GSN Budget CoCom meeting Chicago April 9-10, 2012.

Slides:



Advertisements
Similar presentations
John A. Orcutt Deputy Director, SIO Ocean Observations Initiative NSF MREFC Chair, NSF/CORE DEOS Comm.
Advertisements

1 Guy Duchossois, Work Plan Manager Report on 2006 Work Plan.
YES New Mexico Enterprise Eligibility System
Rural Broadband, LLC Henry County Fiber Network Initiative Rural Broadband, LLC 15 Lake Street, Suite 270 Savannah, GA Contact: Allen Davis
Society-relevant Arrays for Developing Countries: Opportunities and Challenges in South Africa Andy Nyblade Penn State University Workshop on Arrays in.
Data Services FY14-FY18 Budget. DS 5 year budget constraints  FY13 budget  $3.96 million from core  $1.63 from USArray  Total $5.59 million  FY 14.
GSN Quality Assurance System Concepts of Operations GSN-QC Coordination Meeting IRIS DMC - 11/16/2011.
City of Pittsburgh 2015 Budget and Five-Year Plan September 22,
Transmission Corridor Zone Designation Process Terrence O'Brien, CEC December 11, 2007 Energy Action Plan.
STEM Education Reorganization April 3, STEM Reorganization: Background  The President has placed a very high priority on using government resources.
LIGO-G W LIGO Laboratory1 Educational Outreach Across LIGO Funding source: »LIGO operations »IPSE proposal submitted in 2003 (pending) »Advanced.
Roy Cales, NSI (850) American Recovery and Reinvestment Act Technology.
An Earth science program to explore the 4D structure of the North American continent.
Building the LTER Network Information System. NIS History, Then and Now YearMilestone 1993 – 1996NIS vision formed by Information Managers (IMs) and LTER.
CoCom 2012 April Budget framework: NSF merger of IRIS Cooperative Agreement & IRIS USArray into a single proposal - NSF (and gov’t) envisions.
J.B. Speed School of Engineering University of Louisville KEEPS Energy Management Toolkit Step 7: Recognize Achievements Toolkit 7A: Awards and Recognition.
WP5 Strategy Domenico Giardini SED ETHZ. WP5 Objectives Harmonize national implementation Integrate the European scientific community Establish Centres.
U.S. Department of the Interior U.S. Geological Survey Volcano Monitoring Plans for the Northern Mariana Islands USGS & CNMI Emergency Management Office.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
Facilitate – Collaborate – Educate CoCom April 9, 2012.
Perinatal and Infant Oral Health Quality Improvement National Learning Network Estimated Number Awards: One (1) Type of Award: Cooperative Agreement Estimated.
Partnering for Success: Relevant Initiatives Mental Health Services Act Prevention and Early Intervention Component.
April 2014 CoCom Presentation Template. SAGE Award First Year Budget FY14.
DEDEA STRATEGIC FRAMEWORK STAKEHOLDER BRIEFING 12 OCTOBER 2010.
NCAR Annual Budget Review October 8, 2007 Tim Killeen NCAR Director.
Tim Ahern The FDSN and IRIS GSN and PASSCAL “Networks”
A U.S. Sponsored Observing System of the Global Earth Observing System of Systems  Focus on the Network –Data Management –Products Global Seismographic.
PRESENTATION ON THE CGS ACTIVITIES FOR 2002/3 YEAR HISTORY OF CGS MANDATE OF CGS FINANCIAL PERFORMANCE FOR 2002/3 MAJOR INVESTMENT MADE BY CGS COMPLIANCE.
Overview of EarthScope 2010 May, 2010 Slides that may be used and modified for presentations involving instrumentation, data, science results, and education.
Instrumentation Centers: Lamont-Doherty Earth Observatory A. Barclay, J. Gaherty, M. Tolstoy Scripps Institution of Oceanography J. Babcock, A. Harding,
1 Taiwan’s IPv6 Status Update Ren-Hung Hwang, TWNIC 33.
U.S. Department of the Interior U.S. Geological Survey U.S. Department of the Interior U.S. Geological Survey Natural Hazards Science – Reducing the World’s.
Infrasound Consortium for Applied Research 2002 Infrasound Technology Workshop, Netherlands Milton Garces Infrasound Laboratory, University of Hawaii,
CoCom F2F meeting Chicago April 9-10, Expectations for April – 15 month Plan and Budget – Final budget to submit to BoD – Plan for.
