Twin Cities Army Ammunition Plant 2007 Remedial Actions at TCAAP Site C Excavation/Stabilization/Disposal of Contaminated Soils, Placement of Soil Covers,

Similar presentations


Presentation on theme: "Twin Cities Army Ammunition Plant 2007 Remedial Actions at TCAAP Site C Excavation/Stabilization/Disposal of Contaminated Soils, Placement of Soil Covers,"— Presentation transcript:

1 Twin Cities Army Ammunition Plant 2007 Remedial Actions at TCAAP Site C Excavation/Stabilization/Disposal of Contaminated Soils, Placement of Soil Covers, and Construction of Replacement Wetland U.S. Army Corps of Engineers Shaw Environmental, Inc.

2 Site C-2 Remedial Action Work Plan Clarification (WPC) No. 41 – Borrow soils sampling and excavation plan. Construction Start Date – 7/16/07. Excavation/Stabilization/Disposal of contaminated soils from 63 grids at Site C-2. Placement of approximately 38,000 cubic yards (cy) of fill material and 5,000 cy of topsoil for the soil cover construction (58 Grids and portions of the ditches required a minimum of 4 feet of soil cover due to contamination remaining in place). WPC No. 42 – Over-excavated soils. Construction of a Replacement Wetland located north of Site C-2 (~2 acres).

3 Site C-2 Remedial Action WPC No. 43 – Burn Area. Excavation/Stabilization/Disposal of ~200 cy of contaminated soil at the southern end of the wetland. Final Survey Construction Completion Date - 10/5/07.

4 Site C-2 Pre-Excavation

5 Site C Site C-2 Excavation of Contaminated Soils

6 Site C Site C-2 Excavation of Contaminated Soils and Verification of Elevation

7 Site C Site C-2 Stabilization of Contaminated Soils

8 Site C-2 Site C-2 Load Out of Contaminated Soils

9 Site C-2 Site C-2 Load Out of Contaminated Soils

10 Site C-2 Site C-2 Grading

11 Site C-2 Site C-2 Final Grade

12 Site C Replacement Wetland Clearing and Grubbing

13 Site C Replacement Wetland Excavation of soils from Wetland Area

14 Site C Replacement Wetland Installing the Swale and Placing Rock

15 Site C Replacement Wetland Installing the Swale and Placing Rock

16 Site C Replacement Wetland Removal of the Existing Weir

17 Site C Replacement Wetland Burn Area

18 Site C Replacement Wetland Burn Area Sampling

19 Site C Replacement Wetland Wetland Final Grade

20 TCAAP Osprey


Download ppt "Twin Cities Army Ammunition Plant 2007 Remedial Actions at TCAAP Site C Excavation/Stabilization/Disposal of Contaminated Soils, Placement of Soil Covers,"