Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting 14-16 March 2005 Thermal-Vacuum Testing LAT Environmental Test.

Slides:



Advertisements
Similar presentations
ISIM Integration & Test Mike Drury JWST-PRES
Advertisements

Palestine TV Test Jason Link University of Hawaii ANITA Collaboration Meeting at UCI 4/7/05 – 4/9/05.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
Mech Systems Proposed EMI Modifications Marc Campell 9/2/03.
GLAST LAT ProjectLAT Mgr’s meeting July 17-18, LAT Planning Meeting Mechanical Systems Marc Campell.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy1 GLAST Large Area Telescope:
GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 1 GLAST Large Area Telescope: MGSE Status Report Eric Gawehn SU-SLAC I&T MGSE Engineer
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
GLAST LAT ProjectLAT Mgr’s Meeting LAT Planning Meeting Mechanical/Thermal Systems March 17, 2005 Marc Campell.
Page 1 GLAST LAT ProjectAugust 30, 2004 GLAST Large Area Telescope: LAT Accelerometer and Thermal Instrumentation Review Presented by Leonard Lee John.
1 GLAST LAT Arrival at Spectrum Assuming That the LAT Transport Container Arrives on Flatbed Truck Question: Can Transport Cover Support Crane Lift With.
LAT Design Integration1 GLAST LAT ProjectDecember 2003 LAT Planning Meeting December 10, 2003 Design Integration LAT Planning Meeting December 10, 2003.
GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 1 LAT Environmental Test Planning and Design Review 3-4 May 2005 LAT EGSE and.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 14 March March 2005 LAT High Bay Operations Supporting Test Events LAT.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Space Power Facility (SPF) CEV Environmental Qualification Testing DISCLAIMER: This Initial Government Concept does not represent a preferred Government.
GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 7 - Page 1 GLAST Large Area Telescope: I & T Peer.
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
GLAST LAT I&T GLAST Monthly Mission Review Nov 3, 2005 wnjohnson 1 Monthly Mission Review LAT Environmental Test Planning November 3, 2005 W Neil Johnson.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectThermal-Vacuum STE Status Review, September LAT Environmental Test Planning 7-8 September 2005 LAT Thermal-Vacuum Test Plans LAT.
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
LAT-PR Section 55-1 GLAST LAT ProjectMechanical Design Integration Peer Review, March 2003 Mechanical Design Integration Peer Review, March 2003.
LAT TVAC Test Delta-PDR1 GLAST LAT Project25 May 2005 LAT Environmental Test Planning and Design Delta-Preliminary Design Review 25 May 2005 LAT T-Vac.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Overview LAT Environmental Test.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
LAT Environmental Test PDR1 GLAST LAT Project 3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 EMI/EMC LAT Environmental Test.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT ProjectMarch 08, 2004 Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation]
RICH Installation and integration in CLAS12 October 13 th 2015 D. Orecchini, S. Tomassini 1 CLAS12 RICH- Mid Term Review.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Environmental Test MGSE Design Concepts Rev 1.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT Project Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation] –A)
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Thermal-Vacuum Test Configuration.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March.
GLAST LAT ProjectEnv Test Planning,15 March 2005 LAT System Engineering 1 LAT Thermal Vac EGSE Cabling.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Project Overview 1 Presentation 1 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review W.
CANOVATE MOBILE (CONTAINER) DATA CENTER SOLUTIONS
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
FIELDS MEP Thermal Vacuum Cycling iPER
1.3-GHz Cavity Vacuum Furnace at IB4
GLAST Large Area Telescope:
Environmental Test Planning
FIELDS SCM Thermal iPER
LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 RC1 Construction and Test Plan LARP LHC PHASE II COLL REVIEW – RC1.
LAT Requirements Verification in TVAC
Integration and Test GLAST Large Area Telescope:
Thermal Vacuum Test: Plans and Procedures
GLAST Large Area Telescope:
Integration and Test Organization Chart
Environmental Test Planning Meeting
Cryomodule Assembly Plan
Integration and Test Organization Chart
LAT Environmental Test Planning and Design Review
Introduction and Overview
Design Integration and Analysis
SNS PPU Cryomodule Instrumentation
Presentation transcript:

Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Thermal-Vacuum Testing LAT Environmental Test Planning Meeting March 2005 Thermal-Vacuum Testing Martin NordbyJack Goodman

