Technical Board and Safety Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.

Slides:



Advertisements
Similar presentations
Norman McCubbin1 Report from the Collaboration MICE Project Board (CMPB) Norman McCubbin Director, Particle Physics Department MICE Funding Agencies Committee.
Advertisements

1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
MICE Superconducting Solenoids: Status and Update RAL: T W Bradshaw M Courthold J Rochford M Hills D Baynham Oxford: J Cobb W Lau S Yang MICE.
June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry.
RFCC Module Update Derun Li Center for Beam Physics LBNL, Berkeley, CA MICO Weekly Phone Meeting March 21, 2011.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
Spectrometer Solenoid Report and Coupling Coil Update Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory.
Cooling Channel Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICE Collaboration.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
Global Magnet Systems including Field Mapping MICE Project Board 28 th June 2011 M Courthold – RAL R Preece - RAL.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
paul drumm; 3rd December 2004; AFC MM 1 Cost & Schedule Review I Terms of reference: –To review the Cost and schedule of the MICE Muon beam –To review.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
1 MICE Project Board Schedule and milestones Reconstructing the schedule Present status Monitoring and feedback Key schedule drivers and concerns Andy.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
RFCC Module Tech Board Schedule Discussion Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 4, 2009.
MICE Spectrometer Solenoid Design and Fabrication Update Mike Green and Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference December.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
Spectrometer Solenoid Tech Board Schedule Discussion
MICE Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
1 TB/Safety Summary Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
Spectrometer Solenoid Update Steve Gourlay Steve Virostek Lawrence Berkeley National Lab Steve Gourlay Steve Virostek Lawrence Berkeley National Lab MICE.
RF Cavity / Coupling Coil Module
MICE VIDEO Conference 17 th December 2003 Report on AFCSWG Safety Review -- Future Plan By Wing Lau -- Oxford.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Overview and status of international systems Reminder of the principal deliverables Status reports on: Spectrometer solenoids Radio Frequency Coupling.
Infrastructure Update As at 11 th March 2009 Remaining four plates now fitted to North shield wall North & South walls and all galleries are considered.
1 MICE PM Report Completion of Infrastructure Target, solenoids Phase Two planning & schedule Non-MICE costs Staffing & visitors Don’t have time for a.
MICE Coupling Coil Update Steve Virostek for Allan DeMello Lawrence Berkeley National Laboratory MICO January 23, 2013 January 23, 2013.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
March 4, 2011Outlook and Guidance - Zisman1 MAP Outlook and Guidance Michael S. Zisman* Center for Beam Physics Accelerator & Fusion Research Division.
MICE CM Alain Blondel 1   MICE GOALS OF THE MEETING Welcome to MICE CM29.
Some Thoughts on Magnetic Measurements for MICE Michael A. Green Lawrence Berkeley Laboratory Berkeley CA 94720, USA.
Abstract: The Muon Ionization Cooling Experiment (MICE) is an international effort sited at Rutherford Appleton Laboratory, which will demonstrate ionization.
Spectrometer Solenoid Overview Roy Preece 31 st January 2011.
1 MICE Collaboration meeting at Berkeley 9 – 12 February 2005 Integrated Design & Safety Review Presented by Wing Lau & Paul Drumm.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #28 Sofia, Bulgaria.
MICE VC Alain Blondel 1 MICE NEWS MICE VC 161 Agenda Overall schedule Magnetic field mitigation review Status of things.
MICE CM 29 Collaboration Board Summary. Agenda 1.Intro 2.Approval of minutesBooth/Bross 3.Spokeʼs remarks & EB reportBlondel 4.PM reportNichols 5.US magnet.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
1 Engineering Session Summary Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
MICE RF Coupling Coil Magnets Update Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory October 6, 2010 Sofia, Bulgaria.
MICE Funding Update (U.S.) Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory CMPB Meeting August 1, 2007.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
MICE – Video conference Alain Blondel, 17 December   MICE selected NEWS: Future meetings Safety review Study of controls Gateway I & Toward Gateway.
MICE CM23 Introduction and Meeting Goals Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Progress on MICE RFCC Module for the MICE Experiment * Allan DeMello, Nord Andresen, Michael Green, Derun Li, Heng Pan, Steve Virostek, Michael Zisman.
Malcolm Ellis – Brunel University – 8th April The International Muon Ionization Cooling Experiment.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
Fernanda G. Garcia, Steve Dixon, Andy Stefanik, Justin Tillman, John Voirin SBN Far Detector Installation & Integration.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Spectrometer Solenoid Documents and Review Plans Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National.
CERN Steve Kettell DUNE Collaboration Meeting January 12, 2016.
Spectrometer Solenoid Update
MICE CM31 Schedule summary
Spectrometer Solenoid Fabrication Status and Schedule
Presentation transcript:

