© GEO Secretariat 10 th UIC Outcomes User Interface Committee Sofia Antipolis, 26-27 February 2009 UIC co-leads / GEO Secretariat Geneva, Switzerland.

Slides:



Advertisements
Similar presentations
GEOSS ADC Architecture Workshop Break-out summaries: Initial Operating Capability (IOC) Doug Nebert U.S. Geological Survey February 5,
Advertisements

AIP-2 Demo Capture Workshop 4/5 May 2009 The Palazzo dei Congressi di Stresa Stresa, Italy.
© GEO Secretariat Agenda Item 3. GEO UPDATE. © GEO Secretariat Membership 67 members and 43 Participating Organisations – New Members:Latvia, Moldova,
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
User Interface Mechanism GEO GEO-I Meeting Ad Hoc User Interface Workgroup May 2005 Geneva.
Report of the Architecture and Data Committee (ADC) for the C4 Meeting Ivan B. DeLoatch, ADC Co-chair June 2008.
Work Plan Development Guidelines and Schedule.
Work Plan Development Guidelines and Schedule.
UIC Draft Report to C4: Issues and Recommendations 25 September, 2008 The UIC Co-Chairs Ellsworth LeDrew, IEEE Thierry Ranchin, France Francesco Pignatelli,
ID-06 Building a User-Driven GEOSS Essential Components of User Management for GEO Tasks.
Call for Proposals: Earth Observations in Decision Support Joint Effort of GEO Capacity Building Committee and User Interface Committee March 2009.
UIC Report to the GEO-VI Plenary: Accomplishments, Activities, and Recommendations November, 2009 The UIC Co-Chairs Ellsworth LeDrew, IEEE Carsten.
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
GEOSS Common Infrastructure (GCI)
Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
Slide 1 WGISS CEOS WGISS 22, Annapolis September 2006 Report on GEO Architecture & Data Committee (ADC) Report on GEO Architecture & Data Committee.
25th CEOS Plenary | Lucca, Italy| 8-9 November 2011 CEOS Executive Officers Report Agenda Item 17 Timothy Stryker CEOS Executive Officer Kerry Ann Sawyer.
The IGWCO Transition into GEO August 2007 IGWCO Secretariat 7bis, avenue de la paix CH-1211 Geneva 2.
© GEO Secretariat 2.4 Monitoring and Evaluation Activities Craig Larlee / John Adamec Co-Chairs, M&E Working Group GEO 2015 Work Plan Symposium 5—7 May.
Call for Proposals (CFP): Earth Observations in Decision Support Joint Effort of GEO Capacity Building Committee and User Interface Committee CFP Management.
Task AR-07-03: Global Geodetic Reference Frames Report to ADC-5 prepared by Hans-Peter Plag (IAG/GGOS) Nevada Bureau of Mines and Geology and Seismological.
© GEO Secretariat GEO WP & 2013 GEO priorities for CEOS Support GEO Secretariat CEOS SIT-28 NASA - Langley March 2013.
The Group on Earth Observations (GEO): An Introduction.
GEO Cold Regions: from Regional to Global effort --- As the interface between SAON and GEOSS Yubao Qiu Vancouver, Canada 29 March 2013.
Earth Sciences Sector Canada Centre for Remote Sensing By John Lyon and Co-Chairs, UIC Introduction to the UIC: A User Requirements Approach Gary J. Foley,
6. Strategic Plan : Implementing GEOSS Validating the way forward: Review of feedback from Plenary.
6th GEO Capacity Building Committee Meeting Hanover, Germany 13 to 14 February 2008 CB-07-01a Marta ANGOLOTI INM Spain.
GEO Architecture and Data Committee Architecture Workshop Hosted by the European Commission At the Joint Research Centre February 2008 DRAFT.
© GEO Secretariat 5.2 Monitoring and Evaluation John Adamec Co-Chair, M&E Working Group GEO-XI Plenary November 2014 Geneva, Switzerland.
7 th GEO Capacity Building Committee Meeting Tashkent, Uzbekistan 3-4 June 2008 CB-07-01a Task report Marta ANGOLOTI AEMET Spain.
© GEO Secretariat GEO Work Plan 2nd GEOSS Science and Technology Stakeholder Workshop "GEOSS: Supporting Science for the Millennium Development.
GEOSS Task AR-09-01b Architecture Implementation Pilot Phase 6 (AIP-6) Bart De Lathouwer Open Geospatial Consortium (OGC) GEO-X Plenary, Geneva, Switzerland.
