HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.

Slides:



Advertisements
Similar presentations
6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
Advertisements

20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
July 10, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
Sept 25, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Large Area, High Speed Photo-detectors Readout Jean-Francois Genat + On behalf and with the help of Herve Grabas +, Samuel Meehan +, Eric Oberla +, Fukun.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
Ionization Profile Monitor Front End (IFE) System Presenter: Kwame Bowie PPD/EED Phone: (630)
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
Development of novel R/O electronics for LAr detectors Max Hess Controller ADC Data Reduction Ethernet 10/100Mbit Host Detector typical block.
LECC 2004 – Boston – September 13 th L.Guiducci – INFN Bologna 1 The Muon Sorter in the CMS Drift Tubes Regional Trigger G.M. Dallavalle, Luigi Guiducci,
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
Main Board Status MB2 v1 for FATALIC & QIE 10/06/2015Roméo BONNEFOY - LPC Clermont1 Roméo BONNEFOY François Vazeille LPC Clermont-Ferrand.
A. Sukhanov, BNL1 NCC Electronics Readout of pad structured sensors ● High dynamic range ● Summing signals from 6 detectors on one preamp ● NCC should.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
A. Sukhanov, BNL1 NCC Electronics Readout of pad structured sensors ● High dynamic range: 14 bit range, 10 bit accuracy ● Summing signals from 6 detectors.
PHENIX upgrade DAQ Status/ HBD FEM experience (so far) The thoughts on the PHENIX DAQ upgrade –Slow download HBD test experience so far –GTM –FEM readout.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
First ideas for the Argontube electronics Shaper, simulations Block Diagram for analog path Delta Code Data Reduction Bus system, Controller Max.
Updated HBD FEM Diagram Clock Master Clock fanoutADC Optical out Backplane Crate GTM/Ethernet New Daughter card + DCM Test pulse.
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
1 FADC Boards for JPARC-K Preliminary Proposal Mircea Bogdan November 16, 2006.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
DAQ/Trigger System proposal for the Angra Neutrino Detector Herman Lima Jr (18 May 2006) Centro Brasileiro de Pesquisas Físicas.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
01/04/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
FVTX Electronics (WBS 1.5.2, 1.5.3) Sergey Butsyk University of New Mexico Sergey Butsyk DOE FVTX review
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
HBD/TPC Electronics Status Works done to for a)Prototype detector readout b)Understand packing density and heat loading issues c)Address the overall system.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Nov 1, 2007 IEEE NSS & MIC 2007 by C. Y. Chi 1 A Faster Digitizer System for the Hadron Blind Detector in the PHENIX Experiment Cheng-Yi Chi Nevis Lab.
HBD/TPC Electronics Status Works done to for a)Prototype detector readout b)Understand packing density and heat loading issues c)Address the overall system.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
Terra-Pixel APS for CALICE Progress meeting 10 th Nov 2005 Jamie Crooks, Microelectronics/RAL.
1 Carleton/Montreal Electronics development J.-P Martin (Montreal) Shengli Liu & M. Dixit (Carleton) LC TPC Meeting DESY Hamburg, 4 June 2007.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Calorimeter Digitizer Electronics Cheng-Yi Chi Columbia University Nov 9-10, 2015sPHENIX Cost and Schedule Review1.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
14-BIT Custom ADC Board Rev. B
Production Firmware - status Components TOTFED - status
96-channel, 10-bit, 20 MSPS ADC board with Gb Ethernet optical output
14-BIT Custom ADC Board JParc-K Collaboration Meeting
VeLo Analog Line Status
LHCb calorimeter main features
RPC Front End Electronics
JParc-K DAQ System Mircea Bogdan December 9-10, 2006.
RPC Front End Electronics
DCM II DCM function DCM II design ( conceptual ?)
Local Level 1 trigger Hardware and data flow
RPC FEE The discriminator boards TDC boards Cost schedule.
DCM II DCM II system Status Chain test Schedule.
New DCM, FEMDCM DCM jobs DCM upgrade path
PID meeting Mechanical implementation Electronics architecture
RPC Electronics Overall system diagram Current status At detector
sPHENIX DOE-SC CD-1/3a Review WBS 1.5.3: CalElec Digitizers
Digitally subtracted pulse between
TOF & BB FEE Safety Review
PHENIX forward trigger review
Cheng-Yi Chi Nevis Lab Physics Dept Columbia University
Beam Beam electronics Block diagram disc gated disc gate disc gated
Presentation transcript:

HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.