Building Science Capacity using Seismology Michelle Grobbelaar.
USArray Year 10 IRIS CoCom Meeting Chicago April 9-10, 2012.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
AfricaArray: Using Seismology to Build Science Capacity in Africa -- An Example for GEOSS AfricaArray: Using Seismology to Build Science Capacity in Africa.
Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.
City of Rio Vista Budget 101 An Overview of Essential Tools CITIZENS OF RIO VISTA CITY STAFF CITY COUNCIL.
Real Time Data From the Plate Boundary Observatory Continuous GPS Network Mike JacksonUNAVCO PBO Directorand the PBO Staff AGU Joint Assembly May 26, 2009.
A facilities program for collection and distribution of seismological data for research and education related to: Earthquakes Earth Structure Earth Dynamics.
1 2009/10 DIVISION OF REVENUE BILL Presentation to Select Committee on Finance 24 February 2009.
1 Humanitarian Mine Action (HMA) Colombia Assistance Plan 9 – 12 June 2009 Mr. José M. Matos Stability Directorate Humanitarian Assistance Division
U.S. Department of Transportation Federal Highway Administration DOT Livability Initiative Smart Mobility Framework Workshop June 16, 2009 Presented by:
LIGO-G M Organization and Budget Gary Sanders NSF Operations Review Caltech, February 26, 2001.
Slide: 1 CEOS SIT Technical Workshop |Caltech, Pasadena, California, USA| September 2013 CEOS Work Plan Section 6.1 G Dyke CEOS ad hoc Working Group.
BESAC Workshop on Opportunities for Catalysis/Nanoscience May 14-16, 2002 William S. Millman Basic Energy Sciences May 14, 2002 Catalysis and Nanoscience.
Seeking SC Feedback on Draft Technology Strategy and Roadmap for EarthCube Draft of 3 November 2015 The Technology and Architecture Committee (TAC) Chairs:
Key foundational element of IRIS NSF funded the construction of the GSN (DoD funds also) Beginning in 1998 USGS line item for GSN established to take.
Introducing the Science and Technology Roadmap 1 st GEO/EGIDA Workshop Bonn, Germany, May 09 th - 11 th, 2011.
By Tim Ahern, Director of Data Services, IRIS An Overview of IRIS Incorporated Research Institutions for Seismology.
Tim Ahern The IRIS GSN and PASSCAL “Networks”. FDSN Archive for Continuous Data at the IRIS DMC FDSN Backbone Network 200 stations currently Plans to.
Community Activities Budget Justification, Proposal All costs are inflated at 2.5% / year. Costs in years 2 and 4 are higher to hold SITS. Direct Costs:Year.
October 2013 CoCom IRIS Portable Seismology PASC Version.
A. Review current infrastructure status within Europe Review and overview (national and European scale) of existing and planned Observational infrastructures.
PRESENTED TO: ENERGY FACILITY CONTRACTORS GROUP SAFETY ANALYSIS WORKING GROUP SAFETY ANALYSIS WORKSHOP BY: CHRIS CHAVES NSR&D PROGRAM OFFICE OF NUCLEAR.
U.S. ATLAS Computing Facilities Overview Bruce G. Gibbard Brookhaven National Laboratory U.S. LHC Software and Computing Review Brookhaven National Laboratory.
1 Transportable Array 9 th Annual Team Meeting TA Team Meeting La Jolla, CA Nov 9-10, 2015 Bob Busby TA Manager.
Partnering for Success: Relevant Initiatives Mental Health Services Act Prevention and Early Intervention Component.
By Tim Ahern, Program Manager IRIS DMS An Overview IRIS Incorporated Research Institutions for Seismology.
Budget Study Sessions Strategic Support Proposed Operating Budget OUTCOMES: - A High Performing Workforce that is Committed to Exceeding.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
Capacity Building Enhance the coordination of efforts to strengthen individual, institutional and infrastructure capacities, particularly in developing.
Grace Connolly Director, Administration & Finance January 17, 2018
Pacific Power Seismic Preparedness Update
Parks and Recreation Services
Department of Teaching & Learning
Dan Bradway, PMP, CFM March 20, 2019
Presentation transcript:

