Ff NO A Accelerator Upgrades: Status Phil Adamson Fermilab

Slides:



Advertisements
Similar presentations
Main Injector Gap clearing kickers Phil Adamson (#) AEM 14th March 2011.
Advertisements

Proton Beam Measurements in the Recycler Duncan Scott On Behalf of the Main Injector Group.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
1 Electron Cloud Measurements at the Fermilab Main Injector Bob Zwaska Fermilab ECloud07 Workshop April 9, 2007.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Proton Improvement Plan Bob Zwaska August 3, 2015 All-Experimenters Meeting.
Proton Plans at Fermilab Robert Zwaska - Fermilab Science and Engineering at Henderson- DUSEL Capstone Workshop Stony Brook University May 5, 2006 Outline.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
Getting Beam to NuMI (It’s a worry!) Peter Kasper.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
Ff f f f “Conventional” neutrino beams: Target requirements Phil Adamson 13 th January 2012.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
Proton Plan Director’s Review 8/15/06 Prebys 2006 Shutdown Eric Prebys, FNAL Accelerator Division.
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
F Overview of the SuperNuMI Plan A. Marchionni, Fermilab AD/MID Accelerator Advisory Committee, May 10-12, 2006.
Proton Study Meeting 4/19/05 Eric Prebys 1 Proton Plan Stage I Eric Prebys.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
F 1 MW Proton Beam for Neutrinos Dave McGinnis AAC Meeting May 10, 2006.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Accelerator Operations and PIP Sergei Nagaitsev DOE OHEP briefing 6 March 2014.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
Proton Plan PMG 7/7/05 E Prebys 1 Proton Plan Status June Report Eric Prebys.
Fermilab Proton Driver and Muons David Johnson Fermilab Neutrino Factory Muon Collider Collaboration Meeting March 14, 2006.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Accelerator Status and Plans
Fermilab Run 2 Accelerator Status and Upgrades
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Proton Intensity Upgrades  Present operation of Main Injector and NuMI  NuMI designed for 400 kW, achieved a max beam power of 270 kW  Present Proton.
Proton Planning – Major Projects, Schedule, Decisions, and Projections Eric Prebys FNAL Accelerator Division.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
Proton Plan Expectations Eric Prebys AD/Proton Source.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
Magnets Technologies for NOνA Transfer Line (& RR30 section) July 21-23, 2009.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
Proton Planning Eric Prebys FNAL Accelerator Division.
Barrier RF Stacking Weiren Chou and Dave Wildman Fermilab, U.S.A. October 20, 2004 Presentation at the Proton Driver Session ICFA-HB2004, Bensheim, Germany,
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
F Possible Proton Capabilities at Fermilab Dave McGinnis April 16, 2007.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
Proton Plan PMG 4/18/05 E Prebys/J. Sims 1 Proton Plan Status March Report Eric Prebys Jeff Sims.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
PAC Meeting, December 12, Prebys 1 The Problem.
Protons for Neutrinos: Mid-Term and Project-X Bob Zwaska Fermilab Intensity Frontier Neutrino Working Group Meeting October 24, 2011.
Limitations to Total Booster Flux Total protons per batch: 4E12 with decent beam loss, 5E12 max. Average rep rate of the machine: –Injection bump magnets.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
MI/RR Operation Status Ioanis Kourbanis August 21, 2014.
Status of FNAL accelerator complex Sergei Nagaitsev 47th Annual Fermilab Users Meeting 11 June 2014.
HB2008 – WG F: 27 Aug. S. Childress – Diagnostics_2MW 1 NuMI Beam Diagnostics and Control Steps to 2 MW S. Childress Fermilab.
MI/RR Status January 3, 2014 D. Capista. MI Preformance.
Presentation transcript:

ff NO A Accelerator Upgrades: Status Phil Adamson Fermilab

ff About this talk This talk is not about the wonderful physics programme offered by the NO A beamline NO A MINER A MINOS+ See plenary talk by Jeff Hartnell this morning Brief overview of current accelerator complex Major upgrades required for NO A Status & schedule This talk does not contain every detail of the upgrade project Please feel free to ask about your favourite subject 2 NOvA Accelerator Upgrades - Phil Adamson

ff Current NuMI operation 3 NOvA Accelerator Upgrades - Phil Adamson Linac: 750 keV – 400 MeV Booster: 400 MeV – 8 GeV Main Injector: 8 GeV – 120 GeV Slip-stack 11 booster batches 2 batches to antiproton source 9 batches to NuMI Cycle length is 2.2s Typical peak NuMI beam power ~330 kW in mixed mode Also SY120 fixed target program Pbar storage in recycler Pbar and protons to Tevatron (plus BNB, MTA, NTF, …)

ff NOvA Accelerator Upgrades - Phil Adamson 4 NuMI neutrino beam 120 GeV protons Focusing Horns 2 m 675 m15 m 30 m Target Decay Pipe π-π- π+π+ νμνμ νμνμ Neutrino energy tuned by moving target (usually LE) Change horn polarity to select ν μ or ν μ

ff NO A upgrades Increase NuMI primary proton beam power 330 (380) kW -> 700 kW Additional focus on loss control Double the beam power Same tunnels Change neutrino beam energy (focussing) Optimize flux at off-axis NO A location 5 NOvA Accelerator Upgrades - Phil Adamson