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot George Percivall Open Geospatial Consortium GEO Task AR Point.
Slide # 1 GEO Task AR Architecture Implementation Pilot George Percivall GEO ADC Meeting, 14 & 15 May 2007.
GEOSS Architecture Implementation Pilot, Phase 3 - AIP-3 Initial Concepts - Hervé Caumont George Percivall Open Geospatial Consortium GEO Task AR-09-01b.
CEO Team SEO SIT Technical Workshop 25 – Agenda #16 EUMETSAT 17 th to 18 th September 2015 Committee on Earth Observation Satellites CEOS in the future.
Call for Proposals: Earth Observations in Decision Support Joint Effort of GEO Capacity Building Committee and User Interface Committee.
ST-09-01: Catalyzing Research and Development (R&D) Funding for GEOSS Florence Béroud, EC Jérome Bequignon, ESA Kathy Fontaine, US ST Kick-off Meeting.
ADC Meeting # 2, Seattle, July 2006 Slide # 1 Overview of ADC activities (Committee) Ivan Petiteville, CEOS Meeting # 2, Seattle, July 20-21, 2006.
GEO ADC Co-Chair meeting, Tokyo, Japan, 13 May 2007 Slide # 1 Cross-GEO Coordination Report of C4 Meeting and follow-up discussion Ivan Petiteville, CEOS.
Task NumberHarmonise, develop & implement capacity building Performance Indicators CB-07-01c Harmonise efforts by Tasks, in particular those related with.
Task AR-07-03: Global Geodetic Reference Frames Report to ADC-4 prepared by Hans-Peter Plag (IAG/GGOS) Nevada Bureau of Mines and Geology and Seismological.
Water Strategy Implementation Study Team Report Chu Ishida JAXA SIT Workshop Agenda 11 CEOS SIT Technical Workshop EUMETSAT, Darmstadt, Germany 17 th –
© GEO Secretariat GEO Work Plan Overview Document 20 GEO-VIII Plenary November 2011.
The GEO User Requirements Approach to Achieving Societal Benefits Gary J. Foley, USA Ellsworth LeDrew, IEEE Thierry Ranchin, France Francesco Pignatelli,
The ADC, the CBC and the UIC Where Should These Committees Be Interacting? Gary J. Foley, USEPA Co-Chair User Interface Committee July 20, 2006.
SIT Operations survey CNES SIT Workshop Agenda Item 26 CEOS SIT Technical Workshop EUMETSAT, Darmstadt, Germany 17 th – 18 th September 2015 Committee.
The Data Sharing Working Group 24 th meeting of the GEO Executive Committee Geneva, Switzerland March 2012 Report of the Data Sharing Working Group.
GEO ADC meeting, Washington DC, USA, Sep Slide # 1 “Future ADC meetings” Ivan Petiteville, CEOS GEO ADC Meeting, Washington DC, Sep
The ADC, the CBC and the UIC Where Should These Committees Be Interacting? Gary J. Foley, USEPA Co-Chair User Interface Committee July 20, 2006.
1 BUILDING A USER-DRIVEN GEOSS: Continuing User Engagement as a Priority of GEO Presented by Lerato Senoko, South Africa On behalf of the UIC Co-Chairs:
GEO ADC Co-Chair meeting USGS, Reston, Dec Slide # 1 AR Interface implementations for GEOSS George Percivall
Report from GEO Post-2015 WG and GEO Ministerial WG D. Brent Smith, NOAA CEOS Representative CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
Towards a New Phase of GEOSS Implementation : The GEO Work Plan Alexia C. Massacand GEO Work Plan Coordinator
Committee on Earth Observation Satellites CEO Team Plenary Agenda Item #4 29 th CEOS Plenary Kyoto International Conference Center Kyoto, Japan 5 – 6 November.
© GEO Secretariat Work Plan Management Update GEO Work Plan Symposium 30 April – 2 May 2012.
CEOS Response to GEOSS Water Strategy
Summary GEOSS Subgroup Teleconference
GEO WP 1. INFRASTRUCTURE (Architecture and Data Management)
GEOSS Data Sharing Principles
IGWCO CoP Overview Richard Lawford
Work Plan Management GEO Work Plan Symposium 30 April – 2 May 2012
Enabling Climate Services – The Group on Earth Observations (GEO) Barbara J. Ryan Director, GEO Secretariat GFCS Dialogue Geneva, Switzerland 01 July.
CEOS 3-Year Work Plan Annual Update
The GOOS and GCOS partnership
Sun Mon Tue Wed Thu Fri Sat
Summative Evaluation for GEOSS Implementation
Sun Mon Tue Wed Thu Fri Sat
Sun Mon Tue Wed Thu Fri Sat
Air Quality Data Systems and the GEOSS Architecture
Presentation transcript:

© GEO Secretariat 10 th UIC Outcomes User Interface Committee Sofia Antipolis, February 2009 UIC co-leads / GEO Secretariat Geneva, Switzerland

Group on Earth Observations User Interface Committee Expected Decisions & Deliverables for 10 th UIC Meeting: 1.List of specific projects & achievements UIC will deliver to Plenary VI 2.Draft of UIC Activity Plan 3.Writing Team and Delivery Date for Next Version of UIC Activity Plan 4.UIC Team & Delivery Date to Compose User Types for each SBA 5.Dates for UIC meeting in May at ISRSE in Stresa, Italy UIC members to help develop agenda 6.Dates & location for UIC meeting in August/September UIC members to help develop agenda 7.UIC Team & Delivery date for Analysis of User Engagement information in GEO Task Sheets 8.Date UIC will deliver list of specific projects & achievements UIC for 2010 Ministerial meeting 9.UIC Members to support specific activities in UIC/CBC Call for Proposals 10. UIC Team & Delivery date for Proposed UIC Membership Goals

Outcomes (A/Is) of Day 1 1.(Draft Activity Plan - related) GEO secretariat to look into the opportunity to have UIC member to attend the Climate Conference in March in Geneva. 2.(Draft Activity Plan) Members to get back to KF on comments from the Committee members, on the Draft Activity Plan, by the end of the meeting. 3.(ADC AIP Scenario) The Committee to take up efforts to identify who the decision makers are and how the GEO value chain works, and to see how the pilot projects work in this regard. Sec to compile the info from existing AIP docs 4.(ADC AIP Scenario) the agenda team to UIC to seek possibility of a joint committee session between ADC and UIC in may at Stresa, on AIP2.

Outcomes (A/Is) of Day 2 5.(US-09-01) UIC to modify task sheet schedule to expect 4 of 9 SBAs (Climate, Disasters, Ecosystems, Energy) by Sep 09, for other 5 due Jan 10, and Health to be discussed and refined for more progress; to report progress at Plenary VI, expect full task delivery in (Work Plan) UIC to form a team to follow-up with each sub-task currently under tasks US and 03, with a view to determine the relevance of them to UIC and how to communicate with them + user engagement in the other task sheets

Outcomes (A/Is) of Day 2 (continued) 7.(Call for Proposals) All UIC Members to support specific activities in UIC/CBC CFP, including advertising, identifying experts, and advisors, organizors working with resource-providing organizations. For Energy, E. Le Drew and T. Ranchin will organize. 8.(User assessment of portals with IOC) GF to ask UIC members to take specific assessment steps for the GEOSS portal and to participate to test rounds during the Stresa meeting.

Outcomes (A/Is) of Day 2 (continued) 9.(11 th UIC in Stresa) FP to communicate with ADC Co- Chair to propose a joint UIC-ADC meeting on Fri 8 May morning (0800). FP also to accommodate the following: Sat 2 May UIC meeting Sun 3 May : UIC Co-chairs meeting/dinner Tue 5 May : CFP UIC/CBC Info session Wed 6 May : CFP UIC/CBC Info session Thu 7 May : Energy CoP meeting Thu 7 May : “UIC User Engagement Reception” Fri 8 May : short UIC wrap-up meeting

Group on Earth Observations User Interface Committee Expected Decisions & Deliverables for 10 th UIC Meeting: 1.List of specific projects & achievements UIC will deliver to Plenary VI 2.Draft of UIC Activity Plan 3.Writing Team and Delivery Date for Next Version of UIC Activity Plan 4.UIC Team & Delivery Date to Compose User Types for each SBA 5.Dates for UIC meeting in May at ISRSE in Stresa, Italy UIC members to help develop agenda 6.Dates & location for UIC meeting in August/September UIC members to help develop agenda 7.UIC Team & Delivery date for Analysis of User Engagement information in GEO Task Sheets 8.Date UIC will deliver list of specific projects & achievements UIC for 2010 Ministerial meeting 9.UIC Members to support specific activities in UIC/CBC Call for Proposals – to be followed up by 10. UIC Team & Delivery date for Proposed UIC Membership Goals

Thank you!