RISK AWARE TITLE : RISK – Advanced Weather forecast system to Advise on Risk Events and management ACRONYM : RISK AWARE Duration: 36 months Status: Running.

Slides:



Advertisements
Similar presentations
Hydrometerological issues in South Eastern Europe South Eastern Europe Disaster Risk Mitigation and Adaption Programme (SEE DRMAP) Vlasta Tutis, PhD Meteorological.
Advertisements

ESF ACROSS BORDERS: ENGAGING THE REGIONS Action Plan to support to transnational and interregional cooperation at EU level Gerhard Bräunling.
Confernece on transport, energy and environmental issues Dr. Gerhard Kuschnig, Vienna Waterworks Dr. Slobodan Miko, Croatian Geological Survey Vienna/
WMO’s Activities in Disaster Risk Reduction
UPGRADE BS-SCENE Up-Grade Black Sea scientific network (INFRA) ENVIROGRIDS Building Capacity for a Black Sea Catchment Observation and Assessment (Environment)
CIRAS PROJECT OVERVIEW
PROFORCE Bridging of Probabilistic Forecasts and Civil Protection Yong Wang, Clemens Wastl, Franziska Strauss (ZAMG)
Adriatic MoS The MED-PCS project July 15, Rome PROMOTION OF "PORT COMMUNITY SYSTEM" IN MEDITERRANEAN TRAFFIC Vittorio Marzano Assistant professor.
WETHYDRO Centre of Excellence in Wetland Hydrology Contract number: EVK1-CT Duration: Coordinator: prof. Stefan Ignar Department of.
“Building Effective Public Participation in Environmental Impact Assessment in a Transboundary Context” in Bulgaria Institute for Ecological Modernisation.
European COastal-shelf sea OPerational monitoring and forecasting system ECOOP.
Antonia P. Recchia Ministry of Cultural Heritage and Activity Objectives of ERA-NET for coordination of European Research on Cultural Heritage 8 th EC.
URBACT III LAUNCH EVENT Brussels, 16 March The URBACT III programme  Objectives & Activities  Thematic coverage  3 Types of network  Beneficiaries.
Headquaters Kick-Off Meeting Brussels 17 January 2013 Aware and Resilient Project overview – Austrian Red Cross.
MED PROGRAMME main thematic priorities and opportunities.
URBACT II Promoting Integrated & Sustainable Urban Development.
The URBACT II Programme General Presentation Vilnius, 20 January 2011.
Conference on the European Union Startegy for the Danue Region: transport, energy and environmental issues Vienna and Bratislava, April, 2010 Dr.
Name Speaker This work is part of the Joint Action on Improving Quality in HIV Prevention (Quality Action), which has received funding from the European.
IT2-GRU Brussels – 27 October 2008 Makno Managing knowledge in intercultural learning communities Ma.Kno. is funded by: EU Lifelong Learning.
Serving society Stimulating innovation Supporting legislation The Global Flood Partnership bridging the gaps from science to operations.
EuropeAid Development and Co-operation Eastern Partnership Flagship Initiative: Programme for the Prevention, Preparedness and Response to Man-Made and.
1 LEADER and TNC implementation including aspect of networking Kasia Panfil, ENRD Contact Point 25 May 2012, Lithuania.
This Programme is funded by the European Union And implemented by a conrtium led by MWH in partnership with DEMA, CIMA Research Foundation, Austrian Red.
Presentation WG 2 Managing EU Funds on the Regional Level Republic of Albania Ministry of European Integration (MEI) Regional Conference EU Perspectives.
Rome, 15 May hrs 4th ODS3F Progress Meeting, 15 May 2014, Rome ODS3F project overview Giovanni Laneve DIAEE – Università di Roma ‘La.
EU-JordanNet Enhancement of Jordan-European S&T Partnerships To the attention of European and Jordan Institutions: Initial Training Network (ITN) PEOPLE.
Presentation of the 21 ETCF II Partnerships ETCF-II is co-funded by the European Union and the Republic of Turkey TOBB.
FORESTUR: “Tailored training for professionals in the rural tourist sector” ES/06/B/F/PP QUALITY MANAGEMENT PLAN Florence, January 2008.
1DEN/DSOE Romania september 2006 HOTLABSSA “The EU 6 th FP Support Specific Action HOTLABSSA: a new step towards an European Network on Hot Laboratories”
The GEOSS Portfolio for Science and Technology Produced by ST Featuring: Climate: Capacity Building of Operational Oceanography and Climate Adaptation.
E-CMMERCE JOBS This project (Project number: HU/01/B/F/PP ) is carried out with the financial support of the Commssion of the European Communities.
Project funded by the Future and Emerging Technologies arm of the IST Programme FET K.A. line Networks of excellence and working groups the European.
Title: Climate change impacts on Arctic economy and society Acronym: CLIMARES Coordinator: Ola M. Johannessen, Deputy Coordinator: Stein Sandven Project.
European Commission DG Enterprise VIRTUAL ENVIRONMENT FOR INNOVATION MANAGEMENT TECHNIQUES VERITE Kick-off meeting Thessaloniki November 2001.
History of the Project 1. 2 The starting point… CSA – Civil Service Apprenticeship LDV pilot project 2004 Italy, Spain, Bulgaria, Holland Tool: Excel.
Introduction of the ‘SDI-EDU for regional and urban planning‘ project Karel JANECKA 1 1 University of West Bohemia, Faculty of Applied Sciences Department.
1 LIFE+ COUNCIL WORKING GROUP 4 OCTOBER Discussion Points 1. LIFE+ in Context: Environment funding under the Financial Perspectives.
Flash Flood Forecasting as an Element of Multi-Hazard Warning Systems Wolfgang E. Grabs Chief, Water Resources Division WMO.
1 European Commission Enterprise and Industry DG Entrepreneurship and Innovation Programme Management Committee, Brussels, 26 June 2008 Public Procurement.
Jean-Michel Courades, DG AGRI F3 European Rural Development Network
Application number: 2(4.i) MIS-ETC Code: 774 EMERSYS Toward an integrated, joint cross-border detection system and harmonized rapid responses procedures.
DIS-ALP DIS-ALP D isaster I nformation S ystem of Alp ine Regions DIS-ALP powered by Means of the European Regional Development Fund (ERDF)
M editerranean I ndex on operational oceanography and pilot A pplication for what-if predictions A proposal for a Specific Support Action submitted to.
Information Society Technologies in the 6th Framework Programme Information Society Technologies in the 6th Framework Programme IST Call 6 January 2006.
Problem 10M€/70 partners – Meetings ~0 Project lacks focus Moot point whether it addresses the call Proposed work is vastly in excess of available funds.
WE-Mentor Enterprising women in European Research mentoring India/Israel/Romania/Turkey WP 3 – Implementation of WE activities in the mentee regions 
26 May 2011 EFFMIS Workshop Athens, Greece Project Overview EFFMIS is an INTERREG IVC Capitalisation project, financed by the European Union's Regional.
Jitze P. van der Meulen Royal Netherlands Meteorological Institute (KNMI) RA-IV WIGOS Implementation Workshop (English), December,
Matthias Wentzlaff-Eggebert, BZgA This work is part of the Joint Action on Improving Quality in HIV Prevention (Quality Action), which has received funding.
Why to become a partner of URBACT August Title of presentation I Sunday, 06 March 2016 I Page 2 What is URBACT URBACT is a European exchange and.
URBACT IMPLEMENTATION NETWORKS. URBACT in a nutshell  European Territorial Cooperation programme (ETC) co- financed by ERDF  All 28 Member States as.
CARPE DIEM 2 nd meeting Critical Assessment of available Radar Precipitation Estimation techniques and Development of Innovative approaches for Environmental.
INTERREG III B CADSES: Possible types of projects Bratislava, 09 June 2004 Karl Schmude, Department for Spatial Planning Ministry for Labour, Building.
2. The funding schemes ICT Proposer’s Day Köln, 1 February 2007 The ICT Theme in FP7 How to participate to ICT in FP 7.
Hydrological cycle of the CADSES regions HYDROCARE PP11: National Institute of Hydrology and Water Management Bucharest, ROMANIA.
1 Consortium 7 European countries Spain (6) Greece (5) Italy (5)
Project HUSKROUA/1101/252 “Space Emergency System” – cross-border system for prediction of natural disasters incidents on basis of exploitation of satellite.
Advanced systems for prevention & early detection of forest fires (ASPires) KICK OFF MEETING Call for proposals for prevention and preparedness project.
West Africa Regional Work Plan Example
Danube GeoTour Valorisation of geo-heritage for sustainable and innovative tourism development of Danube Geoparks
URBACT III LAUNCH EVENT Brussels, 16 March 2015
Civil Protection Financial Instrument – Prevention Projects
ESSnet Projects Pascal JACQUES Unit/B5 Methodology and research
Where we are Where we want to be Challenges What we are doing
Work Programme 2012 COOPERATION Theme 6 Environment (including climate change) Challenge 6.4 Protecting citizens from environmental hazards European.
FLOODsite Integrated Project
Presentation of the Nordplus Higher education project
Overview of FLOODsite and CRUE
Improving pig system performance through a whole system approach (PigSys) Barbara Sturm.
Presentation transcript:

RISK AWARE TITLE : RISK – Advanced Weather forecast system to Advise on Risk Events and management ACRONYM : RISK AWARE Duration: 36 months Status: Running Starting date : 01/ European Countries + 1 non Eu (I,D,AT,PL,HR) 13 Partners Total Budget2,600,000 Euro ERDF1,300,000 Euro

Project partnership 4 European Countries + 1 non Eu (I,D,AT,PL,HR)

Project objectivies Project general objectivesProject general objectives Prevention of natural disaster at transnational level Elaboration of transnational programme for risk management Project specific objectivesProject specific objectives Development and implementation of an operational integrated system optimised for meteorological monitoring and very short range Optimal use of meteorological observations both of conventional type and from remote sensing Optimisation of the joint use of meteorological and hydrological models Harmonisation and preparation of plans of action for civil protection Data exchange Transfer knowledge and training activities

RISK-AWARE block-diagram RISK MANAGERS REQUIREMENTS GUIDE-LINES DEFINITION RISK MANAGERS TEST & VALIDATION ANALISYS OF EXISTING TECHNIQUES DATA EXCHANGE METEOROLOGICAL MODULE HYDRO-GEOLOGICAL MODULE TRAINING

6 functional blocks i.e workpackages –WP 1 - Development of methodologies for the optimal exploitation of observations –WP 2 - Definition of standard for the best use of meteorological hydrological and geological data and products to support warning emission and risk management –WP 3 - Set-up of a network between different partners and end- users –WP 4 - Weather monitoring and forecasting using advanced tools over Upper Danube Catchments area –WP 5 - Information and risk management system over the High Adriatic area –WP 6 - Project management and dissemination Project organisation