1 WP 10- High Voltage ’06 March 23 rd HV Trip studies  See previous meetings for the foreseen tests on LBC44  Started late by Clermont people when Clermont.
Scintillation counter installation on EBC cryostat scintillators gap scintillators location of MBTS scintillators MBTS counters will be plugged into fiber.
Status of DCS for TDAQ racks Y. Ermoline et al. ATLAS TDAQ Week, CERN, 27 April 2005.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
INJECTORS BLM BI-TB on Proton Injector start-up. Summary of actions 2 BLM SystemComments LINAC2 8 movable detectors.
Update on FMS Repair Stephen Trentalange STAR Management Meeting October 31,
Active Dividers Tilecal upgrade meeting at Stockholm (3-5 June 2013) François Vazeille on behalf of Roméo Bonnefoy, Michel Crouau (Now retired) Dominique.
Electromagnetic Compatibility of a Low Voltage Power Supply for the ATLAS Tile Calorimeter Front-End Electronics G. BLANCHOT CERN, CH-1211 Geneva.
Upgrade developments in Clermont-Ferrand Romeo Bonnefoy and François Vazeille Tilecal upgrade meeting (CERN, 13 June 2014) ● Handling tools ● Deported.
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
System Elements HighPoint Broadband Delivery System Sector 1 Sector 3
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
HF Cabling Upgrade Options T. Shaw 30-OCT HF 2012 Upgrade Meeting 30-OCT-10 T. Shaw.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Main Board Status MB2 v1 for FATALIC & QIE 10/06/2015Roméo BONNEFOY - LPC Clermont1 Roméo BONNEFOY François Vazeille LPC Clermont-Ferrand.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
DVCS-2 Assembly & Installation Charles Hyde DVCS Collaboration Meeting 18 December 2009 Clermont-Ferrand.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
SPD cabling issues I.Cable status II.Cabling inside VFE box III.Cable through chains (Gael) IV.Data spare cables V.Control bundles VI.Information for cabling.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
DCS Workshop 17 June 2002 PHOS DCS status Serguei Sadovski.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
06/03/2002Ivan Hruska EP/ATE1 LV brick for TILECAL  Overview Design summary Results from 2nd radiation tests in PSI Villingen Bulk supply Plans for future.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
R&D status of the very front end ASIC Tilecal week (7 October 2011) François Vazeille Jacques Lecoq, Nicolas Pillet, Laurent Royer and Irakli Minashvili.
Performances of the HV system out of Drawers Roméo Bonnefoy, Robert Chadelas, Christian Fayard, Marie-Lise Mercier, Eric Sahuc and François Vazeille (LPC.
Short news on the FATALIC project Wednesday Tile Upgrade meeting 2016 May 4 Roméo Bonnefoy and François Vazeille  Communication Main Board-Daughter Board.
Design summary Status of the development & production - test run with S3a and S3b prototype - performance tests To do list for production & development.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
Information about Multi-conductor cables of the Remote HV option Wednesday Tile upgrade meeting 10 February 2016 François Vazeille (LPC Clermont-Ferrand)
MobiDick4 progress report Carlos Solans. Introduction MobiDICK is a complete test bench for super-drawers Will be used during the maintenance in the long.
Status of Clermont-Ferrand R&D works Tiles session in AUW François Vazeille LPC Clermont-Ferrand ● Mechanics ● External High Voltage Power Supply ● Active.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
On detector electronics: High voltage part Tilecal session in ATLAS upgrade week (Tuesday 10 November 2009) François Vazeille  What are the constraints.
Clermont-Ferrand requests for the Test Beam Vidyo meeting, 29 July 2015 François Vazeille -Remote HV System -Front End electronics Hypothesis: Some Mini-Drawers.
Status of the Remote HV Tile Upgrade session during the AUW Wednesday, 20 April 2016 François Vazeille on behalf of the Clermont-Ferrand team  Same set-up.
Answers to Barcelona questions about Mini-Drawers and comments Tilecal upgrade meeting CERN (24 June 2013) François Vazeille on behalf of Roméo Bonnefoy,
Last upgrade R&D results on the LPC works
"Drawer Mechanics - MiniDrawer"
Upgrade activities at Clermont-Ferrand
Tile Upgrade Workshop (CERN- February and 9)
TileCal upgrade EVO meeting Demonstrator tesks
T1 Electronic status Conclusions Electronics Cards:
Mini-drawers, FE-ASIC , Integrator
Tilecal week (8 February 2012)
Status of upgrade works at Clermont-Ferrand
HV distribution and discussion
Presentation transcript:

High Voltage System outside Drawers Tilecal upgrade meeting at Stockholm (3-5 June 2013) François Vazeille on behalf of Roméo Bonnefoy, Christian Fayard, Marie-Lise Mercier, Eric Sahuc.  Summary of previous progresses  Present status  Tests and next steps 1

Summary of previous progresses  Several options reported since a long time HV regulation inside/outside Drawers [Tilecal meetings: February 2008, November 2009, September 2012]  Choice of the outside option 3: - Re-cycling of HV cards inside a special crate put in the electronics room. - Design of HV bus cards sharing the individual HV’s (with noise killers). - Use of multiconductor cables to supply the HV bus cards.  Clermont-Ferrand proposition to develop an outside option, but ready to provide all the information on the present ATLAS inside option. 2

New HV Bus boards (no active components) 12 channels. - A 4-layer printed circuit: External layers as shielding, Internal layers to distribute the HVs. - Noise killers everywhere. - New HV connectors (more robust), but 8 weeks delivery delay New HV regulation crate: ¼ of the total space (4 Modules later) HV LV’s Individual Hvout: SUBD25 connectors CANBUS Rear Front 3

Present status HV Bus boards ready to equip 3 trains of Mini-Drawers A cable tray will run 3 different cable lengths towards Drawers 2, 3 and 4 (Fixation holes made here) 4

Regulation crate HV Source Operational DCS Various cable lengths - 1m long. - 4 times 20 m long (175) m long, to reproduce ATLAS. 5

Tests and next steps  Clermont-Ferrand tests HV tests in progress, with a PMT Block lighted by a blue LED  Noise measurements for different cable lengths.  Results the next time.  CERN tests - Mini-Drawer handling/connection tests in building 175 using Slider and Basket, in the same time as mechanics tests. - HV tests in building 175, once the Clermont-Fd tests will be fully efficient. - Equipment of a Demonstrator in Building