Systems Integration2 GLAST LAT ProjectMarch 2005 Agenda 8:30 am - 9:00 am Thermal panel design (Jack Goodman) –Thermal design concepts 9:00 am - 9:15 am Thermal panel design (Martin Nordby) –Heating/cooling electrical and gas schematics –Power and feedthrough tally 9:15 am - 9:45 am EGSE cabling (Rich Bielawski) –Cabling schematic, feedthrough pin-outs –Thermal sensor cabling –Routing and wrapping 9:45 am - 10:15 am MGSE (Martin Nordby) –Chamber configuration –Support stand design concept –Cable routing and support 10:15 am - 10:30 am Thermal data acquisition (Jack Goodman, Mike Van Herpe) –Data flow –Communication between chamber DAQ and LAT EGSE 10:30 am - 11:15 am Thermal-Vacuum test sequence walk-through (Martin Nordby) 11:15 am - 12:00 pm Action Item List Status (Martin Nordby)

Systems Integration3 GLAST LAT ProjectMarch 2005 Thermal Panel Design

Systems Integration4 GLAST LAT ProjectMarch 2005 Thermal Panel Cooling Schematic Cooling circuits use boil-off LN2 system Radiator +Y/-Y circuits need to be sized for transient testing –Fast cool-down to simulate eclipse Cooling Zones Rad +Y SC -Y SC +Y Rad -Y T-Vac Chamber wall Grid Chill Bars

Systems Integration5 GLAST LAT ProjectMarch 2005 Thermal Panel Electrical Heating Schematic Each zone shown is computer controlled Radiator +Y and –Y zones are independently controlled, and need 4-5 kW total power per Radiator to provide transient test heat-up capability Heater Zones Rad +Y SC +Y ACD -Y ACD +Z ACD +Y ACD -X ACD +X SC +Z SC +Y Rad +Y

Systems Integration6 GLAST LAT ProjectMarch 2005 Heater Power Requirements and Feedthroughs

Systems Integration7 GLAST LAT ProjectMarch 2005 EGSE Cabling and Feedthroughs

Systems Integration8 GLAST LAT ProjectMarch 2005 Thermal-Vacuum Test: Test Configuration LAT on Test Stand Oriented Horizontally LAT rolls into chamber on floor Port plate for LAT elec, gas feedthroughs

Systems Integration9 GLAST LAT ProjectMarch 2005 Thermal-Vacuum Test: Test Configuration View from Inside Chamber SIIS, thermal sensor cable routing Front View with Chamber Cut Away Chamber Plan View (PDF file)PDF file

Systems Integration10 GLAST LAT ProjectMarch 2005 Thermal-Vacuum Test: MGSE Concept Extension beams double as support legs LAT on Test Stand (Horizontal Configuration) Radiators mounted to Test Stand in vertical orientation Upper extension beams are used for lifting LAT into place, then removed

Systems Integration11 GLAST LAT ProjectMarch 2005 Thermal-Vacuum Test: MGSE Concept (cont.) ACD Sink Plates on an independent support frame LAT on Test Stand (Horizontal Configuration) Possible hydraulic assist for rotating detaches for T-Vac

Systems Integration12 GLAST LAT ProjectMarch 2005 Thermal-Vacuum Test: Mechanical Issues Known issues to be worked –Trapped air volumes: contamination issue –Thermal stability of support: how level will it keep the LAT and what is requirement –Sink panel design and support: 5 ACD, 3 SC, 2 Rad Requirements list –Leveling: what is accuracy and precision needed for heat pipes; any stability req’s? –Test Stand allowed temps: temperature range that Test Stand may see –Allowed parasitic conduction and radiation to/from Test Stand and other MGSE

Systems Integration13 GLAST LAT ProjectMarch 2005 Thermal-Vacuum Test MGSE: Action Item Status T102, T114: clearances in and around T-Vac chamber and chamber dimensions –Chamber model delivered to SLAC and incorporated –Clearance evaluations are in the works T110, T130, T137, T138: define leveling requirements for heat pipes, any muon surveys; inclinometers needed? –No progress T118: MGSE temperature requirements –Agreed to keep Test Stand in a ~-10—+20 degC range –Still working details of heating/cooling/isolation needed T126: agree to structural supports of LAT in T-Vac –Test Stand provides flight-like structural and thermal interface for LAT –Eliminated all options using GPR T127: develop T-Vac STE list –Started list of MGSE, but not complete

