BOEING is a trademark of Boeing Management Company. Copyright © 2011 Boeing. All rights reserved. OMWG and All Working Groups DCIT-39 report out 11 March.

Slides:



Advertisements
Similar presentations
FANS (Future Air Navigation System) Flight Crew Procedures
Advertisements

Information Technologies Page 1 Information Technologies Page 1 Information Technologies Page 1 Information Technologies Page 1Information Technologies.
Federal Aviation Administration S1P1/P2 Production System: DCL Route Rules DCIT#32 16 April 2014.
Defect Tracking and Management
Biller Direct Getting Started
[Title of meeting] [Name of sponsor] [Date] For guidance on working with PowerPoint and reformatting slides, click on Help, then Microsoft PowerPoint Help,
Recent Lighting and Marking Design Challenges/Trends
IS&T Project Management: Project Management 101 June, 2006.
IS&T Project Management: How to Engage the Customer September 27, 2005.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Departure Clearance Trials (DCL) Test Status DCIT Meeting # 22 Washington,
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: AOC WG From: Data Comm Production Sub-Team Date: 07/11/12.
Federal Aviation Administration Data Communications Program Data Comm Trials and Production Requirements: High Level Impact Presented To: DCIT #23 Plenary.
Performance Management Open Information Session Spring 2009.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Federal Aviation Administration Data Communications Program DCL Trials DCIT Update MEM ATCT To:DCIT Plenary From: Matt Maki Date:
Solutions Summit 2014 Discrepancy Processing & Resolution Terri Sullivan.
CPDLC / ADS Operations 4/22/2017 2:35 PM
Harris.com Michael Earl Systems Engineering, Trials and OPR Trials Status and OPR Update.
Presented to: DCIT #12 Plenary By: Andy Fry, Thane Inc. Date: January 12, 2012 Federal Aviation Administration Data Communications DCIT Update Flight Deck.
Data Link Communications
Data Communications Implementation Team (DCIT)
Document Tracking and the Related Process Andria Roney Rob Mead Andy Fry Andrew Onken.
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #25 Agenda 07/17-07/18/2013 Harris Corp – Washington, D.C.
Presented to: DCIT FDWG Breakout Session By: Andy Fry, Thane Inc. Date: July 11, 2012 Federal Aviation Administration Data Communications DCIT #16 Flight.
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
Federal Aviation Administration Data Communications Program Departure Clearance (DCL) Trials DCIT17 To:DCIT Plenary From: Matt Maki, Trials Lead Date:
Federal Aviation Administration DCIT 39: S1P1 DCL E2E Summary DRAFT To: DCIT All WG From: Data Comm Production SE Date: DCIT 39, 11 March DRAFT.
EWR DCL Flight Tests Capt Gregg Kastman MD-11 Flt Trng Sup.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #24 Agenda 06/12-06/13/2013 Boeing – Arlington, VA.
Presented to: By: Date: Federal Aviation Administration DCIT 41 Plenary Mark Patterson, FAA, AFS June 2015 Flight Standards Update.
182a_N00FEB23_DG 1 Local Area Augmentation System CONCEPT OF OPERATIONS Alaska Regional Briefing Anchorage October 1, 2002.
Presented to: By: Date: Federal Aviation Administration DCIT 40 Plenary Mark Patterson, FAA, AFS April 2015 Flight Standards Update.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #23 Plenary 05/09/2013 To: DCIT By: Gregg Anderson.
CY Segment 1 Phase 1 Tower Services Initial En Route Services Departure Clearances (DCL) Transfer of Communications Initial Check-In.
Federal Aviation Administration Data Comm Production Summary vs. Trials: Presented To: DCIT WGs By: Production Sub-Team Date: March 13, 2014.
TTI Performance Evaluation Training. Agenda F Brief Introduction of Performance Management Model F TTI Annual Performance Review Online Module.
BSBPMG501A Manage Application of Project Integrative Processes Manage Project Integrative Processes Unit Guide Diploma of Project Management Qualification.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT 37 Plenary Agenda December 10, 2014 Harris Corp Washington, DC.
Harris.com 02/01/2014 – 02/28/2015 Alex Murray | Systems Engineer DCIT 39 Plenary Health Monitoring Stats.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: AOC WG From: Data Comm Production Sub-Team Date: 08/22/12.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: DCIT AOC WG From: Data Comm Production Sub-Team Date: 2/1/13.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCL Trials ”T e s t S t a t u s” Presented to:DCIT, Meeting #18 Presented.
© 2013 Gartner, Inc. and/or its affiliates. All rights reserved. Gartner is a registered trademark of Gartner, Inc. or its affiliates. The Value Review.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #22 Plenary 03/14/2013 To: DCIT By: Gregg Anderson.
Copyright © 2013 Boeing. All rights reserved. FaST | PNST | AOE Status: MD-11 issue AOEmodifiedEOT_RT_Template.ppt | 1.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #25 Agenda 07/17-07/18/2013 Harris Corp – Washington, D.C.
FAA NextGen Data Comm Tower Service: CPDLC DCL New Operator Introduction.
DCIT Document Hierarchy End-to-End Procedures and operational system features effecting multiple organizations Systems Integration Document Detailed system.
Presented to: DCIT Flight Deck Working Group By: Andy Fry, Thane Inc. Date: October 12, 2011 Federal Aviation Administration Data Communications DCIT #10.
COPYRIGHT © 2013 BOEING. ALL RIGHTS RESERVED Identifying potential service enhancements to increase operator participation DCIT May 2013 Brad Cornell.
International Civil Aviation Organization
EWR DCL Flight Tests Capt Gregg Kastman MD-11 Flt Trng Sup
Data Communications Implementation Team (DCIT)
Data Comm Departure Clearance End To End Summary: (DCIT #27 WG)
FANS (Future Air Navigation System) Flight Crew Procedures
Data Communications Program
15-19 Nov 2010 Rockville, MD – Lockheed Martin
AHT Title Goes Here Name (s), Organization, CEOS Affiliation
Operational Context and Use Case Focus Group
Presentation transcript:

BOEING is a trademark of Boeing Management Company. Copyright © 2011 Boeing. All rights reserved. OMWG and All Working Groups DCIT-39 report out 11 March 2015 EOT_RT_Template.ppt | 8/1/2011 1

Engineering, Operations & Technology | Boeing Research & Technology Copyright © 2011 Boeing. All rights reserved. OMWG, 10 March 2015  Trials status updated and latest statistics as previously briefed  Minimum version of avionics (FMC, CMU, ATSU, …)  Presented current recommendations for avionics versions as understood by DCIT  Will be updated with some additional lessons from the DCL Trials, and brought forward to Plenary for approval  Once approved –Will be available for airlines and their regulatory authorities to utilize –Will be updated with new issues as they occur, throughout the Program’s life cycle  IOC criteria briefed; repeat of previous material

Engineering, Operations & Technology | Boeing Research & Technology Copyright © 2011 Boeing. All rights reserved. CPDLC DCL E2E Current Version  Draft V1.1, dated 3/02/ 2015  Description  Aligned with Data Comm Program requirements as of mid-Dec 2014 (WSSD 5.0)  Includes resolved comments from All WG telecon 1/14/15 and ERWG 3/4/15  Plenary Request – approve the additions for  Arrival Transition –Current IOC: Ground system will prevent an uplink if no there is no published Arrival T- fix in the route portion, terminate any session and go to voice –Future (Waterfall): First base leg point will be valid point for entering the arrival procedure, will be uplinked as NO Transition case  Airway-Airway –Current IOC: TDLS will prevent DCL uplink for airway-airway, display to controller, terminate session, go to voice. –Future (TBD): Coordinated solution with en route. Draft approach is to insert waypoints and lat/lon.  Next Steps  Work Cleared as Filed  Update/Replace Appendix E with DCP Enhancement Request tracking numbers  Address Error message uplinks to downlink messages

Engineering, Operations & Technology | Boeing Research & Technology Copyright © 2011 Boeing. All rights reserved. High Priority Future Capabilities: #Function/TopicDescriptionIOC/Salt Lake CityWaterfallNotes 2Cleared as Field Criteria Criteria for CAF if SID or SID/transition is applied that does not change anything prior to first filed fix. If route starting with first fix after SID transition has not changed and controller adds SID or SID/Tfix, then eligible for CAF. Flight deck stakeholders think this is a hazard. Remove this. Rules relaxed to allow CAF in cases where ERAM adds or changes the SID and/or T-fix, as long as route starting with the first fix after the T-fix has not been changed.TBD Ensure no ambiguity about how a SID and transition rejoin the route. See details High Critical IOC to prevent uplink if ANY change to SID/Tfix regardless of source. 4 Error Processing and Session Management Recover from some error without terminating session. If error and go to voice, then session is also terminated. TBDNeed to clarify conditions for when avionics and ground system are recoverable. High 11 Push DCLSend approved clearance as soon as session established on controller/system approval. Provide initial clearance as response to DM25 only TBDAt P-30, after system or controller approval, send initial CPDLC departure clearance if flight has logged on. Else queue for logon and send then. High, prior to waterfall? 18 Contact Uplink - Call Request Controller request for voice contact by pilot NoneTBDNeeds operational concept clarification. Would be separate message. High for controller?.

Engineering, Operations & Technology | Boeing Research & Technology Copyright © 2011 Boeing. All rights reserved. All WG, March 2015 (En-Route “Full” Services)  Use Case team goes ‘pencils down’ on 1 May 2015  Service descriptions discussed at a top-level within multiple ERWGs  Key areas of work DCIT will focus on in updating the Routes End-to-End  Downlink requests  Tailored Arrivals  Use of “Hold” messages  Weather deviations, including follow up directions  Detailed work will be picked up after development assessments, later this year  Tailored Arrivals development work will continue now  Plenary Approval items  No “heading” messages will be included, uplink or downlink due to lack of operational utility  Understanding that only a limited number of crossing constraints will be sent –Current thinking, to be confirmed, is two message elements –More than this number will be handled via a route clearance if CPDLC is used

Engineering, Operations & Technology | Boeing Research & Technology Copyright © 2011 Boeing. All rights reserved. All WG, March 2015  Non-VDL-2 sub-networks  Kevin Swiatek, leading PARC-CWG Project on this topic, briefed All WG on approach  PARC-CWG Project is targetted for completion in  All WG agreed with the PARC-CWG approach  Regular agenda item will be added to All WG meetings to track progress and provide DCIT input to the PARC-CWG Project as required  Andrew Onken will act as the DCIT interface to the PARC-CWG  Route Loadability Rules  Documented rules being worked by the AOC team with FAA facilities briefly reviewed (previously briefed)  Plenary Approval item –Add Route Loadability Rules as an Appendix to the Production DCL End-to-End routes  En-route Risk Mitigation  En-Route Trials briefed by Andria Roney  Additional risks and potential risk mitigations will be discussed at next DCIT, in light of the definition for the trials