2nd Transnational Workshop 11th December 2009 - Thessaloniki 1.

Slides:



Advertisements
Similar presentations
State University – Higher School of Economics
Advertisements

Measuring social added value A model for public authorities
1 OUT-IN: Organising, Using and Transferring INnovation LLP-LDV/TOI/07/IT/017 DISSEMINATION AND VALORISATION PLAN First transnational workshop Manchester,
HOW TO EVALUATE A MOBILITY PROJECT Training Unit 11.1 Procedures, tools and roles for the evaluation of a mobility project.
Technical skills and competences
1 OUT-IN: Organising, Using and Transferring INnovation LLP-LDV/TOI/07/IT/017 PROJECT MONITORING PLAN AND TOOLS First transnational workshop Manchester,
FORESTUR: “Tailored training for professionals in the rural tourist sector” ES/06/B/F/PP QUALITY MANAGEMENT PLAN Valencia, November 2006.
E-OCVM (Version 2) Explained Episode 3 - CAATS II Final Dissemination Event Alistair Jackson EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
Further Education Support Service (FESS) FESS Equality Action Planning Framework: Supporting FETAC Registered Providers in Implementing Quality Assurance.
Europe and Education School Education COMENIUS. The School Education Action of the European Community’s Programme “Socrates” on Education 2 nd phase:
Identification of critical success factors for implementing NLLS, through collaboration and exchange of expertise IDENTIFY LLP-2008-RO-KA1-KA1NLLS.
ECVET WORKSHOP 2 22/23/24 November The European Quality Assurance Reference Framework.
S3 Project aim The main goal, thus expected result, of the S3 project would be to strengthen tools used for Structural Fund policies (SF), through the.
LEADER -The acronym ‘LEADER' derives from the French words "Liaison Entre Actions de Développement de l'Économique Rurale“ which means, ‘Links between.
CONTACT SEMINAR November 2008 Project management tools.
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
WAGGGS Policy & Guidelines: Adult Training, Learning and Development
The Knowledge Resources Guide The SUVOT Project Sustainable and Vocational Tourism Rimini, 20 October 2005.
Leonardo da Vinci Project BLENDED LEARNING TRANSFER Rationalising, Learning and Transferring the use of technological platforms to enterprise-based learning.
How to make a Progress Report Activity Reporting Lead partner and partner seminar Voss, Norway June 2008 Maxi Nachtigall.
DISSEMINATION AND VALORISATION PLAN Once Again-st is a dissemination and valorisation intervention Dissemination implies all actions, tools and channels.
V.I.D.E.O. Video-CVto Increase and Develop Employment Opportunities THE RESEARCH ACTIVITIES OF THE V.I.D.E.O. PROJECT Marco Merlini First Transnational.
TIPEIL Transfer of an Innovative Portfolio to Evaluate Informal Learning LLP-LDV/TOI/07/IT/019 Dissemination Seminar Venue: Bidart, 20 March 2009.
CCLVET Cross Cultural Learning and Teaching in Vocational Education and Training Overview LEONARDO DA VINCI Transfer of Innovation AGREEMENT NUMBER – LLP-LDV-TOI-08-AT-0021.
Evaluation methods and tools (Focus on delivery mechanism) Jela Tvrdonova, 2014.
Common framework Guidelines for Pilot Actions Debrecen 2013 Municipality of Debrecen Department of Sociology University of Debrecen External expert.
Marina Signore Head of Service “Audit for Quality Istat Assessing Quality through Auditing and Self-Assessment Signore M., Carbini R., D’Orazio M., Brancato.
APPLICATION FORM OF ROBINWOOD SUBPROJECT SECOND STEP 1. The short listed Local Beneficiaries work together to create international partnerships and prepare.
1 WERT: WP 5 RG EVANS ASSOCIATES November 2010 Aim To pilot and evaluate the content and context of the course material with target groups To help women.
2010/12/10 First Skills Council Meeting Brussels, April 14 th 2014 Federico Brugnoli.
Contact Seminar Leonardo da Vinci - Grundtvig november 2008 Sustainable Development Leonardo da Vinci and Grundtvig Contact Seminar « sustainable.
Quality Management (WP5) Roman CHIRCA Agency for Innovation and Technological Transfer TecTNet ………... This project has been funded with support from the.
1 Women Entrepreneurs in Rural Tourism Evaluation Indicators Bristol, November 2010 RG EVANS ASSOCIATES November 2010.
