Review of the Gothenburg Protocol: WGSR Conclusions Review of the Gothenburg Protocol: WGSR Conclusions 8th Joint TFEIP/EIONET Meeting Dublin, 23-24 October.

Slides:



Advertisements
Similar presentations
Marion Wichmann-Fiebig II 5 Abteilungsleiterin „Luft“ 1 Review of the Gothenburg Protocol Link to potential PM control under CLRTAP: – Specifies control.
Advertisements

CLRTP PMEG Third meeting, 13 & 14 March 2006, Dessau.
Reporting of Abatement Plans 7 th EIONET Meeting 19 March 2002 Juergen Schneider.
Review of the Gothenburg Protocol – Emission quality Kristin Rypdal, TFEIP Chair.
Work of EGTEI/TFTEI on Black Carbon in the framework of LRTAP Presented by the Co-Chair of Task Force on Techno-Economic Issues Tiziano PIGNATELLI (ENEA)
1 Introduction, reporting requirements, workshop objectives Workshop on greenhouse gas and ammonia emission inventories and projections from agriculture.
Review process 2010 Katarina Mareckova, Robert Wankmueller CEIP - Centre on Emission Inventories and Projections TFEIP Larnaca,10 May 2010.
EXPERT GROUP ON AMMONIA ABATEMENT: Expectations of WGSR Richard Ballaman, Chairman Working Group on Strategies and Review Seventh meeting April 2006,
Revisions of the protocols Potential elements for strengthening emission reporting.
UNITED NATIONS ECONOMIC COMMISSION FOR EUROPE EGTEI: Mandate & Outputs expected for 2005 Expert Group on Techno-economic Issues 18 June 2004, Paris EGTEI:
Stage 3 Review: TFEIP/ETC-ACC Karin Kindbom, Martin Adams & Justin Goodwin.
Enhancement of participation of local stakeholders, key to success of CDM projects: Current rules and procedures under the CDM Fatima-Zahra Taibi, UNFCCC.
Review Work Plan for 2008 Karin Kindbom (IVL) and Martin Adams (EEA) Co-chairs of the Expert Panel on Review 8 th Joint TFEIP/EIONET meeting October.
1 Planning of the Stage 3 In-depth Review 2008 Joint TFEIP/EIONET air emissions meeting Tallinn, May 2008 Martin Adams Expert Panel on Review European.
An Update on Activities Under the Convention SB Meeting Sept 2010 EB Meeting Dec 2010 WGSR MeetingApril 2011 Chris Dore.
Impact of the EGTEI proposed ELVs on Emission Scenarios UNECE Convention on Long-range Transboundary Air Pollution Modelling analysis performed by the.
1 EMEP/CORINAIR Atmospheric Emission Inventory Guidebook Proposal to restructure and update Aphrodite Mourelatou (EEA), Eduard Dame (EC), Kristin Rypdal.
An Update from the UN/ECE EB Meeting Dec 2009 WGSR MeetingApril 2010 Chris Dore.
“Flexibility mechanisms” TFIEP - Stockholm, Sweden 2-3 May 2010 Andre Zuber European Commission Environment Directorate-General.
CLRTP particulate matter expert group Welcome to Defra and London.
Sonja Vidič EMEP SB Chairperson Joint TFEIP/EIONET Meeting and Workshop May, Bern, Switzerland.
Agenda and introduction to the session Alexander Romanov SRI Stefan Åström IVL.
Legal aspects - Overview Ad hoc Working Group on the Durban Platform (ADP) New agreement: - form - substance Design features & legal techniques.
Information on NECD and Gothenburg Protocol revisions Eduard Dame DG Environment European Commission Energy & Environment.
EGTEI – Expert Group on Techno-economic Issues History and organization Presented by Tициано ПИНЬЯТЕЛЛИ Co-Chairman of EGTEI ENEA (Italian Agency for New.
European Commission: DG Environment Streamlining and harmonizing climate change and air pollution requirements TFEIP, 23 – 24 May 2007, Dessau Eduard Dame.
“Development of the Co-operation within the Convention on Long Range Transboundary Air Pollution” Karin Kindbom IVL Swedish Environmental Research.
Baseline emission projections for the revision of the Gothenburg protocol Markus Amann Centre for Integrated Assessment Modelling (CIAM) International.
Convention on Long-range Transboundary Air Pollution: Emission reporting obligations and outputs Brinda Wachs Secretary, Task Force on Emission Inventories.