ff Increasing beam power 6 NOvA Accelerator Upgrades - Phil Adamson Move slip-stacking to recycler 11 batch -> 12 batch Increase Main Injector ramp rate (204 GeV/s -> 240 GeV/s) 330 (380) -> 700kW with only ~10% increase in per- pulse intensity Main Injector Recycler

ff So need to rebuild recycler Remove: Old transfer lines Small aperture (pbar:  protons:  ) Stochastic cooling Electron cooling Pelletron Rebuild MI-30 with FODO lattice Various odds and ends that might be aperture restrictions Add: New injection line from MI8 to recycler New RR->MI transfer line 53 MHz RF system for slip- stacking Instrumentation BPMs Low-mass Ti multiwires IPMs Must maintain vacuum at – torr (TSPs) 7 NOvA Accelerator Upgrades - Phil Adamson

ff New MI-8 line Switched dipole at 849 ADCW (wide-gap modification of old ADC magnet) Strontium Ferrite permanent magnet dipoles like rest of MI-8 Two Samarium Cobalt dipoles (space constraints) Strontium Ferrite recycler quads, powered quad trims for lattice matching 8 NOvA Accelerator Upgrades - Phil Adamson

ff Installation in MI8 1-week shutdown in March 2011 Electric company replacing switchgear offsite Installed first PDD magnet in new MI8 9 NOvA Accelerator Upgrades - Phil Adamson

ff Rebuild 30 straight NOvA Accelerator Upgrades - Phil Adamson 10 New permanent quads for 30 straight in recycler Total cost cheaper than re-making existing quads ALARA

ff 53 MHz RF in Recycler Build 3 RF cavities A, B and hot spare 150 kV per cavity Operating range: MHz ± 1260 Hz 10 KHz fast (~40 µs) phase shifters from Proton Driver Recycle PAs and modulators from Tevatron LLRF close to a copy of MI system NOvA Accelerator Upgrades - Phil Adamson 11

ff 11 batches -> 12 batches Currently place 81 bunches every 86 in MI For NO A, place 81 bunches every 84 in Recycler. (84 = 588/7) Faster rising/falling edges -> many short kickers (6) Already have 7 RKA magnets in MI: Gap Clearing Kicker system for loss control 12 NOvA Accelerator Upgrades - Phil Adamson

ff Gap Clearing Kicker System NOvA Accelerator Upgrades - Phil Adamson 13 6/7 magnets will move up to recycler for NO A

ff GCK measurements AEM 14th March 2011 MI Gap Clearing Kickers 14 Edges within specification Slower edge in damper measurement might be artifact Damper (beam) measurement Calculated B from measured voltages For recycler, building “tail bumper” to cancel tail Tail measurement similar to electrical measurements (good)

ff AEM 14th March 2011 MI Gap Clearing Kickers 15 Green points: contact measurement at V105 GCK on for a week Already as low as end of 2009 shutdown GCK reducing local losses

ff Increase MI ramp rate 2 new MI cavities to maintain bucket area New transformer for vertical quad bus Increased heat load on cooling ponds Will need more cooling for summer – study underway looking at future cooling needs (not just NO A ) More ponds? Run a chiller in summer? Shade ponds? 16 NOvA Accelerator Upgrades - Phil Adamson

ff Beamline upgrades Increase rep rate 2.2s (2.0s) -> 1.33s Replace 5 3Q120 quads with ones from A150 beamline (better cooling) Upgrade magnet power supplies Faster ramp BULB Better regulation Current monitor -> beam permit New kicker power supply Beam intensity doubled, but beam loss in water- bearing rock must not double New 1 mil Ti multiwires - lower mass in beam 17 NOvA Accelerator Upgrades - Phil Adamson

ff Off-axis neutrino beam NOvA Accelerator Upgrades - Phil Adamson 18 Off-axis, neutrino energy driven by angle Adjust focusing to optimize flux 0 20

ff Target Hall Upgrades NOvA Accelerator Upgrades - Phil Adamson 19 NOvA: new horn 1 (thinner o.c.)

ff NO A target NOvA Accelerator Upgrades - Phil Adamson 20 NuMI target (top) must fit inside horn 1 Small, mechanically weak. Recent problems – failure of water cooling lines NO A target (right) upstream of horn 1 (neutrino energy from off- axis angle) Much more robust design. Water cooling 8 times further away from beam than NuMI Target construction in progress – delivery this fall

ff Target Carrier “Prototype” carrier complete Expect to use as first production carrier Shown here with target/baffle mockup 21 NOvA Accelerator Upgrades - Phil Adamson

ff Schedule & Summary Tevatron operation completes by October 1 Begin NO A shutdown March Shutdown scheduled for 11 months Current installation schedule has work completed in 8-9 months Then commission new accelerator complex If accelerator work done before NuMI, can get an early start on commissioning NO A accelerator upgrades proceed on schedule I look forward to commissioning the new complex and swift progress towards 700 kW NOvA Accelerator Upgrades - Phil Adamson 22

ff NO A Accelerator Upgrades: Status Phil Adamson Fermilab

ff Slip-stacking Neutrino experiments want more beam! Inject 11 batches rather than 6 But pay for it with increased losses (<95% efficiency) AEM 14th March 2011 MI Gap Clearing Kickers 24

ff Slip-stacking recapture (real data) AEM 14th March 2011 MI Gap Clearing Kickers 25

ff Transfer and new MI8 lines NOvA Accelerator Upgrades - Phil Adamson 26