Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.33 2014Page No.: 1 Activity Report 2014 WG A3.33 Experience with equipment.

Slides:



Advertisements
Similar presentations
Documents for GEO & EO Summit II 1.Statement/Communiqué to be agreed by EO Summit II 2.Framework Document to be agreed by EO Summit II 3.GEO Report to.
Advertisements

1 The mission of Study Committee A3 is to facilitate and promote the progress of engineering and the international exchange of information and knowledge.
Study Committee Representatives Annual Report December, 2012
JWG A2/B4-28 HVDC Converter Transformers Progress Report Convener: Milan Saravolac IEC SYMPOSIUM DELHI, January 2009.
WG B4.62 Connection of Wind Farms to Weak AC Networks Working Group Meeting – June 2013, ERCOT Office, Taylor, Texas.
O.Gjerde WG C2/C5.05 Development and Changes in the Business of System Operators Status report from WG C2/C5.05 Ole Gjerde, Statnett Convenor September.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.28 AR Page No. 1 Activity Report WG A3.28 Switching phenomena.
International Symposium on Standards for UHV Transmission System Impacts on UHV Substation Equipment On behalf of CIGRE WG A January 2009,
Second IEC-CIGRE UHV Symposium, January 2009, New Delhi
Study Committee A3 HIGH VOLTAGE EQUIPMENT CIGRE SC A3 meeting in Paris, August 26, 2014 Page No. 1 Working Group Activity Report 2014 JWG A3/B5/C4.37 System.
Study Committee A3 HIGH VOLTAGE EQUIPMENT CIGRE SC AG1 meeting in Berlin, March 4, 2015 Page No. 1 Working Group Activity Report 2015 JWG A3/B5/C4.37 System.
CIGRE WG C PRACTICES IN INSULATION COORDINATION OF MODERN ELECTRIC POWER SYSTEMS AIMED AT THE REDUCTION OF INSULATION LEVELS WG Composition: WG.
1 AG.03: CIGRE SC A3 Green Book proposal (based on experience of Brazilian NC to publish CIGRE textbooks) CIGRE SC A3 Green Book Project Team Paulo Fernandez.
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Stephen R Whitesell SC-5 Chair 11/13/2014.
CUTTHROAT ENERGY Preliminary Design Review. Sponsored by:
FIRST WORKSHOP ON PREPARATION FOR THE 3 rd ROUND OF ABET VISIT Samir Al-Baiyat Dean, College of Engineering Sciences, KFUPM SEPTEMBER 19, 2006.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Activity Report 2014 WG A3.30 SUBSTATION EQUIPMENT OVERSTRESS Convener: Antonio Carvalho - BR Secretary: Jorge.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.26 AR 2014Page No.: 1 Activity Report 2014 WG A3.26 Influence of shunt capacitor.
Standardization Aspects in UHV Networks New Delhi, January 2009 Denis Dufournet Chairman IEC TC17 Member CIGRE WG A3-22.
How an idea becomes an IEC standard Gary Johnson Chairman IEC SC45A
SC-A3 (High Voltage Equipment) SCA3 meeting, Delft (Neetherlands), March 12, 2014 A. Mercier (Convener) WG: A3.35 report Guidelines and Best Practices.
State Information Technology Agency Presentation to Portfolio Committee on Home Affairs.
1 Accredited Standards Committee C63 ® - EMC ANSI ASC C63 Subcommittee 7 Spectrum Etiquette Report to C63 H. Stephen Berger Chair, SC7 November 13, 2014.
INTOSAI WORKING GROUP ON KEY NATIONAL INDICATORS Dmitry Zaytsev Accounts Chamber of the Russian Federation Sofia, March 25, 2015 VIII MEETING WORKING GROUP.
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
Legislative Policy Committee ISAC Board approved concept at their meeting in December.
1 Accredited Standards Committee C63 ® - EMC SC5 Report Stephen R Whitesell Chair 05/09/2013.
APEC EWG 23 Bangkok, Thailand Earthquake Response Cooperation Program for Energy Supply Systems Phase 2 Progress Report By Chinese Taipei May 16, 2002.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.32 AR 2014Page No.: 1 Activity Report 2014 WG A3.32 Non Intrusive methods.
1 Accredited Standards Committee C63 ® - EMC SC5 Report Stephen R Whitesell Chair 11/14/2013.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.24 AR 2014Page No.: 1 Activity Report 2014 WG A3.24 Tools for Simulating Internal.
VOLUNTEER MANAGEMENT SITE VISIT DATE The Leadership Development and Strategic HR Practice Area is presented by American Express. This Service Grant design.
1 Overview of Reliability Requirements XYZ Cooperative Date: abc.
CIGRE WG C4.24 – Power Quality and EMC Issues associated with future electricity networks WG Composition:  Convener: Francisc Zavoda; Secretary: Sarah.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.27 AR 2014Page No.: 1 Activity Report 2013 WG A3.27 The Impact of the Application.
HAPUA WG No.5 (ESI Services) Updates The WG2, 5, 6 and Chairman of APGCC Meeting Jakarta, Indonesia ● 26 February 2009 By WG 5 Project Coordinator: MR.
Doc.: IEEE b Submission November 2004 Robert Poor, Ember CorporationSlide 1 Project: IEEE P Working Group for Wireless Personal.
DICOM to ISO-DICOM Report to joint ISO TC215/WG2 – DICOM WG10 meeting January 24, 2004, San Diego.
ISO Liaison Report Hidenori Shinoda Charles Parisot.
CISPR/TC77 Joint Task Force Activity Update ACEC meeting in Paris, June 2006 Prepared by Donald N. Heirman Chairman CISPR Subcommittee A.
CIGRE WG C4.503 – Numerical techniques for the computation of power systems, from steady- state to switching transients WG Composition:  Jean Mahseredjian.
Doc. IEEE n: Submission Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG 4n discussion.
1 Briefing on the Draft Call for Projects and Schedule for the Air Quality Conformity Assessment for the 2011 CLRP and FY TIP Technical Committee.
Coordination Activities by JICCG for UHV technology standardization Hisatoshi Ikeda Co-Chairman of IEC/JICCG Toshiba Co. & Kyushu Institute o f Technology.
Mo-Kan Council of Amateur Radio Organizations A Brief History.
Report on Technical Board (Sept. 2013) Taketo Uomoto Chairman of TB.
CIGRE JWG A2/C4.52 – High-Frequency Transformer and Reactor Models for Network Studies WG Composition:  WG Convener: Bjørn Gustavsen  WG Secretary: Angelica.
CIGRE WG C4.24 – Power Quality and EMC Issues associated with future electricity networks WG Composition:  Convener: Francisc Zavoda; Secretary: Sarah.
Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages Task status report, Task XVII EXCO meeting.
WG Composition: WG Convener: Bjørn Gustavsen
Study Committee Representatives Annual Meeting October 18, 2010 Winnipeg SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
September 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for September 2016]
Simplification of Lighting and Light-Signalling Regulations
CIGRE WG C4.33 – Impact of Soil-Parameter Frequency Dependence on the Response of Grounding Electrodes and on the Lightning Performance of Electrical Systems.
WG Composition: WG Convener: W. A. Radasky
SAB Secretary Report Standards Activities Board Debbie Brown
CNC-CIGRE Study Committee Meeting October 19, 2008 Winnipeg CIGRÉ SC – A3 High-Voltage Equipment Hubert Mercure Hydro-Québec / IREQ.
SARIF TC Timeline Proposed, approximate.
Security Guidelines Working Group Update
IEEE Rail Transit Vehicle Interface Standards Committee
API SC 10, Work Group 3 Update:
Smart Grid Technology - A Master Programme (SGT-MAP)
Next Steps Advisory group debrief call Circulate meeting summary
Submission Title: TG 4n discussion items for September 2015 meeting
July 2014 doc.: IEEE /3/2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
Green Infrastructure: Working method
STUDY COMMITTEE A1- ROTATING ELECTRICAL MACHINES
September 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for September 2016]
Presentation transcript:

Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A Page No.: 1 Activity Report 2014 WG A3.33 Experience with equipment for Series / Shunt Compensation Convener: Guofu Li (China)Year of Kick-off: 2013 Number of Members:21 (According approval of the last SC meeting see last page) Regular Members: 17Corresponding Members:4 Retiring Members: None New Members: 2 Proposed for approval by SC A3 WG title and general information A3-14(AG01)021-IWD

Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A Page No.: 2 Membership Proposed for approval by SC A3 National CommitteeMember NameCompany / University ChinaGuofuLiChina Electric Power Research InstituteRM ChinaZutaoXiangChina Electric Power Research InstituteRM JapanHirokiItoMitsubishi ElectricCM ChinaJianbinFanState Grid Corporation of ChinaCM ChinaXiaogangWangState Grid Corporation of ChinaRM ChinaZhibingLiChina Electric Power Research InstituteRM ChinaChaoboDaiChina EPRI Science & Technology Co. LTDRM The NetherlandsAntonJanssenLianderRM CanadaFrancineRochon Hydro Quebec TransEnergieRM BrazilJorgeAmonFURNAS Centrais ElectricasRM GermanyReinhardGoehlerSiemens AGRM GermanyFrankRichterSiemens AGRM GermanyDaoxiongZhangSiemens AGRM FranceFrançoisGallonAlstom GridRM South AfricaNeelsvan StadenEskom Holdings SOC Ltd.RM South AfricaChrisvan der MerweTrans-Africa Projects (Pty) LtdCM USBharatBhargavaElectric Power GroupRM IrelandRobertle RouxElectricity Supply Board International (ESBI)RM JapanMasayukiKosakadaToshiba CorporationCM AustriaPeterDopplmairCoil Innovation GmbHRM SwitzerlandManuelGottiABB Siemens AGRM USRoderickJason MacLeodBurns & McDonnellCM JapanSHIKEN(Zhixian) Ka (He) Mitsubishi ElectricRM

Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A Page No.: 3 Technical activities & discussion items Progress of work, documents to be discussed during the SC A3 meeting and future program The kick-off meeting of WG A3.33 had been held on the 14th and 15th of September, There were brief introductions and discussions to the experiences of series and shunt compensation applications in several countries by members from those countries.

Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A Page No.: 4 Technical activities & discussion items Progress of work, documents to be discussed during the SC A3 meeting and future program The second meeting of WG A3.33 will be held on the 15th and 16th of April. The experiences of series and shunt compensation applications in several countries will be discussed further. A technical visit to an UHV substation with series capacitors is scheduled on the 14 th, also. A questionnaire draft will be prepared before the second WG meeting, and will be discussed and supplemented in the meeting. The questionnaire will be distributed among the WG members as homework and used for investigations of series/shunt compensation applications in words and figures after the second meeting.

Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A Page No.: 5 Publications Publication on behalf of the WG (Title, way of publication, stage of preparation, approximate date of final version Cigre Technical Brochure Title/Working title: “Experience with equipment for Series / Shunt Compensation” Draft ready for circulation within the SC: March 2016 Aim for final version for approval: September 2016