1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)

Slides:



Advertisements
Similar presentations
M. Ross Project Advisory Committee Review 13 December, 2012 KEK Main Linac Layout – Two variants for two different types of sites GDE PAC Review.
Advertisements

Nov. 17, 2008 ILC08 Global Design Effort 1 Americas KlyCluster Cost Analysis Overview Tom Lackowski RF & Sum reported by Peter H. Garbincius.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas Tunnel Life Safety and Egress Accelerator.
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
Global Design Effort U.S. ILC Cost Translation R. Stanek, et al. Vic Kuchler 1/26/07.
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
CLIC Cost & Schedule WG: mandate, organization, activities 2009 Ph. Lebrun CERN, Geneva, Switzerland TILC’09 Tsukuba, Japan.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Positron Source Relocation 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update November.
Sendai, March 3, 2008 TILC08 · GDE Meeting Global Design Effort 1 TILC08 · GDE Meeting on International Linear Collider · Tohoku University Sendai · Japan.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Sept., 2007 European CF&S Kick Off Meeting 1 Plan for a Value Engineering Study T. Lackowski.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
TILC08 - WG1 Summary Global Design Effort 1 TILC08 仙台 GDE 会議 WG-1 活動報告 GDE 活動報告会 3月11日10:00- 3号館7階会議室 設楽
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
6-10 Nov. 06 ILCWS Valencia Global Design Effort 1 RDR Management Board Overview K. Yokoya KEK.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
BAW1 RDR Confg For Mntn Rgn (S. Fukuda) 1 RDR configuration for Mountain Region S. Fukuda/KEK.
Global Design Effort - CFS ILC10 Beijing, March, Single-Tunnel Accelerator Configuration Of Asian Region Atsushi Enomoto (KEK)
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Global Design Effort - CFS Accelerator Advisory Panel Review - Oxford UK 1 ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
CLIC/ILC Collaboration: 17/05/ 08Cost/Schedule Working Group1 CLIC-ILC Collaboration - #2 Cost and Schedule working group John Carwardine, Katy Foraz,
Nick Walker for the Project Management ILC AD&I: Introduction and Overview.
20 July 2006 Vancouver GDE Meeting Global Design Effort 1 Ring to Main Linac Peter Tenenbaum SLAC.
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
Global Design Effort WG-1: Cost Reduction Studies Nick Walker John Carwardine Tetsuo Shidara.
Minimum Machine Definition: Next Steps Nick Walker AS TAG leaders meeting
Global Design Effort Working Group C Conventional Facilities Parallel Session IRENG07 V. Kuchler, A. Enomoto, J. Osborne September 19, 2007.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Date Event Global Design Effort 1 ALCPG Briefing on ILC Cost Reduction Studies Ewan Paterson Personal Views GDE May 15, 08.
Summary: Site Discussion Jonathan Dorfan SLAC Plenary Session, June 6, 2008.
Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
Minimum Machine Update Nick Walker Ewan Paterson AS TAG leaders meeting
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Conventional Facilities and Siting Global Group (ARCFS)
Preparation for DESY Meeting
CLIC Civil Engineering Update
Americas KlyCluster Cost Analysis Overview
CLIC / ILC Collaboration for CFS works
AMERICAN LINEAR COLIDER PHYSICS GROUP Impressions of the Dubna Site
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
Presentation transcript:

1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)

2 Global Design Effort TILC08 - WG1 Summary Reducing the COST

TILC08 - WG1 Summary Global Design Effort 3 TILC – Working Groups WG-1Cost Reduction Studies APPROACH –Review and evaluate RDR design –Re-visit (Caltech) cost reduction lists –Brainstorming SPECIFIC TARGETS (Cost Drivers) –Staging? / Scope? –Main Linac Technology –CDF -- Scope of halls, caverns, shafts, etc. Two vs One tunnel. Shallow vs Deep sites GOALS –Sendai – establish cost reduction goals NOTE –NO CHANGES OF PHYSICS SCOPE WITHOUT ENGAGING EXPERIMENTAL COMMUNITY B. Barish

TILC08 - WG1 Summary Global Design Effort 4 Cost Containment / Reduction Stated Priority TD Phase Goal Primary focus: CFS via –Better-defined requirements From Accelerator Designers From Technical System engineers –VALUE ENGINEERING Basic premise: –RDR design is “sound” –CFS design is conservative Premise for WG-1 –Invite new ideas, provide a forum for open discussion. –WG-1 is not a decision-making group. –No changes in scope without engaging the physics community. Iteration required

TILC08 - WG1 Summary Global Design Effort 5 Cost Reduction is Not Easy! Goal: I want to reduce RDR value by 20% –Approx: 1.3 BILCU Easy way: –Reduce length of main linacs by 40% and therefore the E cm to 300 GeV Hard way: –Find 20  1% effects or 40  0.5% effects or 200  0.1% effects The “Hard Way” is clearly more desirable –Every %-level amount will count!