JCint - JobCreator International Network and Web Services n. LLP-LDV-TOI-09-IT-0502 This project has been funded with support from the European Commission.
What, how and when 1 2 General Aims of ‘Youth in Action Programme ’ Promote young people’s active citizenship in general and their European.
TIPEIL LLP-LDV/TOI/07/IT/019 First Transnational Workshop Athens, 7-8 February 2008 Venue: IEKEP - 34A Averof str. in Nea Ionia 1 st floor DISSEMINATION/VALORISATION.
1 OUT-IN: Organising, Using and Transferring INnovation LLP-LDV/TOI/07/IT/017 THE IDENTIFICATION OF COMPETENCIES THE PROCESS Focus Group Manchester, 14.
EEA Grants Norway Grants Annual Programme Report Template Brussels, 20 November
“ BIRD Project“ 1 Broadband Access, Innovation & Regional Development” Broadband Access, Innovation & Regional Development” Project Description Ulrich.
Expert group meeting on draft delegated act on the European code of conduct on partnership (ECCP) under cohesion policy
EDPQS in 10 minutes: Overview of European Drug Prevention Quality Standards (EDPQS) With financial support from the Drug Prevention and Information Programme.
Quality System Assessment in Italy European Curricula for Economic Animator in the Enlarging Europe – ECONOMIC ANIMATOR PT04/PP/08/36/446.
Evaluation Plan New Jobs “How to Get New Jobs? Innovative Guidance and Counselling 2 nd Meeting Liverpool | 3 – 4 February L Research Institute Roula.
1 Key elements of a good project ECVET contact seminar October 2010 Brussels LEONARDO DA VINCI.
Task NumberHarmonise, develop & implement capacity building Performance Indicators CB-07-01c Harmonise efforts by Tasks, in particular those related with.
SOSMIE – Paris 1° Transnational Workshop: 4 th – 6 th October 2012 SOSMIE EVALUATION Vincenzo Leone (TRUST)
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Antonio Mocci Mestre, January 17, 2011 Lead partner: Governance of the project monitoring, evaluation and dissemination systems.
Structuring of work related competences in Chemical Engineering STRENGTH Leonardo da Vinci ToI Project ES1-LEO RESULT 7 STRENGTH Quality.
TIPEIL LLP-LDV/TOI/07/IT/019 First Transnational Workshop Athens, 7-8 February 2008 Venue: IEKEP - 34A Averof str. in Nea Ionia 1 st floor PROJECT MONITORING.
1 The project is financed from the European Union funds within the framework of Erasmus+, Key Action 2: Cooperation for innovation and the exchange of.
Technology Needs Assessments under GEF Enabling Activities “Top Ups” UNFCCC/UNDP Expert Meeting on Methodologies for Technology Needs Assessments
FORESTUR: “Tailored training for professionals in the rural tourist sector” ES/06/B/F/PP DRAFT QUALITY & MANAGEMENT PLAN Budapest, June 2007.
EVALUATION OF THE SEE SARMa Project. Content Project management structure Internal evaluation External evaluation Evaluation report.
OpenQAsS Quality Management Evaluation Strategy Budapest – Hungary 6th-7th November István Zsíros iTStudy Hungary Ltd.
URBACT IMPLEMENTATION NETWORKS. URBACT in a nutshell  European Territorial Cooperation programme (ETC) co- financed by ERDF  All 28 Member States as.
Exploitation means to use and benefit from something. For Erasmus+ this means maximising the potential of the funded activities, so that the results are.
Project: EaP countries cooperation for promoting quality assurance in higher education Maria Stratan European Institute for Political Studies of Moldova.
Understanding DWCPs, tripartite process and role of Trade Unions How the ILO works at a national level.
Kick Off Meeting Largs, Scotland
Understanding DWCPs, tripartite process and role of Trade Unions
Measuring social added value Italian experiences
Sectoral Qualification Framework
ESSnet Projects Pascal JACQUES Unit/B5 Methodology and research
The role of the ECCP (1) The involvement of all relevant stakeholders – public authorities, economic and social partners and civil society bodies – at.
The Learning Networks under the ESF
Helene Skikos DG Education and Culture
Understanding DWCPs, tripartite process and role of Trade Unions
Understanding DWCPs, tripartite process and role of Trade Unions
Project intervention logic
Presentation transcript:

2nd Transnational Workshop 11th December Thessaloniki 1

MONITORING PLAN & TOOLS 2

Why a Monitoring Plan? Monitoring is an activity: foreseen in VIDEO work programme approved; functional to ensure the outcomes achievement, consistently with the work programme approved; useful to re-plan and re-design the actions – if the case – with respect to decisions, new occurrences, obligations and requirements. 3

Why a Monitoring Plan? The elaboration of a Monitoring Plan stems from the need to structure and organise the actions related to the implementation of Monitoring tasks. 4

Structure of the Plan The Plan has been articulates in two sections: The first section, defines the methodological framework of monitoring within the project V.I.D.E.O. The second section describes the tools to be applied. 5

Section I Monitoring framework Methodology Programme features (LLP-Leonardo da Vinci) to be considered as a general background (particularly: partnership, innovation, transfer, sustainability) The outlined background leads to consider the project as a whole and suggest to observe its entire life-cycle In line with this approach, it can be interesting to consider the reflection which is being carried out on the topic of quality and the possible application of quality issues to training processes. 6

7 Scheme – Quality Management System

The QMS model is based on four pillars: Management responsibility; Resource management; Product realisation; Measurement, analysis and improvement. 8

The model depicted below suggests the adoption of several actions, with relative expected outcomes: yearly survey by delivery via of a questionnaire; drafting of synthesis grid on the progress of each WP of the project; elaboration of fiches describing the products/results which have been implemented or are being implemented within every single WP of the project; 9

Actions Iterative activities of systematisation of data and information concerning the project; Implementation of monitoring surveys on specific themes or components of the Project. 10

The tool to carry out the survey is a questionnaire with pre-codified answers focused on the fundamental issues of a, and namely: Project redefinition or adjustments Partnership management Administrative management Objectivesn achievement/Products implementation Self-evaluation/Quality Control Dissemination 11

Reporting Further to a statistical analysis of the collected data 2 monitoring reports (1 intermediate and 1 final) will be implemented which will represent, with an additional chapter containing a synoptic and synthetic analysis of the results, the source-base for of a final internal evaluation report. 12

Typologies of Project Monitoring A)“PHYSICAL” MONITORING B) PROCESS MONITORING 13

A) “PHYSICAL” MONITORING “Physical” data of projects are basically: those concerning the contractor and the partnership members (name, typology of organisation, dimensions of the organisation, country and region, sector of intervention, number of partners and of involved countries); those concerning the financial resources by project phase and budget heading, on the whole project and in the breakdown per partner as established in the contracts; those concerning the products (product typology, medium typology, target typology, language, dimensions). 14

B) PROCESS MONITORING The basic features of the Programme are its objectives of transfer innovation and increase quality in national and European training systems and arrangements, through the implementation of actions which are based on an integration and comparison of the different national and sectoral context which are represented by partnership members. 15

B) PROCESS MONITORING The attention is therefore focused on partners’ common working paths. This is the starting point for the analysis of the qualitative aspects of the implemented process. 16

B) PROCESS MONITORING Process monitoring can therefore enrich the consciousness about the project activities with information concerning for instance:  the styles of relation, decision making and communication within the partnership;  the capacity of organisation, identification and solution of problems within the partnership;  the strategies and channels which are used for results dissemination;  the evaluation methods. 17

B) PROCESS MONITORING The related actions must not be limited to verify the variance between planned and implemented activities; they must be based on a participating and active observation of the project processes and of its results (for instance, during the partnership meetings). 18

B) PROCESS MONITORING Direct observation will be implemented by: the analysis of what the partnership has done during project meetings; the synthesis of all information gathered in direct, telephone or meeting with the projects contact persons; the utilisation of tools aimed at rebuilding the project life in its basic elements through the iterative and fixed delivery of interviews and questionnaires; the organisation of focus groups, gathering initiatives which have similar approaches for what concerns, for instance, management, processes control, production modalities or systems for evaluating results quality (especially during the second phase of project implementation). 19

B) PROCESS MONITORING Indirect observation must be aimed at: codifying and organising the information coming from what project implement in terms of results and products for each workpackage and sub- workpackage; 20

Section II Monitoring Tools The tools to collect information must be different, not only for the nature of the phenomena which are investigated but also the need to carry out the surveys in different stages. These tools should be friendly and adjustable in itinere, they must integrate closed structures to verify what exists in terms of presence/absence and quantity and open structures, aimed at highlighting the qualitative/descriptive elements of the process and the possible criticalities. Tools must be articulated in order to meet the complexity of each project and the plurality of elements which needs investigation, but nevertheless they must also be light, easy to deliver, promoters friendly and continuously adjustable. 21

To summarize… 22 ToolSampling criteria - WHEN Quality control area WHAT Observation Projects Quality Plan All projects Management Production Evaluation Indirect Structured questionnaire with pre-codified answers All project’s Management Production Evaluation Direct or by Annexe 1 Protocol for carrying out semi-structured face-to-face interviews All project’s components Management Resources Management Production Evaluation Direct To be defined Grid for meetings observationTo be adopted during the second phase Management Resources management Direct Fiche describing project processAll project’s components two times during the lifecycle of the project Management Resources Management Production Evaluation Indirect