FEM Block diagram Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing /clocks Data path L1 primitive Signal cable

Cable (connector) choice Before Oct M shield twist pair cable 1785/34 (17 pair  16 signal + grounds) connector 3431 size = 62.6mm + 9.4mm(ejector) 80 signals => 36 cm 3M MDR (Mini D Ribbon) cables Need to have custom build 50 pins cable example ezbb-xxx-0lc connector 40 position VE 47.1mm for 16 pairs mm for 80pairs. 25mm for power and test pulse. Detector has 8 panels Readout both side of the panel Panel size 23x26 cm

The Current Cable Choice We would use the infiniband 12X cable It has 24 individually shielded differential parallel pairs 48.9mm wide for cable/connector end 0.5mm between signals/grounds For 26awg cable 3.2“ bending radius (cable OD: 0.540") Assembly 90-Degree Bend Radii is 5.7” for 26 awg. Caution: connector is made of zinc cast. cable are heavy we need to use vertical daughter card to bring the signal out 1.5mm

The differential receiver Use Analog Device AD8138 receiver set up as unity gain Total voltage On the cable Total voltage Seen by ADC Simulation result For 16fc input charge ADC +/- inputs ADC has 1V range Max ADC range is about 7~8 time of 16fc

The 8 channel 12 bits 65MHzADC The ADC receives differential signals The V common is 1.5V The +/- input can swing from 1V to 2V + side 2V, - side 1V -> highest count - side 2V, + side 1V -> lowest count Our +/- input will swing from 1.5 to 2V/ 1 to 1.5V we will only get 11 bits out of 12 bits 16fc will be roughly sitting 256 count We will run the ADC at 6X beam crossing clock 6X9.4 MHz = 56.4 MHz or ~17.7ns per samples

FEM BOARD ~ 5 cm We layout the differential receiver block An layout example file was send to the assembler to comment on… O.K. Currently we can pack receiver in 8 mm pitch We will set FEM card to be a 6U module 48 channels per card Receiver will be layout to be 2 rows. Each row will have 24 receiver blocks. With 96 channels per panel per side total channel count is It will fit in two 6U VME styles crates.

FPGA Receive ADC data, provide L1 delay, Multiple L1 triggered events, format data, generating L1 trigger primitives, manage clocks, test pattern etc. 48 channel of serial ADC => 48 *720 Mbits/sec or 34 Gbits/sec need to be received. We choice Altera Stratix EP1S pins package as the device for 32 channels before we change the cables. We need to re-evaluate which FPGA device we will use… –Otherwise we will pay higher cost per channel… –(either one larger FPGA for 48 channels of data or smaller one for 24 channels of data)

HBD data to DCM 12 samples per channel –Cover 2 beam crossing Assume the optical will run 6X beam crossing rate. –24 channel will take ~16.6 ns*24*12=4.8 microsec We will merge 4 24 channels sets of data into one optical links in un-multiplexed mode –8 24 channels sets in multiplexed mode to DCM

Trigger data Each channel has 7 of threshold -> 3 bits –Link run at 6x beam crossing rate. every clock cycle can send 4 channel of data (12 bits), 24 channel of data for every beam crossing.

Outlook If there are no more changes, We still looking at 5 months before we can have the any prototype modules. The test will probably finish 3 months after that, if there is no major errors. The Production will take 6-9 months.

Logistic issue in the ¼ detector readout If we can pack 48 channel into the FEM, we will have 32+4 FEM, 2+2 backplanes, 2+2 crate interfaces and 2+2 crates. This is a small build. The printed circuit board manufactures have minimum lot charge, we are very close to it. Splitting the PCB order will double the cost. We will order 40(80) FPGA, 200+ ADC for the whole build. Splitting order will just increase the overall cost. The assembler has setup charge. We will pay the setup charge twice when splitting the order. We will need to increase the EDIA cost in Nevis because we need to repeat the construction process twice, i.e. order, prepare the assembly kits etc…

Possible Solution Increase the prototype module number from 2(3) to 10(11). Don’t assemble the board till the first two boards is working. (still has to pay the additional setup charge) We will look at 5-10% increase in the overall budget in this scenario. We will need the money in few months to buy the additional compoents.