André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.

Slides:



Advertisements
Similar presentations
The Detector Control System – FERO related issues
Advertisements

André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
P.C. Burkimsher Alice DCS Workshop 18 March 2002 (Updated 27 March 2003) PVSS - How to get started Paul Burkimsher IT Division COntrols Group Support Services.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
Slide 117 th DCS Workshop – October, 10Francesca Poggio ZDC DCS Status Report Francesca Poggio Università degli Studi di Torino INFN, sezione di Torino.
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans.
André Augustinus 16 June 2003 DCS Workshop Safety.
Forward Detector Meeting, 11 Mar 2003Børge Svane Nielsen, NBI1 Si-FMD status Forward Detector meeting, CERN, 11 March 2003 Børge Svane Nielsen Niels Bohr.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
1 Responsibilities & Cost ALICE DCS Review 14 Nov 05 For the DCS Team L.Jirden.
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
Marc R. StockmeierDCS, KIP ALICE WEEK FALL 2003 TRD DCS Status ● DCS-board status ● Poweresupply ●
Robert Gomez-Reino on behalf of PH-CMD CERN group.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
09/11/20061 Detector Control Systems A software implementation: Cern Framework + PVSS Niccolo’ Moggi and Stefano Zucchelli University and INFN Bologna.
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
9th September 2001R. BARILLERE - IT-CO1 Industrial and Custom Front-End solutions for Process Controls.
André Augustinus 10 September 2001 Common Applications to Prototype A two way learning process.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
June 14, 2005 Alice DCS workshop, Utrecht S.Popescu Guidelines and conventions for ALICE PVSSII control software Graphical User Interface Naming and Numbering.
15/12/10FV 1 Common DCS hardware. General ideas Centralized system: o Common computers. Detector dedicated computers (with detector participation) only.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
1 Status and Plans DCS workshop L.Jirdén u Budget u Status u Planning u Goals for end 2002.
1 Responsibilities & Planning DCS WS L.Jirdén.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
André Augustinus 13 June 2005 Control through serial links RS232 etc.
André Augustinus 10 October 2005 ALICE Detector Control Status Report A. Augustinus, P. Chochula, G. De Cataldo, L. Jirdén, S. Popescu the DCS team, ALICE.
André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén.
The Scheme of Slow Control System in BESIII Xie Xiaoxi Gao Cuishan
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
André Augustinus OPC news, versions to use on behalf of Sorina Popescu.
Controls EN-ICE Finite States Machines An introduction Marco Boccioli FSM model(s) of detector control 26 th April 2011.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
André Augustinus 16 September 2002 PVSS & Framework How to get started.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
JCOP/DCS Plans for HW Upgrade A. Augustinus (ALICE), C
October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
André Augustinus 21 June 2004 DCS Workshop Follow-up from last workshop.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
DCS Workshop 17 June 2002 PHOS DCS status Serguei Sadovski.
André Augustinus 16 September 2002 Muon tracker URD summary or, what we understand from the URD.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
13-Mar-061 ACORDE DCS ACORDE GROUP CINVESTAV, ICN-UNAM, MICHOACAN. PUEBLA México.
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
The DCS Databases Peter Chochula. 31/05/2005Peter Chochula 2 Outline PVSS basics (boring topic but useful if one wants to understand the DCS data flow)
1 Radiation worries in the cavern L.Jirdén
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
André Augustinus 16 June 2003 DCS Workshop Detector DCS status Overview and news.
MCH(Muon Tracking) DCS Introduction Overview drawing High Voltage - hardware functional diagram Logical Diagrams Summary table of states and commands Commands.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
1 COSTING DCS WS L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
Alice TPC DCS.
TPC Detector Control System
Presentation transcript:

André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction

André Augustinus 10 March 2003DCS Workshop 2 Motivation  Capture the current state of knowledge on your controls layout Also triggered by “installation review”  Concentrate on the hardware layout of your control system  Get an idea on what, where, how many Radiation and accessibility for equipment in the cavern  See Robert’s talk this afternoon

André Augustinus 10 March 2003DCS Workshop 3 Method  Provided you with a drawing showing our knowledge (TDR, URD, presentations, discussions)  Appended a list of questions  Requested you to show today an update of the drawing and answers to the questions  Example for muon tracker

Detector CAEN ? PVSS II Detector Wiener PCI-CAN Wiener OPCserver Ethernet Database(s) OPC client DIM client ? Detector ?128 High VoltageLow VoltageEnvironment monitor PVSS II OPC client PVSS II OPC client ? ? OPCserver PVSS II OPC client User interface PVSS II Schneider OPCserver Gas system PLC ELMB Gas E C P EC HV LV Muon-Trk Control room (ACR) [FSM?] I/O device (PLC,Wago,ELMB?) ? PCI-CAN Wiener OPCserver PVSS II OPC client C VME (wiener?) 1 Crate Control 1 Geometry monitor DIMserver (?) ?? Geometry Air/Water cooling PLC(?) OPC/DIM Server (?) ? Detector Cooling ? E Detector ? ? 07/03/03 PCI-CAN Switch HV 444? C CAEN OPC Crocus 20 DDL

André Augustinus 10 March 2003DCS Workshop 5 CAEN OPCserver PVSS II Wiener OPCserver Ethernet User interface Database(s) OPC client DIM client PVSS II Schneider OPCserver PVSS II OPC client PVSS II OPC client [FSM?] DIMserver This depicts a task on one or more PC’s, there is no one-to- one correspondence between boxes and PC’s User interface; main console for detector operation Main PVSS tasks; interface to field layer, Finite State Machine, … Database tasks (reading and writing). Field and process layer, with their processes “Generic” architecture for the DCS “back end”

Detector CAEN ? PVSS II Detector Wiener PCI-CAN Wiener OPCserver Ethernet Database(s) OPC client DIM client ? Detector ?128 High VoltageLow VoltageEnvironment monitor PVSS II OPC client PVSS II OPC client ? ? OPCserver PVSS II OPC client User interface PVSS II Schneider OPCserver Gas system PLC ELMB Gas E C P EC HV LV Muon-Trk Control room (ACR) [FSM?] I/O device (PLC,Wago,ELMB?) ? PCI-CAN Wiener OPCserver PVSS II OPC client C VME (wiener?) 1 Crate Control 1 Geometry monitor DIMserver (?) ?? Geometry Air/Water cooling PLC(?) OPC/DIM Server (?) ? Detector Cooling ? E Detector ? ? 07/03/03 PCI-CAN Switch HV 444? C CAEN OPC Crocus 20 DDL

André Augustinus 10 March 2003DCS Workshop 7 E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ XYZ OPCserver PVSS II OPC client The interface to the equipment (e.g. CAN or Profibus interface). [ethernet interfaces are not indicated] The software interface to the equipment (e.g. commercial OPC server) The software interface at the client side (e.g. OPC client in PVSSII) This depicts a task on a PC, each box does not necessarily correspond to a single PC ISEG 1 This depicts equipment to be controlled. This indicates the number of units (usually crates) This depicts the communication media or type of cable (see table) C 3 This indicates the number of busses or cables Alice Control Room (ACR) Counting Rooms in PX25 (CR1 – CR4) and Plug Cavern, outside L3 magnet Cavern, inside L3 magnet Areas at ALICE Detector HV This depicts the cable from the equipment to the hardware (see table) 3 This indicates the number of cables or channels This depicts the hardware connected Explanation of the detector drawings, field and process layer

André Augustinus 10 March 2003DCS Workshop 8 Final remarks  The information presented today should be reflected in your URD’s  Please send me a copy of your slides