Systems Integration14 GLAST LAT ProjectMarch 2005 Thermal Data Acquisition

Systems Integration15 GLAST LAT ProjectMarch 2005 Thermal-Vacuum Test Sequence Walk-Through Transport to Thermal-Vacuum Chamber –Open door of T-Vac chamber and set up temporary trolley supports and rails. Roll out trolley from inside T-Vac chamber –Move LAT on Test Stand in horizontal configuration on Cart to T-Vac chamber. –Lift LAT on Test Stand and set down on trolley. Secure on trolley and break rigging. –Move GN2 source and re-route hoses up onto trolley. Test Preparation –Install EGSE crates and run outside cabling from EGSE crates and chamber DAQ to chamber port plates. Make connections to outer feedthroughs. –Connect internal EGSE cabling from inner feedthroughs on port plates. –Check end-to-end continuity of all cabling and connections through to LAT EGSE crates and chamber DAQ. –Mount remainder of specialized test equipment (STE), including thermal panels. –Roll trolley into mouth of T-Vac chamber. –Plumb chiller lines from LAT manifolds through port plate feedthroughs to external chiller. Test. Leave off.

Systems Integration16 GLAST LAT ProjectMarch 2005 Thermal-Vacuum Test Sequence Walk-Through (cont. 1) Test Preparation –Connect internal EGSE cabling to LAT. –Run LAT Aliveness test. –Mount thermal instrumentation to LAT, MGSE, and inside of chamber. Connect instrumentation cabling to inner chamber port plate feedthroughs and check. –Mount ACD-XLAT and ACD-Radiator MLI blankets. –Wrap MGSE MLI blankets around Test Stand, instrumentation cabling, and to patch up blanket open regions around Radiator-Grid volume. –Run LAT LPT test. –Dress internal plumbing and electrical lines in preparation for rolling into chamber. –Roll LAT on Test Stand into T-Vac chamber. –Level Test Stand to ensure that heat pipes are within required level. –Re-check all plumbing and electrical lines in preparation for pump-down. –Connect thermal panels to cooling source and connect heaters to port plate feedthroughs. –Connect chamber test instrumentation to port plate connectors on inside of chamber. –Check chamber instrumentation and heating/cooling. Pre-T-Vac Performance Testing –Run LAT CPT test. –Run LAT SVAC and Muon Survey tests. –Turn off GN2 purge and remove purge lines from LAT and Test Stand. –Disassemble dust tent from around LAT and remove from chamber.

Systems Integration17 GLAST LAT ProjectMarch 2005 Thermal-Vacuum Test Sequence Walk-Through (cont. 2) T-Vac Test –Close T-Vac chamber door. –Pump down chamber –Bake out LAT and ground support equipment (GSE) inside chamber. –Hot survival: Turn-On, Aliveness tests. –Thermal-balance hot: TCS Perf, LPT tests. –Cold-survival: Heater Check test, LAT Turn-On, LAT Aliveness tests. –Thermal-balance cold: TCS Perf, LPT tests. –Thermal cycle hot (1): CPT test. –Thermal cycle cold (1): CPT test. –Thermal cycle hot (2): LPT test. –Hot plateau: Muon survey. –Thermal cycle cold (2): LPT test. –Cold plateau: Muon survey. –Thermal cycle hot (3): LPT test. –Thermal cycle cold (3): LPT test. –Thermal cycle hot (4): CPT test. –Thermal cycle cold (4): CPT test. –Return to ambient temperature –Vent chamber. –Open T-Vac chamber door. –Run CPT test. –Run LAT SVAC and Muon Survey tests.

Systems Integration18 GLAST LAT ProjectMarch 2005 Thermal-Vacuum Test Sequence Walk-Through (cont. 3) Transport from T-Vac Test –Re-assemble dust tent around LAT. –Re-connect purge lines to LAT and Test Stand. Turn on GN2 purge. –Drain and disconnect chamber thermal panels from chiller lines. Remove panels. –Remove ACD-XLAT and ACD-Radiator MLI blankets. –Disconnect test instrumentation. –Disconnect LAT EGSE cabling from port plate feedthroughs. –Disconnect fly-away and other thermal instrumentation from LAT, Test Stand, and Chamber. Remove. –Drain and disconnect auxiliary cooling lines from Chill Bars and X-LAT Plate. –Roll LAT on T-Vac Test Stand out of chamber. –Lift LAT on Test Stand off trolley. Set down on Cart and secure. –Move GN2 source and re-route hoses down onto Cart. –Move LAT on Test Stand back to High Bay.

Systems Integration19 GLAST LAT ProjectMarch 2005 Action Item List Status

Systems Integration20 GLAST LAT ProjectMarch 2005

Systems Integration21 GLAST LAT ProjectMarch 2005