TILC08 - WG1 Summary Global Design Effort 6 WG-1 Schedule

TILC08 - WG1 Summary Global Design Effort 7 Goal is to save 1.32 B out of 6.6 B = 20% where do we find it? P. Garbincius

TILC08 - WG1 Summary Global Design Effort 8 CF&S breakdown + electrical & cooling loads P. Garbincius

TILC08 - WG1 Summary Global Design Effort 9 Process for WG-1 Look for ways to reduce the cost –More than walking through each line of the cost estimate. Started with >100 suggestions from various sources –Wide range of suggestions, topic areas, and scope. –Too many for this group to evaluate quantitatively. –Many ideas not new. Different ways to group the ideas, eg: –By technical area, technical system –By topic, eg engineering integration, lattices, staging, operating margins. Four sub-groups individually considered the full list, identified their ‘top 10’ for further consideration

TILC08 - WG1 Summary Global Design Effort 10 Cost Reduction List (partial)

TILC08 - WG1 Summary Global Design Effort 11 Different ways to assess benefit / impact 1.Estimate capitol cost saving –Is this a cost reduction at all? 2.Direct physics parameter impact –Initial capability –Maximum Reach 3.Staging  SG-1 –Can impact be later mitigated with an “upgrade”? 4.Risk impact –on reaching nominal performance 5.Scope of proposed modification –Major layout change to plug-compatible component change 6.Technical systems overhead 7.Impact on operations 8.Machine reliability 9.Scope of necessary R&D programme 10.Impact on TD phase planning 11.Impact on construction schedule 12.Site dependency issues 13.Initial study effort (primary required resources)

TILC08 - WG1 Summary Global Design Effort 12 Some themes from Top-10 lists Civil, siting: –Single tunnel, shallow site,.. –Underground space utilization Accelerator –Positron source –DR short-bunch design, eliminate BC2 Engineering –HLRF: Marx, no circulators,… –Magnet stringing, power supply –Increase cooling water delta-T

TILC08 - WG1 Summary Global Design Effort 13 Site Studies (Also a cost-reduction study) Shallow site –Cut and cover + klystron gallery –Shallow tunnel + klystron gallery Single-tunnel (XFEL-like) options –An engineered / construction solution –We get this (almost) for free. Focus of JINR (Dubna) GDE Meeting (06.08) –JINR shallow-site studies –CERN (CLIC-ILC) collaboration Formally part of ILC- HIGRADE (European) programme

TILC08 - WG1 Summary Global Design Effort 14 CFS Session One - Processed Water Review of Current RDR Design Review of Current RDR Design – Three Loop System for Process Water – Two Loop System for Chilled Water Description of Two Alternative Design Solutions Description of Two Alternative Design Solutions – Use Process Water for All Cooling Requirements – Use Chilled Water for All Cooling Requirements – Several Other Ideas and Suggestions were Proposed for Continued Study as Resources Allow – Further Work is Needed to Develop an Accurate Cost Analysis of Various Alternatives Resources Available Include: Resources Available Include: – Minimal Engineering Support from FNAL – Possible Additional Support from KEK – Effort at CERN Based on Common ILC/CLIC Interest V. Kuchler

TILC08 - WG1 Summary Global Design Effort 15 CFS Session Two - Underground Volume Currently Not Optimized for Equipment Size or Layout Currently Not Optimized for Equipment Size or Layout Primary Space Requirements Determined By: Primary Space Requirements Determined By: – Cryogenic Equipment – Process Water Equipment – HVAC Equipment – Installation and Material Handling Requirements Opportunities for Cost Reduction: Opportunities for Cost Reduction: – Revised Process Cooling Design May Result in a Reduction of Equipment Space Required – Revised HVAC Design May Result in a Reduction of Equipment Space Required – Overall Optimization of Equipment layout is Essential – Adjustment of Shaft Usage and Size will Affect Cavern Space Requirements CFS Will Try to Make Some Progress on this Effort in Spite of Resource Limitations CFS Will Try to Make Some Progress on this Effort in Spite of Resource Limitations V. Kuchler

TILC08 - WG1 Summary Global Design Effort 16 CFS Session Three - Shallow Site Studies Several Variations Were Noted Several Variations Were Noted Near-Surface Solutions Include Actual Cut and Cover Excavation as well as Near Surface Tunnel Boring Techniques Near-Surface Solutions Include Actual Cut and Cover Excavation as well as Near Surface Tunnel Boring Techniques Other Aspects of General Tunnel Configuration Include: Other Aspects of General Tunnel Configuration Include: – Single Tunnel Solutions – Material Access and Life Safety Egress Impacted by Tunnel Configuration – Shaft Diameter Reduction or Further Shaft Elimination – Horizontal verses Vertical Cryomodule Installation Various Alternatives Noted May Preclude Construction in Certain Siting Locations Various Alternatives Noted May Preclude Construction in Certain Siting Locations Resources Will be Identified to Make Progress on this Topic Prior to the Dubna Meeting Resources Will be Identified to Make Progress on this Topic Prior to the Dubna Meeting V. Kuchler

TILC08 - WG1 Summary Global Design Effort 17 Next steps Follow through on the ‘Top-10’ items from this meeting –Several items need more thorough evaluation for feasibility, cost savings, risk, etc –Several items are already on the list and we need to get people working on them. Continue to solicit and evaluate new proposals. –Maintain an active list of possible cost reductions. –Distribute the outcomes from this meeting. Specific items for further study –Civil/siting: major theme of Dubna GDE meeting –Positron source integration study. –Technical systems impact of high cooling delta T. –Magnet power supply stringing and space utilization.

TILC08 - WG1 Summary Global Design Effort 18 Summary There is clearly benefit in having a forum for open discussion and evaluation of new cost reduction ideas. Open discussions with this ad hoc group were very positive. Formal engagement is also needed, eg from Technical Area Group Leaders. The real benefit will come from following through on the most interesting ideas (need people to work on them).