15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 1 Answers from the HMPID to the ACC questions 1.Concerning global DCS overview drawing 2.Concerning.

Slides:



Advertisements
Similar presentations
ALICE DCS, Heidelberg 8 Sept G. De Cataldo, CERN CH and INFN Bari;A. Franco INFN Bari 1 Updating on the HV control systems in ALICE The DELPHI HV,
Advertisements

André Augustinus 22 June 2004 DCS Workshop Status on services controls.
JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
The Detector Control System – FERO related issues
André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
DCS workshop 13-14/6/2005G. De Cataldo, CERN-CH and INFN bari1 Common FSM’s updates An exercise to design the standard FSMs for the DCS, the HV and the.
Alarms and interlocks handling in the FSM environment Hypernet 1.The standardization of the FSM state diagram; 2.The FSM error states and their recovering.
ALICE DCS Workshop - 15/3/2004 G. De Cataldo, A.Franco, A.Tauro - INFN Bari - 1 The SY1527 replay delay via the OPC and the ‘SY driver’ (By HMPID) The.
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
SPD DCS Status Report Ivan Amos Calì a,b, S.Ceresa a,c, C.Torcato de Matos a a CERN-AIT a CERN-AIT b Università degli studi di Bari b Università degli.
André Augustinus 16 June 2003 DCS Workshop Safety.
BCAL Interlock System US BCAL Chiller US BCAL MPOD 1 US BCAL PLC Pulsed Output from Flow meter to PLC From US BCAL cooling loop US BCAL MPOD 1 RS485 from.
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
SCADA and Telemetry Presented By:.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
LHC Gas Control System Stefan Haider EP-TA1-GS ALICE DCS workshop, S.Haider2 Outline Introduction and working philosophyIntroduction and working.
D etector C ontrol S ystem HMPID SB G. De Cataldo CERN-CH, A. Franco & A. Nardulli INFN Bari, I 1 HMPID Updates and prototyping HMPID DCS with.
9th September 2001R. BARILLERE - IT-CO1 Industrial and Custom Front-End solutions for Process Controls.
André Augustinus 10 September 2001 Common Applications to Prototype A two way learning process.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
Gas Coordination Panel 24/08/2004 Flammable Gas Installation Requirements, Interlocks, etc. F.H.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
ALICE DCS Workshop - 14/03/2006 De Cataldo, CERN CH and INFN Bari - 1 Standardization of the DCS control panels The ACC is elaborating a set of panels.
1 Status and Plans DCS workshop L.Jirdén u Budget u Status u Planning u Goals for end 2002.
1 Responsibilities & Planning DCS WS L.Jirdén.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
D etector C ontrol S ystem ALICE DCS workshop G. De Cataldo CERN-CH, A. Franco INFN Bari, I 1 Finite State Machines (FSM) for the ALICE DCS:
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
Naming and Code Conventions for ALICE DCS (1st thoughts)
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
Bruno Belbute, October 2006 Presentation Rehearsal for the Follow-up meeting of the Protocol between AdI and CERN.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
André Augustinus 9 October 2006 Interlocks update.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
GIF++ Control System (GCS) Gilles MAIRE PH-DT-DI1.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
CMS ECAL DCS 10.Oct S.Zelepoukine ICALEPCS CMS ECAL DCS 1 The Detector Control System for the Electromagnetic Calorimeter of the CMS Experiment.
DCS Workshop 17 June 2002 PHOS DCS status Serguei Sadovski.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
22/May/02 JCOP meeting G. De Catatldo-A.Franco INFN Bari Italy 1 The Control System of the HMPID up to the end of 2001 ; 2002: The FSM toolkit, Hierarchy.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
DCS Meeting - 17/6/2002 G. De Cataldo, A.Franco - INFN Bari - 1 The implementation of the HMPID DCS in the PVSS-JCOP Framework The Liquid Circulation and.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
1 COSTING DCS WS L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
Pixel Action Matrix C. Newsom July 15, Overview Critical Parameters Initial Discussion – Top 6 critical failures Discussion - Detailed Documentation.
Recent developments in the Vacuum Control Software
Robert Gomez-Reino Garrido
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 1 Answers from the HMPID to the ACC questions 1.Concerning global DCS overview drawing 2.Concerning cooling and gas 3.Concerning interlocks 4.Concerning Front End Electronics 5.Concerning remote access to DCS

15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 2 URD’s HMPID Drawing Overview

15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 3 Updated Overview details are in red

15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 4 HMPID Gas schematic

15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 5 State diagram of the Gas system Gas STOP From the HMPID DCS The workstation running PVSS and the gas control program will be provided by the HMPID. The control program (PVSS+PLC) will be provided by the EP-TA1-GS group. It will let the user to operate the gas system according to the diagram in the figure and the HMPID DCS to acquire the system state. The control program will not accept commands from the HMPID DCS except the global STOP. This is foreseen in case of breaking of one of the C6F14 radiator.

15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 6 Cooling We agree that the HMPID user will be able to set the detector temperature. The set and measured parameters (Temp.,flow..) have to be archived. The TS/CV PVSS control program will provide the system logical state ( STOP, TEST, STAND-BY and RUN) to the HMPID DCS. Wishes For test reasons, it would be good for the HMPID to have the possibility to issue a STOP command to the cooling system selecting one of the module. In case of over temperature or failure of the cooling system, an interlock line should be activated. So far both the STOP command and the standard/logic of the interlock line have not yet discussed. Note: each HMPID module is equipped with some independent temperature sensors for the FERO temperature monitoring. PT100 IN PT100 OUT Although still under investigation, to control the detector temperature at least two PT100 sensors, one at the input of the cooling copper pipe on each HMPID module and the other to the output, are foreseen. In this way the control system will automatically adapt the input water temperature (and/or the flow) to the dissipated power (by the FERO sectors) in the module. The control program (PVSS+PLC) will be provided by the CERN TS/CV group while the workstation running PVSS will be provided by the HMPID group.

15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 7 Concerning hardwired cross-system interlocks Low Voltage/FEE CAEN SY1527 PVSS JCOP FW, SMI++, CAEN OPC High Voltage CoolingGas C6F14 Circulation Physical parameters PLC S300 STEP 7, Simens OPC WIENER PL500F8 External Interlocks: DSS,CSAM Cooling WS (running a PVSS control?) Gas WS running a PVSS control The hardwired interlocks connecting the HMPID subsystems are shown at the bottom of the figure. The gas system will release a normally open relay when the gas is “bad” and the gas system will be put in the STOP state (that will be notified to the HMPID DCS). In the already installed HMPID scheme, the opening of the (e.g.) Gas Interlock relay, removes +12 Volt from the SY1527 remote power ON input (12 V 50 mA) and the Wiener interlock input (accepting + 5 Volt, 10 mA). In this way the HMPID HV-LV can be switched OFF at the same time. For the Cooling system, although not yet defined, a similar normally open relay (?) could be released in case of cooling failure. Will the DSS and CSAM interlocks signal be provided with the same logic? The HMPID DCS, in addition to the internal interlocks, is also provided of software HV-LV corss-system Interlocks reacting in case of LV sector failure.

15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 8 HMPID FEE/FERO configuration Each configuration of the FE Electronics requires 7 Pedestal files and 7 threshold files (both ASCII files) for a total of 10 Mbyte/configuration. HMPID DCS Remote access A whish is to have the full DCS remote control A must is at least the DCS monitoring.