Project Checklist ◦ SyRs – Completed ◦ SDS – In progress ◦ Project-  GUI Cleanup – In progress  Hardware Replacement - Completed  Actual Testing – In.

Slides:



Advertisements
Similar presentations
Scott Coffin Adam Faucher Jason Graika Brian Voelz Client: Honeywell Advisor: Dr. Zhengdao Wang.
Advertisements

Technology Interactions ‹ Chapter Title Copyright © Glencoe/McGraw-Hill A Division of The McGraw-Hill Companies, Inc. Technology Interactions Computer-aided.
Obtaining reliable fresh water supplies from challenging water sources.
A) 80 b) 53 c) 13 d) x 2 = : 10 = 3, x 3 = 309.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
1. Introduction Fundamental English Writing Skills Dr. Hsin-Hsin Cindy Lee.
System for Engine Location Of a Web Train Paul Wimmer and Adam Weintrop Dr. Irwin and Dr. Schertz 12/5/05 Project Proposal -CTCDS.
LAr ROD Status Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Laurent, Eric, Jean-Pierre, Gilbert,... ATLAS Geneva DPNC January 12 th, 2005.
The Project at a Glance... Project budget of $1000 Power provided by existing 5.0V EVB power supply Previous design has been wire wrap assembled to serve.
College of ENGINEERING BRMHS Power Generation Lab Kit Team Wired Up 1 Construction Milestone.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) - Review.
Objectives How Microcontroller works
Work as a team with the people on your table the first table to complete this activity will get to leave first. What you need to do: There are four different.
1 Sasha Milov DC meeting Jan 11, 2006 HBD upgrade status. Sasha Milov Jan 11, 2006.
Scott Coffin Adam Faucher Jason Graika Brian Voelz Client: Honeywell Advisor: Dr. Zhengdao Wang.
Scrolling LED Project Michael Turovskiy IME 458 Dr. Jianbiao Pan 6/5/2013.
Stuff to do Project Progress Slides. Week 12 March Create Demo Day Poster Contact USRadar-check on progress of panel analysis Write abstract for.
Treasure Chess ECE 477 Team 2 - Spring 2013 Parul Schroff, Brock Caley, Sidharth Malik, Jeremy Stork Final Presentation Final Packaged Design.
7 th grade Science RULE-BASED SUMMARIZING.  What does it mean to summarize? SUMMARIZING  State or express in a concise form.
1. Hardware: each component on the microcontroller will need to be tested individually using multi-meters, logic analyzers, and circuit probe analysis.
CS-EE 481 Spring February, 2006 University of Portland School of Engineering Project Molalla Microprocessor-based Charge Controller Team Andrew Melton.
Eva Ulibarri, Joel Watson, Omonayo Bolufawi, Stephanie Anderson 1.
Senior Design 1 University of Portland School of Engineering.
Project Goals Our task was to take the proof of concept and make a production ready prototype with the following parameters Use low cost microprocessor.
Rack Control Paul Maley DRAFT 1 September Overview –Status of monitoring & safety system –Big System Baseline – reminder Alternative –Summary.
Bonitron A\C Demand Scheduler Alex Brown Cory Haugh Ajmer Dwivedi.
DC Motor Control Project Group A ALEXANDER M FUNK LAM D NGUYEN JAKEISHA D THOMPSON PAULETTE J VERNON ERIC G ZAISER 10/22/01.
Daredevil Robot Direction Module (DRDM) Senior Design II Midterm Presentation.
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
Plasma Sense Amplifier
TEST PROCEDURE Testing the Controller Board, Power Supply Board, and Unit as a Whole.
P.I.D Control for a Wearable E-Braille Using a Force Sensing Resistor Alejandro Martinez Arrieta Advisor: Dr. Mohammad Saadeh ET 493 Instructor : Dr. Cris.
ASSEMBLING THE PCB Have the PCB in front of you as shown. Make sure there are no copper tracks showing. This side is called the component side.
ICC PRO - Weather Stations. Finalize ET Every day, calculate the ET for the previous or current day This is the value that is used for calculating watering.
FEE Electronics progress Mezzanine layout progress FEE64 progress FEE64 initial testing Test mezzanine. A few of the remaining tasks 2nd October 2009.
ECE 4006B Fall, 2002, Group 1, Mei Chan Progress Report Period (November 22-December 5, 2002) Receive and complete assemble 2 nd PCB board Complete the.
ATF DR BPM Upgrade Janice Nelson, Doug McCormick, Justin May, Andrei Seryi, Tonee Smith, Mark Woodley.
Indoor Localisation Sensor for Elderly People Student: Damien Reilly Supervisor: Dr. John Breslin.
Clients/Faculty Advisors Dr. Eric Bartlett May01-14 Team Members David Herrick Brian Kerhin Chris Kirk Ayush Sharma Incremental Learning With Neural Networks.
AIDA 1 Mezzanine board Resistors and capacitors near the ASiCs have now been relocated to the underside of the PCB. Cooling pads have been extended.
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
Team Members:  Kyle Bloomer  Josh Geiman  Lucas Bennett Team Sponsor:  Dr. Cindy Harnett Team Mentor:  Dr. Andy Dozier.
Grindmaster Controller Team Meeting 3/28/2012. Agenda System Diagram + Progress Firmware Progress WiFi Progress Update Hardware Progress Update.
Contact Us.
Chris Booth Sheffield 29th March 2006
Propeller Clock.
Microcontroller Evolution
HARDWARE CITY GROUP 1ST Annual Poker Run & Picnic August 23rd 2015
IPhone Noise Cancellation Meeting 1/28 Project group: May1315 Client: Rockwell Collins Advisor: Dr. George Amariucai.
ATF2 Magnet Power Supplies
10/month is the present production rate 2 FTE + sporadic contributions
SMART IRRIGATOR                                                                   -BY ADITYA JHAWAR.
How To Add A Xerox Printer To Google Chrome
Frio River Cabins - Frio Vacation Homes - Frio Country Resort
Team Portland City Grill Founder’s Day Presentation

ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
PLANNED WORK for week #10 (week of Oct. 28 – Nov. 3) PROGRESS
Name, Hour, Date.
Dental Bridges Replacement Teeth
Microcontroller Evolution
Journey to the Land of the Bible with Dr. Paul Shockley
Wireless Embedded Systems
Firebase Vs. MongoDB: Choose the Best Database of 2019
How to Fix Brother Printer Machine Error 48?
By: Benjamin G., Candy L., Miranda B., Rovertho B. POE EDHS
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #10
Meet Us
CHECKLIST Example text
Contact Us
Presentation transcript:

Project Checklist ◦ SyRs – Completed ◦ SDS – In progress ◦ Project-  GUI Cleanup – In progress  Hardware Replacement - Completed  Actual Testing – In Progress (Still trying to find assistance) ◦ Final Report – N/A

 PCB built by Doug  Programmer and missing resistor received  SDS in progress

 Order qty 2 PCB from PCB express ◦ Kyle meet with Tom Carroll  Receive parts order for two Cstat prototypes  Assemble D. Jackson’s board with parts in hand  Contact Dr. Waters for test supplies  Complete 1 st draft SDS