Design Proposal A document prepared to (a) justify the need for the project, (b) describe the engineering process to be taken, (c) outline the expected.

Slides:



Advertisements
Similar presentations
Project Management.
Advertisements

Project management Information systems for management1 Project Management.
What is an M and E Plan?. Organizing the Work of M and E An M and E System -- the 12 components as a whole – Sets out broad vision at national level An.
BIS310: Week 4 BIS310: Structured Analysis and Design Feasibility Study and Business Requirements Statement -Selecting the Best Alternative Design Strategies.
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
Chapter 3 Managing the Information Systems Project
© 2005 by Prentice Hall Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F.
© 2008 by Prentice Hall 3-1 ITCS311 Systems Analysis and Design Dr. Taher Homeed Feb 2010 Department of Computer Science College of IT University of Bahrain.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Project Management: A Managerial Approach
Project management Project manager must;
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
2 Project Management  Management of work to develop and implement an innovation or change in an existing organization Examples: –New buildings –Weapon.
Project Management Outline of Chapters 1-6. Chapter 1 – Project Management Concepts Definition of a project and its attributes Key constraints within.
Project Planning Dr. Jane Dong Electrical and Computer Engineering.
Chapter 3 Managing the Information Systems Project
Action Implementation and Evaluation Planning Whist the intervention plan describes how the population nutrition problem for a particular target group.
The Proposal. Project Proposals Genesis of Proposals: They can result for formal requests (e.g. Request For Proposal, RFP) They can be unsolicited (e.g.
Fundamentals of Information Systems, Second Edition
© 2008 by Prentice Hall 1 Chapter 2. © 2008 by Prentice Hall 2 Project – a planned undertaking of related activities to reach an objective that has a.
Jump to first page 30/06/ Chapter 1 System Development Environment.
Project Tracking and Scheduling Infsy 570 Dr. R. Ocker.
Development plan and quality plan for your Project
Project Management and Scheduling
Proposed MITHI Concept Paper
What is Business Analysis Planning & Monitoring?
The Software Development Cycle Defining and understanding the problem.
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
Chapter 3 : Managing the Information Systems Project.
© 2005 by Prentice Hall 3-1 Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition.
Computers Are Your Future Eleventh Edition Chapter 13: Systems Analysis & Design Copyright © 2011 Pearson Education, Inc. Publishing as Prentice Hall1.
Module 6 Session 6.1 Visual 1 Module 6 Preparing the Work Breakdown Structure (WBS), Responsibility Matrix, and Master Summary Schedule Session 6.1 Preparing.
Appendix A Project Management: Process, Techniques, and Tools.
Planning the project Project Management (lecture).
Software Project Management Lecture # 7. Outline Project Scheduling.
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
Slide 1 Project Management Chapter 4. Slide 2 Objectives ■ Become familiar with estimation. ■ Be able to create a project workplan. ■ Become familiar.
Welcome to Session 3 – Project Management Process Overview
Computers Are Your Future Tenth Edition Chapter 13: Systems Analysis & Design Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall1.
© 2014 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected by Copyright and written permission should be obtained.
Request for Proposal (RFP)
IFS310: Module 7 Business Requirements Statement Interpersonal Skills and Communications.
Chapter 3 Managing the Information Systems Project
Project Management Organization Scheduling 31 January.
Project Proposal ELEC 421 The initial document that converts an idea into details of a potential project, including the outcomes, outputs, major risks,
Final Year Project 1 (FYP 1) CHAPTER 1 : INTRODUCTION
SCOPE DEFINITION,VERIFICATION AND CONTROL Ashima Wadhwa.
Slide 1 Critical Success Factor : Project Management Project Management is the process of _______ the development of a system with a specified _____ frame.
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
How to Write a Project Proposal Specialization Introductory Module Thursday, May 9, 2013 Barbados.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
Request for Proposal (RFP) In response to the RFP – the first step is to prepare a proposal 1. Review Customer Requirements and come up with candidate.
HCIS 410 Read, Lead, Succeed/Uophelpdotcom For more course tutorials visit
Lecture 3 Part 1 Managing the Information Systems Project.
CIS 170 MART Teaching Effectively/cis170mart.com FOR MORE CLASSES VISIT HCIS 410 AID Inspiring Minds/hcis410aid.com FOR MORE CLASSES.
Prof. Shrikant M. Harle.  The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.  Regardless.
Principal Investigator ESTCP Selection Meeting
Chapter 3 Managing the Information Systems Project
Managing the Information Systems Project
Chapter 1 The Systems Development Environment
Object-Oriented Software Engineering Using UML, Patterns, and Java,
Principal Investigator ESTCP Selection Meeting
Business System Development
Chapter 1 The Systems Development Environment
Chapter 3 Managing the Information Systems Project
INF 342 Enthusiastic Study/snaptutorial.com
Request for Proposal (RFP)
Principal Investigator ESTCP Selection Meeting
Chapter 1 The Systems Development Environment
Principal Investigator ESTCP Selection Meeting
Presentation transcript:

Design Proposal A document prepared to (a) justify the need for the project, (b) describe the engineering process to be taken, (c) outline the expected results, and (c) estimate and justify the cost.  A detailed plan of the project usually for the purpose of justifying/requesting substantial investment of time, effort, and resources A formal design proposal should include the following five components: –Objective (why?) –Background/Introduction (who? Where?) –Methodology (how? When?) –Expected results (what?) –Costs (how much?) Reference: Engineering by Design, by G. Voland, chapter 2.5

Proposal (cont.) Objective: A concrete statement describing what the project is trying to achieve and why. The objective should be written such that it can be assessed at the conclusion of a project. A well-posed objective has been commonly described to possess the following characteristics: Specific, Measurable, Achievable, Realistic and Time framed (SMART). Background: who will be served (clients, users), where the products will be used (environment, special conditions). Also include existing solutions, prior work demonstrating a broad understanding of the project. Methodology: state how the project will be tackled with detailed description of the engineering process to be taken.

Proposal (cont.) Methodology (cont.): Tasks and responsible persons should be identified. An important element will be a detailed schedule for the expected completion of these tasks. The most widely used schedule is the Gantt chart (a graphical representation for easy reading). (read Chapter 7 of textbook for more information)Gantt chart –Terminology: Work Breakdown Structure (WBS) is a grouped list of tasks with an estimate of efforts and resources required to complete the task.Work Breakdown Structure (Critical Path Method) (CPM) (Critical Path Method) (CPM) is another useful tool to indicate time schedule. It has the advantage to identify more clearly tasks with different priorities for decision making. Indication of sequential and/or parallel relationship between tasks.

Proposal (cont.) Expected Results: expected outcomes and what types of deliverables should be described. Both risks and benefits involved should be discussed. Costs: estimated how much will the project cost (the bottom line of a business decision): money, time, labor, materials, facilities, all other economical factors.

Assignment 2, due Feb. 4 (Wednesday) Prepare a design proposal for the design project your team chooses (a senior capstone project, or a class project, or a project of interest)senior capstone project Your team has to turn in the description of the project chosen by Jan 28 (no longer than one page). Include all five components discussed in your proposal. Note: A description/discussion is needed for each of the five sections indicating how do you implement these concepts (perform a self-analysis in the appendix at the end of your proposal). For example, specify why your objective has satisfied the SMART characteristics. Your grade will also be dependent on how thoroughly you describe your tasks.