1 INTERCHANGE SELECTION CE 550 SPRING 2007. 2 OBJECTIVE Identify types of interchange by function and geometry Learn process for optimizing the type of.

Slides:



Advertisements
Similar presentations
PUBLIC MEETING May 12, 2011 P U B L I C I N V O L V E M E N T Project Status PHASE III Construction PHASE II Contract Plan Preparation & Land Acquisition.
Advertisements

Hot Springs Public Meeting Reconstruction of US 18 & US 385
Chapter 12 Freeway Driving.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
OPEN HOUSE PUBLIC MEETING FOR LA 86 & LA 320: ROUNDABOUT IBERIA PARISH State Project No. H Federal Aid Project No. H
Module 7 Exercise Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users.
1 Freeways and Interchanges CE453 Lecture 33 Source : A Policy on Geometric Design of Highways and Streets (The Green Book). Washington, DC. American Association.
New I-65 Interchange at Worthsville Road Welcome!.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Florida Department of Transportation, November 2009
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Mecca Roundabout Project Mecca, CA September 28, 2011.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Interchange Design Nick Hoernke, Bill Roth and Eric Sorensen.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
MODULE 6 Objectives: Students will learn about using risk reducing strategies to manage multiple-lane roads at speeds up to 65 mph in complex risk environments.
TYPES OF INTERSECTIONS OF ROAD AND DESIGN PARAMETERS OF INTERSECTION
Lec 25, Ch.7, pp : Intersection types and design principles (Objectives) Become familiar with the typical intersection types (See figures 7-1 thorugh.
Cross Sections CE 453 Lecture 22 Iowa DOT Design Manual Chapter 3.
Design Speed and Design Traffic Concepts
Introduction Transportation System Objectives : Military; Knit together the inhabitants of a territory by providing mutual access and communication; Economic.
Module 5 Displaced Left Turn (DLT) Intersections
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
 Life in communities has changed over the years.  One of those changes is in transportation. Transportation is a way of moving people or things from.
Peter Koonce TRB Annual Meeting January 9, 2005 Best Practices for Signal Operations Best Practices for Signal Operations – Lessons Learned from the Portland.
Martha Moore, P.E. Ghyabi & Associates October 10, 2014
Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users Module 8 Intersection- Interchange Evaluation Process.
INTRODUCTION Grade separation is an effective way of handling intersecting traffic with greatest efficiency, safety, capacity. An interchange is a system.
Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use.
SCOHTS Meeting Robert Pollack - FHWA April 28, 2010.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
Interchange Design Wes Mayberry Transportation Engineering Intern
Intersection Design Spring 2015.
INTRODUCTION An intersection is the general area where two or more highways join or cross, including the roadway and roadside facilities for traffic movements.
Grade separation.
ROUNDABOUTS Improving Safety and Efficiency The Ohio Department of Transportation District Clark Ave. Ashland, OH Julie Cichello, P.E. District.
Ramp Count Estimation Procedures Daniel Jenkins, PE Office of Highway Policy Information October 24, 2012.
Introduction Session 01 Matakuliah: S0753 – Teknik Jalan Raya Tahun: 2009.
Section 3 (Day 6) Basic Maneuvering Tasks: Low ,
Virginia Department of Education
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
Policy for New/Modified Access to Controlled Access Facilities.
Information Processing: Complex Risk Environments Topic 1 -- Characteristics of Expressways Topic 2 (through Lesson 1)-- Entering, Changing Lanes, and.
Intersections.
Intersection Design Chapter 7 Dr. TALEB AL-ROUSAN.
Expressway Driving Legacy High School Drivers Education.
HIGHWAY DESIGN PROCESS & ROUTE LOCATION Spring 2016.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
Geometric Design: General Concept CE331 Transportation Engineering.
1 THE HIGHWAY SAFETY MANUAL Michael S. Griffith Federal Highway Administration July 26 th, 2004.
Introduction CE331 Transportation Engineering Fall 2013 Dr. Reg Souleyrette.
Complete Streets Training
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
FHWA: Revision of Thirteen Controlling Criteria for Design; Notice for Request and Comment. Comments Due: December 7, 2015 Jeremy Fletcher, P.E., P.S.M.
Preserving the Lost Art of Geometric Design: Tools, Techniques and Talent TRB Workshop - January 23, 2011 Understanding the Art Mark Doctor, PE Federal.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Intersection Design Spring 2017.
UNIT 3 Foundations of Effective Driving
The I-465 West Leg Reconstruction Project
Evaluation and Re-Design Haifa and Yafa Streets.
Project Management Team Meeting #3
INTERCHANGE DESIGN Fall 2017
Interchanges Ch. 6.
Technical Committee on Geometric Design
Module 6 A 21st Century Transportation Network
Presentation transcript:

1 INTERCHANGE SELECTION CE 550 SPRING 2007

2 OBJECTIVE Identify types of interchange by function and geometry Learn process for optimizing the type of interchange for a specific site

3 Just what is an interchange? An interchange is a system of interconnecting roadways in conjunction with one or more grade separations that provides for the movement of traffic between two or more roadways or highways on different levels. (AASHTO “Green Book” 2001) Basically it is a grade-separated intersection, with connections between 2 or more roads

4 But first, two categories… Service interchange – freeway to surface street System interchange – freeway to freeway

5 What’s on the Interchange menu? Diamond Single-point urban interchange Partial cloverleaf Full cloverleaf Trumpet Directional

