Plans for EuCARD-2 cable manufacturing A. Kario, A. Kling, J. Brand, W. Goldacker Institute for Technical Physics, Karlsruhe Institute of Technology.

Slides:



Advertisements
Similar presentations
WP10.2 – status Reported by L. Bottura and C. Senatore Meeting at CERN, February 2 nd, 2014.
Advertisements

Bruker tape (T053) analysis for Roebel cable A.Kario, B. Ringsdorf, A. Kling, B. Runtsch, A. Jung, R. Nast, W. Goldacker (KIT, ITEP) 1.
Eucard2-WP10 Reminder of engagement of each partner Lucio Rossi WP10 coordinator.
Optimisation of Roebel cable for HTS accelerator magnets
Report from WAMHTS-2 and opportunities for HTS Naoyuki Amemiya Kyoto University 1.
Structural design of EuCARD2 magnets
Mechanical Properties of Roebel Coated Conductor Cable A.Kario 1, S. Otten 1,2, C. M. Bayer 1, M. Vojenciak 1,3, A. Kling 1, B. Ringsdorf 1, B. Runtsch.
Outline: Goals for the cable development at CERN. Main parameters of the cable. Cable development work for a cable width of 15.1 mm and for a cable width.
Roebel cable industrial optimization - General Cable Superconductors Dr Nick Long, Robinson Research Institute, Victoria University of Wellington, New.
EuCARD’13, Progress--HFM, 11 th June 2013, GdR 1 Progress in EuCARD and plans for EuCARD2 Gijs de Rijk 11 th June 2013 CERN.
Eucard WP 7.3 HFM Winding and tooling tests Insulation choice F.Rondeaux /01/2011 Dipole design review- II-8 Winding and tooling tests – insulation.
CERN/CEA Collaboration agreement No. KE2275/TE WP5 – HTS insert Kick-off meeting 07/07/2014.
EuCARD2 Magnet Status and action plan
WP10.2 – where do we stand ? L. Bottura, C. Senatore Graphics by courtesy of A. Kario, KIT.
SMC Plans for new SMCs for Fresca2 program J.C. Perez EUCARD-WP7-HFM Short Model Coil review 12 December 2011.
FReSCa2 Technical Review, 9 th June 2015, CEA Saclay FReSCa2 Technical Review June 2015 CEA Saclay J.C Perez on behalf of Fresca2 collaboration team.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 WP-10 Status.
CERN Accelerator School, Erice 2013 Tiepida-2 case-study 3: High field – large aperture magnet for a cable facility TiEpIdA2 design team: I. Mondino: Project.
Properties of HTS-Roebel cables and the approach for EuCARD-2
Eucard-WP7-HFM 9 th Collaboration Meeting at Warsaw University of Technology Status on SMC & RMC Models J.C Perez on behalf of SMC collaboration team.
WP6: HIGH FIELD STUDIES The work package deals with 20 T field accelerator-type configurations and its consequences on mechanics and materials: The purpose.
Superferric CEA. CEA is involved in the FAIR/GSI project: Responsible for the conceptual design preparation and technical follow-up of 24 superferric.
G.A.Kirby 4th Nov.08 High Field Magnet Fresca 2 Introduction Existing strand designs, PIT and OST’s RRP are being used in the conceptual designs for two.
Outline: Main characteristics of the FRESCA2 cable Main characteristics of the strand Strand stability, an issue to avoid magnet quench at low field Procurement.
GROUP C – Case study no.4 Dr. Nadezda BAGRETS (Karlsruhe Institute of Technology) Dr. Andrea CORNACCHINI (CERN EN Dept.) Mr. Miguel FERNANDES (CERN BE.
HFM-EuCARD, GdR, 14 October EuCARD magnet development Gijs de Rijk CERN EUCARD - HE-LHC'10 ACCNET MINI-WORKSHOP ON A “HIGH-ENERGY LHC” Malta,
Task 5: High-Tc Superconducting Link Status Update Meeting Eucard - WP7 Collaboration Meeting (video) A. Ballarino, G. Hurte, G. Willering (CERN) M. Tropeano,
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
AccNet-HE, , Magnet R&D Eu, GdR Joint Snowmass-EuCARD/AccNet-HiLumi LHC meeting 'Frontier Capabilities for Hadron Colliders 2013’ February.
Eucard2 – WP10 Future Magnets Philippe Fazilleau & Lucio Rossi WP10 kick off meeting CERN, 14 June 2013.
CERN/CEA Collaboration agreement No. KE2275/TE WP4 – Nb 3 Sn technology development Meeting 04/09/2015.
Outline: Strand R&D and strand procurement and inventory. Main parameters of the cable without a core. Results obtained during the cable development without.
FRESCA2 Technical Meeting 5-Validation of coil winding with Cu coils Françoise Rondeaux 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical.
A. BallarinoEucard, 8 th WP7 HFM Annual MeetingWarsaw,24/04/2012 High-Tc Superconducting Link Status of Task 7.5 Eucard 2012, 8 th WP7 HFM Collaboration.
US-side contributions to the EUCARD2 collaboration Planning video meeting May 16, 2013.
24 Th January Status of the Conductor Development Status of the manufacturing for Alstom Status of the manufacturing for SMI L. Oberli.
Fresca2 Technical meeting, 9 th june 2015, Gdr, relevance for FCC 1 Relevance of SMC/RMC/Fresca2/Inserts for FCC Gijs de Rijk 9 th June 2015 CEA Saclay.
Bi-2212 cable transverse pressure tests in Twente A. Godeke, J. Jiang, E.E. Hellstrom, D.C. Larbalestier – MS&T & ASC – NHMFL - FSU L.D. Cooley, T. Shen.
29 th September 2009 EuCARD-WP7 HFM Conductor specification and procurement Luc OBERLI CERN, TE-MSC-SCD.
CERN/CEA Collaboration agreement No. KE2275/TE WP5 – HTS insert Meeting 04/09/2015.
HTS Roebel cables for the EuCARD2 “Future Magnets”
Logo area 11 T Wire: Procurement Strategy and QA/QC B. Bordini, A. Ballarino, M. Macchini Acknowledgments: thanks to E. Charifoullina for her contribution.
Strand striation for reducing AC losses in Roebel cables: is it a viable solution? A. Kario 1, A. Kling 1, R. Nast 1, M. Vojenciak 2, A. Godfrin 1, B.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
EuCARD-WP7-HFM meeting 15 November 2011 Status of construction of FRESCA2 dummy coil assembly Attilio Milanese, Juan Carlos Perez.
Characterization of REBCO Tape and Roebel Cable at CERN
CERN Cabling Experience FRESCA 2, 11 T Dipole and MQXF A. Ballarino
EuCARD2 WP10.2 main results and open issues
L. Bottura and C. Senatore on behalf of WP10.2 February 7th, 2017
Status of RACC- Cables: Roebel Assembled Coated Conductor cable
Winding tests on Roebel cables
Lucio Rossi (CERN) WP10 coordinator
CSP 25th November 2010 Technical agreement number 3: overview
11 T cable development and procurement strategy at CERN
Bruker Energy & Supercon Technologies (BEST)
11T Dipole – Single Aperture 2m Model
J.C. Perez on behalf of SMC collaboration team J.C. Perez
CERN Conductor and Cable Development for the 11T Dipole
Roebel cables for EuCARD²: experience and options.
Plans for the PSI Canted-Dipole Program
CEA KE 2775 progress meeting WP3 – FRESCA 2 Magnet
Naoyuki Amemiya Kyoto University
Procurement of Nb3Sn strand for coils assembled at CERN
Analytical Cost Model (16 T dipole)
EuCARD2 WP 10.2 HTS Conductor
MQXF updates P. Ferracin October 9th, 2014.
Using the code QP3 to calculate quench thresholds for the MB
I ",.. ""*",.. - " _ ri11ri11 \I1 \I
Summary for Poster FIP/1-4Rb
Presentation transcript:

Plans for EuCARD-2 cable manufacturing A. Kario, A. Kling, J. Brand, W. Goldacker Institute for Technical Physics, Karlsruhe Institute of Technology

wlwl wcwc riri TpTp α W T p = 126, 226, 426 mm W = 10 mm w l = 4.7 mm w c = 4.7 mm α = 30° r i = 10 mm Roebel cable – 10 mm wide cable possible

Dummy Roebel 1 3 m long 12 mm wide Transposition length 226 mm 15 SS strands + 15 Cu strands Dummy Roebel 2 3 m long 12 mm wide Transposition length 226 mm 15 SS strands Dummy cable delivery – short samples at CERN

Dummy cable delivery – block design (CERN) Cable design: 20 m long 12 mm wide 226 transposition lenght 15 SS strands Delivered - may 2014

Dummy cable delivery – cos Ѳ (CEA) Cable design: 13 m long 10 mm wide 426 transposition lenght 15 SS strands Delivered - august 2014

Recent Roebel cable manufacturing: Transposition Lenght (mm) No. of strandsIc (self-field, LN 2 ) (A) Transposition Lenght (mm) No. of strandsIc (self-field, LN 2 ) (A)

Planns / Questions: We are ready for at least 20 m Roebel cable manufacturing - waiting for Bruker material Questions: Should we deliver cable for FRESCA test from Bruker material? Does other coated conductor Roebel cables are foreseen for FRESCA test? 9 x 200 mm for resin impregnation test (one piece-1.8 m, current lead?) 2*800 layer jump impregnation (one piece-1.6 m) 1*1000 mm normal zone propagation (who?, where?) 1*6000 mm dummy (TL 226, 15 strands)-Feather-M0 ok!