Site Proposed Plan Contaminated Shallow Soils U.S. EPA Region III June 26, 2003 Philadelphia, PA Robert J. Sanchez US EPA - Remedial.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
New Bedford High School & Adjacent Properties Status of Off-Site Environmental Investigations - Public Meeting July 12, 2006.
CHEMICAL COMMODITIES INC. The History, Cleanup and Ecological Reuse of a Superfund Site 1.
U.S. Army Corps of Engineers Decision Authority l All permit decisions, scope of analysis, 404(b)(1), mitigation, alternatives, jurisdiction -- Corps.
Coastal Brownfields: At the Water’s Edge Panel: Waterfront Revitalization and Marine Transportation.
Module 6: Alternatives. 2  Module 6 contains three sections: – 6.1 Development and Screening of Alternatives – 6.2 Detailed Analysis of Alternatives.
Environmental Dredging of Perfluorochemical-Impacted Sediment from a Sensitive Wetland Mark A. Gaetz (3M) Paul Lear (WRScompass)
Cleanup and Remediation of Persistent Bioaccumulative Toxics in the Great Lakes Basin Gina Bayer, CH2M HILL PBT Strategy Team Maumee Bay Meeting February.
Triangle Park Removal Action Area within the Portland Harbor Superfund Site (Portland, Oregon) Jennifer MacDonald Assistant Regional Counsel Office of.
SUCCESSFUL GREAT LAKES DREDGING PROJECTS GOVERNMENT & PRIVATE SECTOR WORKING TOGETHER Joseph HeimbuchRobert Rulede maximis, inc. PIANC USA COPRI ASCE 2012.
State and Tribal Government Working Group November 12, 2008 FERNALD NATURAL RESOURCE DAMAGES SETTLEMENT.
Alternative Sediment Remediation Authorities to CERCLA: Elizabeth River Demonstration Robert Engler Moffatt & Nichol),
Lynne Welsh Massachusetts Department of Environmental Protection.
Cumberland Park CCB Project Virginia Department of Environmental Quality October 9, 2007.
Middle Harbor Redevelopment Project WEDA Conference November 5, 2009.
EPA Infrastructure Pvt. Limited
San Francisco Ocean Beach-Great Highway Erosion Control Project.
Project Update: Hudson River PCBs Superfund Site October 24, 2012 Mr. David King, PE – USEPA Region 2 Mr. Gary Klawinski – USEPA Region 2 Mr. Mark Surette.
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
By: Amanda, Rakkir, Rebecca, and Franklin. Executive order U.S army Corps Engineers Environmental Protection Agency (EPA) Section 401 of the Clean.
Overview of Legal Issues in Marcellus Shale Development Penn State Ag Council Membership Meeting October 12, 2009 Agricultural Law Resource and Reference.
Department of Army Permitting Process: Dredging
Pennsylvania Mine Removal Strategy Snake River Task Force Meeting May 29, 2013.
Green Energy and the Brownfields: Energy and the Environment Clean up of Manufactured Gas Sites in Illinois Lawrence W. Eastep, P.E. Manager, Remedial.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
Department of Toxic Substances Control (DTSC) Draft Feasibility Study/Remedial Action Plan Draft Feasibility Study/Remedial Action Plan Schlage Lock and.
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
Technical Assistance Network Knowledgeable Sources For Communities Stephen Dyment USEPA Office of Superfund Remediation and Technology.
South Framingham Initiative MassDEP’s Project to Improve Environmental Quality in an Environmental Justice Neighborhood 2015.
The Voluntary Investigation and Cleanup Program Investing in the environment and your economic future Gerald Stahnke, VIC Program Project Manager Minnesota.
PORT OF TACOMA. Request authorization to award Professional Services Agreement (PSA) No with Geomatrix; and PSA No with Hart Crowser for.
The Dalles, Industrial Certification Northwest Aluminum Company The Dalles, Oregon Douglas C. MacCourt Ater Wynne LLP US German Bilateral Working.
Karolina Brownfields Redevelopment Site Ostrava, Czech Republic Thomas C. Voltaggio Senior Advisor Dawson & Associates
Beneficial Use of Dredge Materials: Introduction to Dredging and Policy J. Bailey Smith US Army Corps of Engineers April 4, 2011.
GEORGIA PACIFIC WEST PROPOSED INTERIM ACTION Public Meeting & Open House – July 12, 2011.
Results of Screening Analyses of 224 California MSW Landfills Landfill Compliance Study presented to California Integrated Waste Management Board by GeoSyntec.
CALCASEIU RIVER AND PASS DREDGED MATERIAL SEDIMENTATION STUDY.
Lake Erie Dredge Material: Finding a Solution for Ohio Ohio Brownfield Conference 2016 April 6-7, 2016.
Bridge Pile Foundation Evaluation for a Soil Remediation Project
RESTORING CONTAMINATED SITES TO PRODUCTIVE USE
Robert Geller Missouri Department of Natural Resources
Port of Portland properties and facilities
Presentation transcript:

A Combined Solution for Sediment Remediation and Waterfront Development A Combined Solution for Sediment Remediation and Waterfront Development John T. Finn, P.E. GEI Consultants, Inc.. Dredging 2012

The Problem Dredging 2012

Removal of Sheen-Producing Sediments Protection of Existing Bulkheads Capping of Remaining Sediments On-site Solidification of Dredged Sediments Preparation for Waterfront Redevelopment A Complex Problem: A Combined Solution : John Finn, GEI Dredging 2012

Location: A Slip in New Bedford Harbor

Manufactured Gas and Tar Plant OUTER SLIP INNER SLIP Dredging 2012

Outer Slip : - Remove all sheen-producing sediment in top foot - No off-site disposal: Place all dredged sediment in Inner Slip - 2-foot Composite Cap Inner Slip - Solidify dredged sediment and existing sediment/soil to bedrock - Prepare the site for waterfront redevelopment Minimum Remedy Requirements Dredging 2012

Remediation – Plan View Cell 2 Cell 1 Capping Area Fixed Turbidity Curtain Dredged Areas for Tar Removal Dredged Area for Cap Installation ISS Mixing Plant Water Treatment Facility Sheet Pile Walls Inner Slip ISS & Fill Area

Protection of bulkhead stability Final elevation allows sufficient draft for boat traffic Limited capacity of Inner Slip: - Account for expansion upon solidification - Account for expansion/settling upon dredging/placement Dredging Requirements and Constraints Dredging 2012

Dredging Behind Dual Curtains & Booms Dredging 2012

Dredging of Outer Slip

Vapor & Odor Suppression Foam Dredging 2012

GPS Positioning of Dredge Bites

Capping of Remaining Sediments Benthic Sand – 12 inches Stone Armor – 3 inches Gravel – 3 inches AquaBlok – 6 inches Sand Fill – thickness varies

AquaBlok Dredging 2012

Cap Placement Dredging 2012

Solidification: Inner Slip – Section View Cell 2 Cell 1 Existing Bulkhead Top of Bedrock (El ) New Sheet Pile Closure Walls Top of Dredge Spoils Top of Sediments Mean High Water Mean Low Water Top of Dredge Spoils Top of Bedrock (El ) Water Treatment Facility

Soil Mixing to Solidify Sediments

1,350 cubic yards dredged 18,000 ft 2 dredge area eight foot diameter ISS columns 37 - three foot diameter ISS columns 7,000 - cubic yards of sediment and soil mixed 427 ton of AquaBlok Dredging, Capping, and ISS Statistics

Site Ready for Waterfront Development Dredging 2012

Questions? Thank You Dredging 2012

Environmental Business Council’s 2012 Award for Collaboration Study of In-Situ Solidification of Contaminated Sediments, Sponsored by the Electric Power Research Institute (EPRI) Post-Scripts Dredging 2012

MassDEP leadership streamlined complex permitting –Reached out to federal, state & local regulators –Coordinated multi-agency team approach –Hosted & facilitated 2 critical multi-agency meetings Public engagement –Public notice soliciting public comments on 10/23/2010 –Public meeting on 12/8/2010 with USEPA and MassDEP Innovative MCP site closure strategy Coordinating Multiple Agencies

MassDEP –Release Abatement Measure Plan –401 Water Quality Certification –Chapter 91 License EPA – TSCA 61C –Risk-Based Cleanup Plan U.S. Army Corps of Engineers, New England District –Category 2 General Permit New Bedford Conservation Commission - Wetland Order Of Conditions Property Owner Agreement: Fueling Terminal Ops Permitting and Legal Framework Dredging 2012

Dredge Cut Lines Min. Max. El -14. El -15. Min. Max. El El -14. Tolerance Near BulkheadsTolerance In All Other Areas Dredging 2012