Task Force on Emission Inventories and Projections Revision of LRTAP Emission Reporting Guidelines.
1 Monitoring and assessment in Europe Joining forces between EMEP and EEA Roel van Aalst 30 May 2001.
Laurence ROUÏL Chair of the EMEP Steering Body (CLRTAP)
Task Force on Emission Inventories and Projections Emission inventory adjustments – an update TFEIP co-chairs: Chris Dore, Martin Adams and Kristina Saarinen.
Information update: EB 26 decisions (December 2008) on emissions Review/revision of the Protocols Information update: EB 26 decisions (December 2008) on.
EGTEI: Mandate & Outputs expected for 2005 Expert Group on Techno-economic Issues 19 January 2005, Laxenburg EGTEI: Mandate & Outputs expected for 2005.
Tinus Pulles & Justin Goodwin Guidebook Revision Elements for a Maintenance Plan Consultants view.
The Convention on Long-range Transboundary Air Pollution: Emission reporting obligations and outputs Brinda Wachs Secretary, Task Force on Emission Inventories.
The Convention on Long-range Transboundary Air Pollution: Revision of the Emission Reporting Guidelines Brinda Wachs Secretary, TFEIP, UNECE The Convention.
Review process 2008 Katarina Mareckova, CEIP - Centre on Emission Inventories and Projections TFEIP Tallinn, 27 May 2008.
3rd Stage Review: Lead Reviewers Experience Outline: –Objectives –Overview of technical findings –Lessons Learned/Confirmed –Value of 3 rd Stage –Lead.
UNITED NATIONS ECONOMIC COMMISSION FOR EUROPE EMISSION DATA REPORTING UNDER LRTAP Task Force on Emission Inventories and Projections: Oct. 2004,
UNECE Reporting Guidelines Approval – impact on future reporting Katarina Mareckova, 11 May 2009, Vienna TFEIP/EIONET meeting.
UNITED NATIONS ECONOMIC COMMISSION FOR EUROPE Reporting to the Convention on Long-Range Transboundary Air Pollution Brinda Wachs Environmental and Human.
TFIAM 36 th meeting Laxenburg, 6-7 October 2009 draft chairmans report available as informal document.
Inventory issues – Gothenburg Protocol – RAINS TFIEP Workshop on Emission Projections Thessaloniki, Greece, October, 2006 Zbigniew Klimont EMEP Centre.
Emep Co-operative programme for monitoring and evaluation of long-range transmissions of air pollutants in Europe Convention on Long-range Transboundary.
Progress under the Convention on Long-range Transboundary Air Pollution Twenty-ninth meeting of the Task Force on Integrated Assessment Modelling
Draft meeting conclusions From the chairs. Focus next year HM/POPs –Scientific –Review PM follow up –Updates –Task group, ancillary data –Possible link.
Task Force on Emission Inventories and Projections This Years’ Activities and Future Work TFEIP co-chairs: Chris Dore, Martin Adams and Kristina Saarinen.
STREAMLINING CLIMATE CHANGE AND AIR POLLUTION REPORTING REQUIREMENTS TFEIP – Dublin 23 – 24 October2007.
Thirtieth meeting of the Task Force on Integrated Assessment Modelling
Revision of the Emission Reporting Guidelines
Recommendations from the Stage 3 Trial Review
Outline Pre-Draft Comments: Changes: Parties Centres (users) Text
Review process in 2009 Status of reporting under NECD (2008) and CLRTAP (2009) Katarina Mareckova, Robert Wankmueller, Michael Gager TEFIP / EIONET.
Time table for revision of the NECD
Markus Amann, CIAM Status of the RAINS model development for the review of the Gothenburg Protocol.
EMEP/CORINAIR Atmospheric Emission Inventory Guidebook
Experiences from the 2006 Stage 3 trial centralised review
Status of the emission reporting guidelines
Mandate & Outputs expected for 2004
Session 7 :Conclusions & Close
Services to support the update of the EMEP EEA Emission Inventory Guidebook, in particular on methodologies for black carbon emissions.
EGTEI: Mandate & Outputs expected for 2003
News from the Convention
9th CAFE Steering Group meeting
Projections expert panel agenda
Tentative Ideas for Co-operation
Revised emission reporting Guidelines – Projection issues
Presentation transcript:

Review of the Gothenburg Protocol: WGSR Conclusions Review of the Gothenburg Protocol: WGSR Conclusions 8th Joint TFEIP/EIONET Meeting Dublin, October 2007 Tea Aulavuo Convention on Long-range Transboundary Air Pollution 8th Joint TFEIP/EIONET Meeting Dublin, October 2007 Tea Aulavuo Convention on Long-range Transboundary Air Pollution

Time schedule Protocol into force in May 2005; EB initiated 1st review in Dec. 2005; Review to be finalized by Dec. 2007; Based on review results, Parties decide on possible revision and/or other further action (at EB_25); Revision to be completed by 2009? (WGSR’s proposal) Time schedule Protocol into force in May 2005; EB initiated 1st review in Dec. 2005; Review to be finalized by Dec. 2007; Based on review results, Parties decide on possible revision and/or other further action (at EB_25); Revision to be completed by 2009? (WGSR’s proposal)

Review’s Subject and Scope (art 10) (i) Emission ceilings (Annex II) (ii) Adequacy of Protocol’s obligations (art. 3) (iii) Progress towards meeting Protocol’s objective Considering latest scientific info. on: Health effects, CLs, IA Models Technological developments and abatement techniques Changing economic conditions Review’s Subject and Scope (art 10) (i) Emission ceilings (Annex II) (ii) Adequacy of Protocol’s obligations (art. 3) (iii) Progress towards meeting Protocol’s objective Considering latest scientific info. on: Health effects, CLs, IA Models Technological developments and abatement techniques Changing economic conditions

WGSR at 40 th session (Sept 2007): a)Welcomed contributions to the review; b)Agreed with main review report, as amended; c)Requested secretariat to submit amended report to EB; d)Recommended that EB consider mandating WGSR to commence in 2008, negotiations on further obligations to reduce emissions, and present outcomes to EB in December WGSR at 40 th session (Sept 2007): a)Welcomed contributions to the review; b)Agreed with main review report, as amended; c)Requested secretariat to submit amended report to EB; d)Recommended that EB consider mandating WGSR to commence in 2008, negotiations on further obligations to reduce emissions, and present outcomes to EB in December 2009.

WGSR_40 (Sept 2007): (2) Recommended to this end to i.a: (i) Set clear environmental targets; (ii) Take into account modelled optimized scenarios (possibly differentiated); (iii) Take into account other political processes; (iv)Consider including more flexibility in annexes; (v) Explore possibility for expedited procedure to amend annexes. WGSR_40 (Sept 2007): (2) Recommended to this end to i.a: (i) Set clear environmental targets; (ii) Take into account modelled optimized scenarios (possibly differentiated); (iii) Take into account other political processes; (iv)Consider including more flexibility in annexes; (v) Explore possibility for expedited procedure to amend annexes.

WGSR_40 (Sept 2007): (3) : (f) Thanked TFIAM and CIAM; Acknowledged uncertainties in emission projections for non- EU Parties; urged Parties to ensure submission of energy and emissions projections data by 15 Feb; invited CIAM to summarize baseline emission trends for Parties and non-Parties, and abatement options for EB_25; (g) Agreed to address LVs for VOC contents in products in negotiations for further emission reduction. WGSR_40 (Sept 2007): (3) : (f) Thanked TFIAM and CIAM; Acknowledged uncertainties in emission projections for non- EU Parties; urged Parties to ensure submission of energy and emissions projections data by 15 Feb; invited CIAM to summarize baseline emission trends for Parties and non-Parties, and abatement options for EB_25; (g) Agreed to address LVs for VOC contents in products in negotiations for further emission reduction.

TFEIP input Importance of better emission and projection data! –For modelling purposes - to determine further measures needed –For reviewing compliance Main problems? Key elements for improving emission reporting? Issues to be made mandatory in poss. revised Protocol? –Identify and propose through EMEP Steering Body

Status of the Emission Reporting Guidelines 8th Joint TFEIP/EIONET Meeting Dublin, October 2007 Tea Aulavuo Convention on Long-range Transboundary Air Pollution 8th Joint TFEIP/EIONET Meeting Dublin, October 2007 Tea Aulavuo Convention on Long-range Transboundary Air Pollution

TFEIP conclusions 18 th meeting (May 2007, Dessau): (a) Agreed on technical changes to GL; and thanked EEA, ETC-ACC, EMEP centres; (b) Agreed to forward revised GL to EMEP SB_ 31 for technical acceptance; (available in 07, pending decision on legal standing and following EB endorsement) TFEIP conclusions 18 th meeting (May 2007, Dessau): (a) Agreed on technical changes to GL; and thanked EEA, ETC-ACC, EMEP centres; (b) Agreed to forward revised GL to EMEP SB_ 31 for technical acceptance; (available in 07, pending decision on legal standing and following EB endorsement)