GSN Budget CoCom meeting Chicago April 9-10, 2012

GSN 15 month - Base Task12 Month15 month Ext Management $152 $169 Equipment/M&S (ASL request) $50 $63 IDA Subaward $2,193 $2, month Base request $2,199 $2,749 Site Refurbishment Add-on $34 Applied carryover $(40) ASL Site Refurbishment $100 Minor Subawards $60 $75 G&A $83 $104 Total Request $2,638 $3,349 Board Target $2,600 $3,250 diff $(3) $(99)

FY13-14 New Initiatives PIF-GSN – Infrasound - $90K – Procurement and integration effort to incorporate ~4 – 4 element infrasound arrays into GSN station. – Prep for 5 year larger deployment PIF PIF-GSN – OBS Installation - $250K – Coordinate with OBS community to improve non-ROV emplacement techniques to improve horizontal performance – Pan-IRIS – coordinate with OMO PIF-GSN – Array workshop - $95K – Facilitate a workshop on science and design associated with broadband arrays. – In preparation for pan-IRIS proposal initiative

GSN 5 year budget ( ) Target level is reduced to $2.4M – No more to cut but personnel. What are the implications for target? Equipment rich, people poor Slow deployments and responsiveness Reduction in Quality Inflation (salary/fringe) further cuts with time Loss of personnel – experience that is not easy to get back SC requests base equivalent to FY13 base – Still requires FTE reduction, but sustainable. – Mandatory California inflation still a factor

GSN-Programmatic Initiatives 1.Site Refurbishment (PIF-GSN ) – WBS – Quality improvements at GSN stations – $150K per year for all GSN 2.Strategic Densification/relocation (PIF-GSN ) - WBS – Years 3-5 to allow use of quality initiative 3.Infrasound (PIF-GSN ) – WBS – Expansion of FY13 developments to GSN – $300K/year for 5 years - ~50 stations 4.Met Packages (PIF-GSN ) – WBS – Enhancement to Infrasound and adds to Geophysical Observations at GSN 5.Next Gen Primary Sensors (PIF-GSN )– WBS – Continued procurements

Pan-IRIS Initiatives 1.Next Gen DAS (PIF-GSN ) – WBS – Preparation for end of life of current GSN DAS – $200K in FY18 – Coordinate with PASSCAL and TA next gen DAS evaluation 2.Broadband Array Deployment (PIF-GSN ) - WBS – 5 year plan for procurement, installation and operation – $7.2M total estimate – relies on array workshop for final costs – Possible implementation by PIC or some new facility 3.Subduction Zone Observatory (PIF-GSN ) – WBS – 5 year plan for procurement, installation and operation – $2.16M total estimate – ties to Cascadia possible – Possible implementation by PIC or some new facility – tied to UNAVCO for GPS component 4.OBS BB experiment add-on (PIF-GSN ) – WBS – Data mining and workshop to add-on to OBS experiment with long-term BB station, utilizing non-ROV enhanced emplacement (FY13 PIF). – Procure and test waveglider technology for low level telemetry – Ties to OMO

BACKGROUND – AS NECESSARY

External Sources of Funding Although the IRIS level of funding for the GSN has shown a sharp decline in recent years, we have been working for many years on seeking support from outside core IRIS funds for the recapitalization of the equipment for the network. Funding from external sources has been as follows: 2009 – NSF augmentation (facilitated by the American Recovery and Reinvestment Act (ARRA)) - ~$5M – These funds were for upgrading the GSN to the next generation field systems and secondary sensors. – We are spending down the last ~$500K of these funds this Spring 2009 – USGS ARRA funds - ~$5M – These funds are the USGS contribution to the GSN upgrade 2010 – Dept of Energy - $250K – Procurement of Secondary Sensors 2011 – Dept of State - $402K –Spare systems and site infrastructure to improve performance of the GSN station participating in the IMS (IRIS/IDA stations) 2011 – Dept of State - $215K - Spare systems and site infrastructure to improve performance of the GSN station participating in the IMS (IRIS/USGS stations) 2012 – Department of Energy - $5.7M – Procurement of Primary Sensors