Technical Board and Safety Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICE Collaboration Meeting-Harbin January 17, 2009

Tech Board & Safety Summary: Zisman2 Safety (1) High-level MICE-ISIS Safety Committee meets regularly —a policy forum, not for detailed safety issues Two recent accidents, one causing lost time, have put us “on the radar” with the RAL safety group —this is not a good place to be MICE was asked to appoint a Safety Committee —AN, with EB concurrence, chose to use Technical Board for this purpose o augmented by a few key people –John Alexander (DL; PPS) –Willie Spensley (MERIT; CDM Principal Contractor) –Mike Courthold (RAL; cryogenics) –Matt Dickson (STFC Health & Safety) Initial task is to review PPS functionality

January 17, 2009Tech Board & Safety Summary: Zisman3 Safety (2) Information on safety-related aspects of all MICE equipment must be conveyed to Andy Nichols for Safety Committee discussion —need early indication of risks, hazards, and planned operating procedures to permit risk assessments o most proposals can be made acceptable with proper planning CDM regime will continue throughout most of MICE duration —Phase 2 equipment may need specialist review o TB will coordinate this

January 17, 2009Tech Board & Safety Summary: Zisman4 Technical Board Met on Wednesday afternoon —discussion topics o Spectrometer Solenoid status o Summary of Coupling Coil review o EMR electronics purchase o Integration task o Review status o Phase 2 schedule and cost-to-complete

January 17, 2009Tech Board & Safety Summary: Zisman5 Spectrometer Solenoid Plans are acceptable —expect first device to ship at end of February o second one 2-3 months later Magnet 2 cold mass assembly Magnet 1 being disassembled

January 17, 2009Tech Board & Safety Summary: Zisman6 Coupling Coil Review team included outside reviewers —Alan Bross (FNAL, Chair) —Mike Green (LBNL) —Vladimir Kashikhin (Fermilab) —Wing Lau (U. Oxford) —Derun Li (LBNL) —Steve Virostek (LBNL) —Zian Zhu (IHEP) —Mike Zisman (LBNL) Review went well —technical issues are in excellent shape —manpower situation is still not comfortable —some “cash flow” problems at HIT that were slowing down ordering o schedule shown deemed likely optimistic (11/09) –and has already slipped a bit

January 17, 2009Tech Board & Safety Summary: Zisman7 EMR Electronics U. Geneva asked permission to order some electronics in advance of commitment from INFN to build the device —conclusion was to approve purchase o EMR design is deemed as correct one, and we will proceed with it one way or another…even if INFN cannot fund it

January 17, 2009Tech Board & Safety Summary: Zisman8 Integration Task Scheme developed (Lau) for cooling channel seems to be effective —at present, there is no corresponding integration effort for the detectors —recommend that Lau continue identifying and monitoring integration issues for detector area o in effect, manage integration at Level 1, not Level 2

January 17, 2009Tech Board & Safety Summary: Zisman9 Review Status Two reviews identified as being ready to organize —software and DAQ Both have been slow to happen —will ask Rose Hayes to contact reviewers to try to set up dates for these reviews ASAP Tech Board needs to be more proactive in reviewing key aspects of the project —what level of review should depend on the system being considered and its technical and cost risks to MICE o one size does not fit all!

January 17, 2009Tech Board & Safety Summary: Zisman10 Phase 2 Update Agreed with need to update cost-to-complete and schedule —need to create mechanism for doing this and updating it periodically o process was initiated more than a year ago, but went idle due to other pressing issues —may also need to prioritize tasks in view of limited time, funding and intellectual resources

January 17, 2009Tech Board & Safety Summary: Zisman11 Final Remarks Focus on safety aspects is necessary and important —using Tech Board for this process will be an efficient way to proceed It is important that the Tech Board be involved in discussing and approving technical decisions of MICE —we must not let urgency serve as an excuse to bypass this mechanism o for example, target issues and decay solenoid repair plans need to be discussed and approved in this forum