Saint Croix Central Task Force Findings May 2, 2012.

Slides:



Advertisements
Similar presentations
Ridgefield School District Capital Facilities Plan March 9, 2010.
Advertisements

Blissfield Community Schools Strategic Plan Facilities Team.
Eastchester Union Free School District Pre-Bond Planning Presenter: Marilyn Terranova, Ph.D. – Superintendent of Schools.
An Alternative Elementary Configuration A Programmatically Progressive and Sustainable Structure.
February 16, Tonight’s Agenda  Review Assets and Challenges From Last Meeting  Review Necessary Assumptions  Look at Possible Considerations.
Design Review Planning to date Project scope summary
Committee Charter Review all available enrollment projections, building utilization and repair requirements, construction costs, and consolidation options.
Merger Study Grade Level Configurations Options and Rationale.
Hingham Public Schools Preliminary Budget Information FY 2016 Service and Facilities January 12, 2015.
School District Merger Study Crown Point Central School and Ticonderoga Central School Facilities April 17, 2013 Castallo and Silky Education Consultants.
Enrollment Data Analysis and Plans to Address Overcrowding Update to School Board February 17, 2015.
Classroom Addition Facility Planning funds to study a possible addition Enrollment Projections Increase capacity for 2300 students Program includes 19.
Dover High School Locally Funded Initiatives (LFI’s) Community Discussion Wednesday, May 4, 2011.
Office of Portfolio Management May 16, 2013 District 30 Middle School Rezoning.
Redding Board Of Education Fiscal Year Operating Budget Discussion March 5, 2015.
Porter Ranch Community School Addition Project
Accredited with “Distinction in Performance” St. Clair R-XIII School District.
Jim Ned CISD School Bond Election May 8 th, 2010.
WCA Facilities Planning February WCA Request 2 Educational Program: The Charter School’s educational program has unique facilities needs. Key.
MSAD # PROPOSED BUDGET. MSAD #11 District Goals The budget was developed to ensure implementation of the district goals and to prepare students.
College Station ISD Planning for Growth December 12, 2006.
Building for the Future of Johnston Schools Forum for Public Feedback on September 11, 2012 Bond Referendum Monday, October 29, :00 PM Summit Middle.
Fanning Howey Stuck Associates Brailsford & Dunlavey Woods Group RDI Board of Education Work Session July 10, 2014 We promise to put children first!
GPISD Steering Committee Recommendation We are recommending to the Board of Trustees that the Board call for a $117 million bond election to be placed.
Jan 31, 2005 Community Update. Jan 31, 2005 Thanks to the voters… Measure R passed with over 63% of the vote $3.87 billion for “the Safe and Healthy Neighborhood.
More Seats for Students History of Tuckahoe Capacity and APS Actions.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
August 18, 2011 Facility Master Plan Master Plan Presentation “Listen” “Listen”“Understand”“Create”
Watertown Public Schools Schools Committee Budget & Finance, and Curriculum Subcommittees January 21, 2010.
Ridgefield School District Capital Facilities Plan March 9, 2010.
BUDGET MESSAGE 2009 Salem-Keizer Public Schools. Our Values  Minimize the impact on students.  Provide security for our employees by saving jobs as.
Revision the Future Strengthening our Magnet Programs October 20, 2015.
Focus Areas Learning environments that meet the needs of today’s learners Safe and secure buildings and grounds Improve district infrastructure.
Hopkinton Public Schools FY17 Budget Proposal Learn, Create, and Achieve Together December 04, 2015.
Camas School 2016 Bond Fall 2015 A History of Caring, Quality, and Growth.
Improving Student Performance Through CTE A District-wide approach Laura Hickle Coordinator of Special Projects Sierra Sands Unified School District
Maintenance & Operations Replacement Levy and School Improvements Bond Election Day: February 9, 2016.
2014/15 CURRENT STUDENT ENROLLMENT PRESENTED TO THE BOARD OF EDUCATION JANUARY 13, Rye City School District.
$24,362, $24,894, $26,016,051 Proposed.
2007 DSISD School Bond Program DRIPPING SPRINGS INDEPENDENT SCHOOL DISTRICT Bond Election: November 6, 2007.
District Local Planning Committee Orientation Part 2 Trimble County Schools Kentucky Department of Education Division of District Support - District Facilities.
Reedley Middle College High School (RMCHS) PERMANENT FACILITY PLANNING A collaboration between Reedley College and Kings Canyon Unified School District.
Wahoo Public School District Facility Planning Update April 18, 2016.
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education Update August 18,
Budget Overview March 27, K – 3 Elementary Maintains small class sizes (19-22 students per class) Maintains current level of teaching assistants.
SCHOOL #1 BALLOT QUESTION AND PROPOSAL Fall, 2016.
Walters Middle School Conversion STEAM Magnet Proposal
Instructional Program Budget Overview for
Where Does the Money Go? Programs Expenses Developmental Debt Service
Cornwall Central School District
UPDATE: 8/8/2011 Batavia City School District
Woodbridge Township School District Referendum 2017
School #1 Ballot Question and Proposal
Facilities Update November 17, 2017
Building Enrollments & Recommended Capacities
MSAD # PROPOSED BUDGET.
Woodbridge Middle School Renovation Referendum
Ross St Elementary School Referendum
Woodbridge Township School District Referendum 2017
Minor modifications will be necessary as follows:
Board Meeting Presentation February 20, 2018
Meeting With Public January 30, 2019
Pillager Public School District Community Survey Results
Woodbridge Middle School Renovation Referendum
Where do you go from here?
Westport Public Schools
Board Meeting Presentation February 20, 2018
EAST PENNSBORO AREA SCHOOL DISTRICT
MASSAPEQUA PUBLIC SCHOOLS Board of Education Goals
Houston K-8 School Enrollment Information Report
Presentation transcript:

Saint Croix Central Task Force Findings May 2, 2012

Existing Elementary Capacity

Existing Middle School Capacity

Existing High School Capacity

Enrollment Projections

Classroom Need Scenarios

Short Term Need Classrooms to Address K-4 Growth –(3+) Classrooms –(1) Special Education Room Additional Need Pending Pressure at 9-12 Program Pressure at High School Extra-Curricular Needs In District

GROWTH MODEL BUILDING GRADE LEVELS K-5 6 Classroom Addition 26 PROJECTED STUDENT ENROLLMENT CLASSROOMS AVAILABLE CLASSROOMS NEEDED BUILDING CAPACITY MODIFIED BUILDING CAPACITY BUILDING ADDITION 32

GROWTH MODEL K Task Force K K-4 27 Actual Enrollment Projected Enrollment 641 1,372 1,400 1,486

K Task Force K K Design Construction Referendum (Fall 2014) GROWTH MODEL 1,525 1,529 1,551

K Task Force? GROWTH MODEL +8 Station Addition K K Implement Targeted Class Sizes 1,585 1,626 1,648 Move 4 th Grade Move 8 th Grade

Task Force? GROWTH MODEL K K ,672 1,709

Potential High School Addition 8 Teaching Stations –(4) Classrooms +/- –(2) Science or STEM Labs +/- –(2) Technology Labs –Scope TBD Expand / Improve Core Functions Activities & Athletics Improvements –Gymnasium Addition –Locker Room Expansion –Wrestling & Weights / Fitness Expansion Performing Arts Improvements –Auditorium Addition –Music Suite Improvements

Recommendation Classroom Addition to High School –Grade Reconfiguration to Ease Capacity Demand –Programming Improvements at Each –2013 or 2014 Referendum Review of Extra-Curricular Needs –Include Within Referendum Consider District-Wide Projects with Proposed Referendum Reconvene Task Force Fall 2012Reconvene Task Force Fall 2012 Implementation of Capital Projects –Utilize Energy Performance Funding –Maintain Existing Assets

Questions & Discussion