Using Stress Analyzer for Tensile Testing © 2012 Project Lead The Way, Inc.Principles Of Engineering.

Slides:



Advertisements
Similar presentations
From the Box to Packing in 30 minutes Pack-in-a-Box components Remove components and assemble bracket as shown Follow the instructions to pack your first.
Advertisements

Data Projector Setting Up/Connecting Laptop & Data Projector.
Build Your Own Future RC2 Serviceability. Build Your Own Future Safety and Ground Rules Before servicing, always remove A/C power from the unit and disconnect.
MO-735 Overlock Dealer Training CLICK.
Presenting A Power Point Program. Computer Checklist Computer Checklist Power Cord Mouse Computer.
Setting Up a Tripod. Unscrew the center knob at the collapsed tripod base to loosen, and then re-tighten it once all the legs are fully extended.
Michael Long– Eagle Project - Exhibit D-1 Plans/Drawings – Top View
Assembly Manual Mike Fortney 04/09/2004 CricketSat Receiver.
Expand Media Wall & Podium Case Training Video’s & Instructions.
How to carry out experiments using MPMS March 2012 Takeshi NAKAGAWA.
AUDIO VISUAL TRAINING University Center. BLACK BOX EQUIPMENT IN CLASS University Center LCD Projector/Built In Screen Laptop Connection (VGA Cord) Control.
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Smart Cart Multimedia Lectern Technology Resource Center.
Digital StarLab Set-Up, Operation, Maintenance, and Teacher Manual for the Digital StarLab are in the links below or on the training tab in the BlackBoard.
1 Zebra 170 XiIII Plus Removing and Installing Printhead Calibrating Head Resistance Print Quality Adjustments.
5/13/ Assembling and Testing Your Robot. 5/13/2015 Mounting the Topside Hardware  Parts Boe-Bot Chassis (1) Standoffs (4) 1/4” 4-40 Screws (4)
Tutorial – “How to:” 1) Change the resolution on your display 2) Setup Multiple Displays.
Bernina 330.
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Nov. 19, 2007 Rev. B.
L.C. Technology ROBOT ASSEMBLY. Base Assembly BASE File off raised tabs on each side of Servo. Place Servo in vice between Fibre Clamps. Raised Tabs Repeat.
Assembly Manual Mike Fortney 04/02/2006 CricketSat Receiver.
Use this video to further enhance your presentation:
Wiring the Desklamp Basics of Wiring. Types of Wire For this project we will be using two types of wire: 3 wire and standard lamp wire. – 3 wire The wire.
Showing Demonstrations on the TV How to connect the camera to our TV set.
+ USING THE POWER CHARGER AND BATTERY MINI-DV CAMCORDER Connect the charger to the power cord Attach the battery to the charger Plug it in and watch for.
Pumping Up the Stress for 5 th grade. Activity Guide.
AUDIO VISUAL TRAINING Center for Academic Success.
How to Create a Mechanism in Pro Engineer 1.Start a new assembly 2.Add “Base” and make it the “Default”
Sony Handycam Instructions Directions Written By: Stephen Hall, Student Technical Assistant Ms. Miri Kim, Director of Instructional Design and Technology.
Set Up for Live Streaming Video This presentation will walk you through the set up and delivery for streaming video of a live event over the internet.
Delta Blocks Introduction (these are slides that can be projected during class and/or printed)
How To De-Wing A Weedhopper By: Mike Schweim. Remove wing ribs, starting from the wingtips;
MICROSCOPE PROCEDURES. 1. SET UP  Carry microscope with two hands  Place one hand on the base and the other hand on the arm  Place it 5 cm. from the.
Transforming Parabolas Slide 1 Begin Slideshow To Navigate the Slideshow  Use the Next and Previous arrows at the bottom of the screen to move between.
Mimio Notebook How to use a mimio Notebook in the classroom.
AUDIO VISUAL TRAINING Vaughn Eames-Lite Class. LITE CLASSROOM EQUIPMENT Lite Class LCD Projector/Built In Screen Laptop Connection (VGA Cord) Control.
How to Change Raptor Knife Blades. Step 1: Use a Phillips screwdriver to remove the 5 screws. It is not necessary to remove the lanyard/webbing to change.
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Shreveport Assembly 14 MAY, 2008.
ECS 3390University of Texas at Dallas1 Activity: Designing Assembly Instructions for a Vacuum Cleaner Click on the audio symbol below to begin.
ScanIt Software used with the Schoolnet component of Home Base.
© 2013 Eaton Corporation. All rights reserved. Installing easySoft-Basic 6.
Forging new generations of engineers. USING THE STRESS ANALYSER FOR TENSILE TESTING.
Advanced Engineering Design and Presentation “My Smart Phone” Precision Measured Drawing and 3D Model.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
1 Equilibrium The Balancing Robot By: Kerry Scharfglass Whiz Kid.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
*Plug in the CAT 5 cable to the internet drop
Bilge Pump Service Project Model Service Kit
East Cafeteria Projector
826YD 21/2”-10”.
Yeti 400 Reprogram SOP 5/1/2017, Yeti firmware rev. 2.0.
Step 1: Load paper Before you replace the ink cartridges and begin the alignment process, load paper in the printer. 1) Raise the input tray. 2) Remove.
Soxhlet Unit B Maintenance By: Shawna Brookes.
Meeting In A Box Set Up Guide
Using Stress Analyzer for Tensile Testing
Gas Laws When looking at how gas particles react in different situations, we want to look at four different variables and how they affect each other: Temperature.
Conference room user manual
Click to edit title TO ADD NEW SLIDE LAYOUTS: Make sure you have the ‘Home’ tab selected at the top of the PowerPoint screen and click the down facing.
EVENT TITLE Time, Date Location
TO ADD NEW SLIDE LAYOUTS: Make sure you have the ‘Home’ tab selected at the top of the PowerPoint screen and click the down facing arrow to the right on.
EVENT TITLE Time, Date Location
TO ADD NEW SLIDE LAYOUTS: Make sure you have the ‘Home’ tab selected at the top of the PowerPoint screen and click the down facing arrow to the right on.
TO ADD NEW SLIDE LAYOUTS: Make sure you have the ‘Home’ tab selected at the top of the PowerPoint screen and click the down facing arrow to the right on.
TO ADD NEW SLIDE LAYOUTS: Make sure you have the ‘Home’ tab selected at the top of the PowerPoint screen and click the down facing arrow to the right on.
Click to edit title TO ADD NEW SLIDE LAYOUTS: Make sure you have the ‘Home’ tab selected at the top of the PowerPoint screen and click the down facing.
TO ADD NEW SLIDE LAYOUTS: Make sure you have the ‘Home’ tab selected at the top of the PowerPoint screen and click the down facing arrow to the right on.
Click to edit title TO ADD NEW SLIDE LAYOUTS: Make sure you have the ‘Home’ tab selected at the top of the PowerPoint screen and click the down facing.
Document Camera Setup Instructions
Downloading to the NXT requires the correct hardware setup
How To Use The FD92 Digital Camera
Presentation transcript:

