TREADS Semester Review Dec. 14, 2007. Objectives Assess and Communicate Current Design Identify interfaces Approve the System Requirement Specification.

Slides:



Advertisements
Similar presentations
Interfacing Risk and Systems Engineering – Left Shift Risk Management
Advertisements

RAPUNZEL April 28, 2001 Advisory Board Presentation Presenters’ Names April 28, 2001 Advisory Board Presentation Presenters’ Names RAPUNZEL RAP id N oncond.
RockSat-C 2012 CoDR Minnesota Sound Wreckers Conceptual Design Review University of Minnesota Alexander Richman Jacob Schultz Justine Topel Will Thorson.
Space-Systems Engineering. Unit 3, Chapter 9, Lesson 9: Space Systems Engineering2 Space-systems Engineering Space Mission Design – Designing Space Missions.
Polar Highly Elliptical / Molniya Orbit Science (PHEMOS) Mission Phase 0/A Studies Mid-Term Review Meetings January 12-14th, 2011.
Protocol & Test Review Spaceport America Student Launch University/Institution Team Members Date.
Proposal Analysis Review NMSGC Student Launch University/Institution Team Members Date.
Data Test Review Spaceport America Student Launch University/Institution Team Members Date.
Flight Readiness Review New Mexico Space Grant Consortium University/Institution Team Members Date.
P11228 Week 2 Japh Learn Joseph Corea Tim Monahan Bryan Reinheimer Ed Gliss.
Background Current design is not portable Uses a very large truck with approximately 30 tons of pushing power For every two feet pushed a new section.
RockSat-C 2012 SITR Full Mission Simulation Report University/Institution Team Members Date.
Soft. Eng. I, Spring 07Dr Driss Kettani, from I. Sommerville1 CSC-3324: Chapter 5 Requirements Engineering Reading: Chap. 6, 7 + annex.
Preliminary Design Review Northwest Nazarene University Advisor: Dr. Lawrence Chad Larson Ben Gordon Seth Leija David Vinson Zach Thomas Drew Johnson.
CS 545 Software Systems Design Project Presentation Format Lecture Created by Dan Benson Computer Science Lectures © D. Benson, 2002.
Team Name Conceptual Design Review University/Institution Team Members Date.
Development and Use of Architectures in System Engineering Rosalind Lewis USC-CSSE Workshop October 2007 © 2007 The Aerospace Corporation Motivated by.
Good Vibrations Conceptual Design Review University of Wyoming James Richey, Justin Thornton, Luke Voss, Jake Thatcher, Tony Allais Oct 27, 2008.
PROJECT ICARUS by Noah Michael, Student Project Manager & Dr. Nikos Mourtos, Faculty Project Manager AE 170A/B Course Instructor.
EDGE™ Project Status Update P09141 – Satellite Thermal Heater Control System Anthony Berwin (Mechanical Engineer)
Battle Damage Assessment: Space Mission Design Process Example.
2011 CoDR Team Name Conceptual Design Review University/Institution Team Members Date 1.
RockSat-C 2011 CoDR CSU RocketSat-C Conceptual Design Review Colorado State University Isaiah Franka Jordan Rath Abby Wilbourn Mike Yeager 10/1/10 1.
Payload Subsystem Integration and Testing Report Team Name 1 Team Name 2 Team Name N Universities/Institutions Team Members Date.
Conceptual Design Review Metro State College of Denver Daniel Bass, Matt Hanley
Launch Opportunities for Standardized Payloads kg The 17th Annual Small Payload Rideshare Symposium June 9-11, 2015 Johns Hopkins University Applied.
Christopher Barrett (ME) Daniel Graves (ME). Open Architecture, Open Source Unmanned Aerial Vehicle for Imaging Systems Primary Customer: ○ Currently.
BAE SYSTEMS Overview of Systems Engineering at BAE SYSTEMS & ALENIA MARCONI SYSTEMS 8/10/2015/MS By Leigh Watton Friday 27th July 2001.
(PDR ) University of Northern Colorado Nathan and Casey 11/14/08.
Critical Design Review Team Name University/Institution Team Members Date.
Software Engineering Chapter 15 Construction Leads to Initial Operational Capability Fall 2001.
MSF Requirements Envisioning Phase Planning Phase.
Command and Data Handling (C&DH)
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Space Engineering 2 © Dr. X Wu, Space Engineering 2 Lecture 1.
DINO PDR 23 October 2015 DINO Systems Team Jeff Parker Anthony Lowrey.
Section Number - 1 NASA’s Goddard Space Flight Center Communication Systems Jason A. Soloff NASA/GSFC Code 567 August 16-17, 2005.
Enterprise Systems Architectures EGN 5621 Enterprise Systems Collaboration (Professional MSEM) Fall, 2012.
03/11/021 Spaceport Vision Team Members. 03/11/022 Systems Definition Spaceport System Spaceport Stakeholder Needs High-Level Trade Study Performance.
1 JWST Functional Flow Diagrams and Schematic Block Diagrams.
Model-Based Systems Engineering on a Quick Reaction Program 20 May 2015 Charles H. Patton Engineering Manager and Systems Engineer Copyright  2015 Northrop.
Project Team: Nicholas Parrott, Erick Janampa ECE Faculty Advisor: Dr. John R. LaCourse Current Date: October 28, 2010 Project Completion Date: April,
MSD Total Supplier Performance and Inventory Control Keleigh Bicknell, William Darlington, Alex Resnick, Brian Woodard.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Judges Score Card Overview Mark Turner NASA Ames Research Center.
Apollo 50 Lunar Mission Concept Goal: Initiate a series of lunar campaign missions, inspired by Apollo 11, to explore the potential of the Moon for science.
Haripriya Head, Integration Team Pratham, IIT Bombay 19 th June, 2010.
MNROCK CONCEPTUAL DESIGN REVIEW University of Minnesota William Ung Scott Balaban Bryce Schaefer Tom Thoe 11/3/2008.
2013 CoDR Team Name Conceptual Design Review University/Institution Team Members Date 1.
Section 1: Mission Overview Mission Statement Mission Objectives Section 2: The Payload! User’s Guide Compliance Beta Prototype Testing Section 3: Check-In.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
2014 CoDR Team Name Conceptual Design Review University/Institution Team Members Date 1.
Tethered Aerostat Program Concept Design Review Team Name Conceptual Design Review University/College Team Members Date.
Adaptive Software Development Process Framework. Version / 21 / 2001Page Project Initiation 2.0 Adaptive Cycle Planning 5.0 Final Q/A and.
EDGE™ Preliminary Project Plan P09102 – METEOR Stage Separation System JJ Guerrette (ME)
Tethered Aerostat Program Concept Design Review College of Menominee Nation Conceptual Design Review College of Menominee Nation Marilyn Madosh, Larry.
TRIO-CINEMA 1 UCB, 2/08/2010 System Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
Planetary Lander PDR Team Name
Pack Level (End Item Assembly) Testing
CINEMA System Engineering
Mini-RF Requirements Overview
Peer Review Agenda (Suggested).
Project METEOR [P08102 RITSAT I]
Team Name Conceptual Design Review
Team Name Conceptual Design Review
<Project Name> Milestone Summary Report
CHANGE CONTROL PROCESS MONTH DAY, YEAR
Suggestion on your presentation of the TT&C subsystem
Presentation transcript:

TREADS Semester Review Dec. 14, 2007

Objectives Assess and Communicate Current Design Identify interfaces Approve the System Requirement Specification Formalize the design Obtain approval to purchase parts and begin assembly

Agenda Mission Concept of Operations Subsystem Briefs –Structures Design, Analysis. Vibration Analysis –Thermal Analysis –DIB/SMB –Power System Architecture, Power Budget –Communications Schedule

Mission Statement Provide mission Objectives Why are you doing this? At a high level, how will you do this. What are you major mission requirements or limitations

Falcon 1 User’s Guide, SpaceX Launch TREADS Operations (1 Year) Concept of Operations

Ground OpsS/C Ops LV Activities Launch Primary Payload Release TREADS Power On Secondary Payload Release Tertiary Payload Release Mission Start FC Boot Up System Checkout Exec. DUT Test(s) Data Downlink Charge Batteries Customer Feedback Exec. Schedule Schedule Uplink Nominal Timeline Nominal Operations First Ground Contact

System Level Review Functional Block Diagram Examples Major System level capabilities and requirements. Give enough context for the sub-system sections to make sense. Full System review at the end –Mass, Volume…..

List major requirements and capabilities. List major components. List major concerns. Sub Systems Review

Total System Level requirement Compliance Power, Mass, Volume Systems Review

Acceptable Mass Budget

Electronics Risks