TFEIP conclusions (2) : (c) Invited secretariat to inform Parties about revised GL in official letter initiating 2008 reporting round; (d) Agreed that reporting using revised GL and templates should start in 2009; (e) Recommended adding NEC total summary line in reporting tables; (f) Stressed further need to harmonize European reporting requirements. TFEIP conclusions (2) : (c) Invited secretariat to inform Parties about revised GL in official letter initiating 2008 reporting round; (d) Agreed that reporting using revised GL and templates should start in 2009; (e) Recommended adding NEC total summary line in reporting tables; (f) Stressed further need to harmonize European reporting requirements.

EMEP SB, 31 st session, Sept 07 considered (a) Main changes in revised GL from 2002 –Further harmonization (NEC, UNCCC) –Development of reporting nomenclature –Format of projected activity data –Requirement for transparency (IIRs) –Flexibility for defining EMEP grid (b) Status –Technical revision finalized –Open questions: legal standing, policy issues, POPs reporting (c) Implementation (as of 2009) EMEP SB, 31 st session, Sept 07 considered (a) Main changes in revised GL from 2002 –Further harmonization (NEC, UNCCC) –Development of reporting nomenclature –Format of projected activity data –Requirement for transparency (IIRs) –Flexibility for defining EMEP grid (b) Status –Technical revision finalized –Open questions: legal standing, policy issues, POPs reporting (c) Implementation (as of 2009)

EMEP SB recommendations: 31 st session, Sept 07 –Enhanced focus on projections; Parties invited to report on projections for 2030 and 2050; –Mandatory reporting of PM 10 and PM 2.5 and IIRs –EB should adopt revised GL, as basis for reporting in 2009; bearing in mind open non-technical questions for WGSR EMEP SB recommendations: 31 st session, Sept 07 –Enhanced focus on projections; Parties invited to report on projections for 2030 and 2050; –Mandatory reporting of PM 10 and PM 2.5 and IIRs –EB should adopt revised GL, as basis for reporting in 2009; bearing in mind open non-technical questions for WGSR

Legal Experts’ conclusions on Guidelines –Useful policy tool and practical guidance –Not legally binding (“should” = appropriate) –Its elements can be given legal effect (to Parties!) only through: Provisions in Convention or Protocols EB decisions (cf. 2002/10, 2005/1) Legal Experts’ conclusions on Guidelines –Useful policy tool and practical guidance –Not legally binding (“should” = appropriate) –Its elements can be given legal effect (to Parties!) only through: Provisions in Convention or Protocols EB decisions (cf. 2002/10, 2005/1)

Legal Experts’ conclusions on Guidelines –Strengthening possible through clear, concise language; –Practical measures to reinforce implementation Review of reporting; Publication of findings; Analyzing reasons for insufficient reporting; Capacity building Legal Experts’ conclusions on Guidelines –Strengthening possible through clear, concise language; –Practical measures to reinforce implementation Review of reporting; Publication of findings; Analyzing reasons for insufficient reporting; Capacity building

WGSR at 40 th session (Sept 2007): (a) Took note of legal experts’ conclusions and thanked them; (b) Reiterated importance of improving quality and comparability of emission data reported; (c) Invited legal experts to: Consult with Co-Chairs of TFEIP; WGSR at 40 th session (Sept 2007): (a) Took note of legal experts’ conclusions and thanked them; (b) Reiterated importance of improving quality and comparability of emission data reported; (c) Invited legal experts to: Consult with Co-Chairs of TFEIP;

WGSR_40 i nvited legal experts to (2): Explore possibilities, under existing enabling clauses, to give legally binding effect to GL or parts of them for Parties; Draft possible decisions for WGSR to recommend to EB for adoption in 08; Elaborate on possibilities to simplify GL language (stronger, more concise and explicit); Report to WGSR_41 in April WGSR_40 i nvited legal experts to (2): Explore possibilities, under existing enabling clauses, to give legally binding effect to GL or parts of them for Parties; Draft possible decisions for WGSR to recommend to EB for adoption in 08; Elaborate on possibilities to simplify GL language (stronger, more concise and explicit); Report to WGSR_41 in April 2008.

Further information on Convention website TFEIP website