Using Stress Analyzer for Tensile Testing © 2012 Project Lead The Way, Inc.Principles Of Engineering

Using the Stress Analyzer for Tensile Testing 2

Plug the analyzer into a standard wall outlet. 3

Attach a laptop computer cable to the analyzer. 4

Turn on the computer and load analyzer software SSA

Turn the switch at the back of the analyzer to the ON position. 6

Use the computer to set the analyzer to the Home position. Homing the Analyzer 7

You can also use the button on the lower right side of the analyzer. The pull rod at the center of the table should move to its uppermost position. 8

Slide up the large plastic shield at the front of the analyzer. Fold it back onto the top of the analyzer. 9

Screw one end of the tensile testing sample 1/2 inch into the pull rod adapter. The pull rod adapter extends up at the center of the analyzer table. 10

Slide the round hollow tensile testing attachment down over the test sample and center it around the pull rod on the analyzer table. 11

Align the upper end of the test sample thread with the threaded hole in the attachment knob. Thread the knob about ½ inch onto the test sample. 12

Close the plastic shield on the analyzer so that the two slots shown by the red arrows are located at the bottom edge of the shield seat. The analyzer will not work if the shield is not in the down position. 13

Select the Graph icon to show the graph on the computer screen. 14

To run the analyzer, select the start button. If the sample should fail to break, the 1-inch center section of the sample must be turned down more. 15

After the sample breaks, click the Print button on the computer screen to print the graph. 16

Raise the plastic shield and remove both ends of the test sample. Repeat previous steps to test the second sample. 17