6 Your Basic Diamond

7 Source: Empire State Roads.com

8 When to use Service interchange only (why?) Mostly rural locations Low volumes

9 Is a diamond anyone’s best friend? Plusses: –Lower ROW needs than most –Excellent in low volume situations, especially where volumes not expected to increase –Low cost –Most common (overall, 79%)

10 Is a diamond anyone’s best friend? Minuses: –Two ramp termini may be problem with high volume side roads –May require signalization at ramps; delay issues due to signals on arterial side road –High exiting volumes may require excessively long ramps

11 Diamond Variants Half diamond Tight urban diamond (aka single-point urban interchange) Diamond with roundabout

12 Diamond Variants Half-diamond, West Des Moines IA Source: Google Earth

13 Diamond Variants Source: Center for Transportation Research & Training (KSU)

14 When is a diamond not a diamond? When it’s a parclo (partial cloverleaf) A diamond with one to three loops

15 Partial Cloverleaf Aka parclo Service interchange (7%) Higher volumes than diamond Variety of arrangements Diagonally opposite most common

16 Parclo Layouts Source: AASHTO “Green Book”

17 About Parclos Use with high turning volumes or side road volumes Exit – low-speed loop reinforces need to slow down Entrance – low-speed loop increases difficulty of entering high-speed traffic

18 About Parclos Site constraints (topography, development, etc) suggest preferred configuration Remember driver expectancy and work load Loops make for less direct turning movements and longer paths

19 And now, the full Cloverleaf Loops and ramps in all four quadrants Service interchange (9%) as well as system interchange (29%) Higher volumes and speeds

20 And now, the full Cloverleaf Source: AASHTO “Green Book”

21 Cloverleaf Issues Out of route (long) paths for loop users Very land intensive Merging and weaving sections become problems when volumes increase Multiple exit points – signing and safety problems

22 Cloverleaf Issues Need constant radius loops (some older ones tightened up at end) Need C-D roads to address high- volume weaving and merging as well as multiple exit points

23 Trumpets Limited ROW Low volumes Service (1%) or system (3%) Limited applicability

24 Trumpets Source: AASHTO “Green Book”

25 Single-Point Urban Interchange Aka “SPUI” Less ROW More $$ Signalization benefits About 1% of service interchanges

26 Single-Point Urban Interchange Source: AASHTO “Green Book”

27 Single-Point Urban Interchange

28 Usually dual lane ramps (higher volumes) Good arterial signal progression Somewhat unfamiliar, operationally Large skew angles increase costs Not pedestrian friendly Single-Point Urban Interchange

29 Directional Interchange Direct paths for all (most) movements Most expensive Land intensive System interchanges only (52%)

30 Directional Interchange

31 Directional Interchange

32 Source: Virginia Transportation Research Council (1999)

33 The Proper Interchange… Selection is very site specific Requires considerable experience A lot of things to consider

34 The Process Basics Data collection Evaluation and analysis Two general conditions

35 The Process – Basics New or existing Number of legs Functional class of all roadways General environment

36 The Process – Data Collection ADT (and traffic projections if available) Crash history Land uses Design criteria Community impact data

37 ADT Projections from planning agency’s model Applying historic growth data to current ADT Traffic impact analyses data Traffic composition (esp. trucks & buses) Pedestrian and bicycle needs

38 Traffic Forecasting Procedure varies with circumstances

39

40

41

42 Crash History Primarily on existing facilities Data for both roadways Five years minimum for projects not related to crash problems As many years as possible for projects aimed at solving crash problems

43 Land Uses Existing and proposed in immediate area Changes expected by jurisdiction (city?) not in MPO model If new interchange consider likelihood of added growth

44 Design Criteria Level-of-service Design speed Superelevation Lane widths, especially for ramps Ramp geometry

45 Community Impacts Amount of right-of-way available Number and approximate value of homes in proximity Public buildings and facilities affected Access to adjacent properties Wetlands

46 Others Soils information Other improvements programmed Interchange spacing ITS strategies

47 Basic Design Criteria All exits and entrances on right side Single exit per interchange Proper ramp spacing Lane balance and basic number of lanes

48 Selection Process Flow Charts Service interchanges System interchanges

49 Source: Virginia Transportation Research Council

50 Source: Virginia Transportation Research Council

51 Source: Virginia Transportation Research Council

52 Evaluation and Analysis Four broad categories –Operations and safety –Project costs –Constructability and maintenance of traffic –Social and environmental impacts

53 Evaluation and Analysis Operations and safety –Vehicular and non-motorized safety –Level-of-service for projected traffic –Flexibility in accommodating future traffic (when projections are exceeded)

54 Evaluation and Analysis Costs of improvements –Right-of-way –Construction –Impact mitigation (e.g., wetlands) –Operations (maintenance)

55 Evaluation and Analysis Constructability Maintenance of traffic Ability to add improvements

56 Evaluation and Analysis Social and environmental effects –Air, noise, water, etc. –Economic –Land use changes –Public transportation

57 Process – Step 1 Look at all forms of interchanges Screen for suitability (fatal flaws) Documentation

58 Source: Freeway and Interchange Geometric Design Handbook (ITE)

59 Process – Step 2 Develop scaled concepts –remaining candidate forms –sketch plans Evaluate data Compare to criteria (matrix?) Advance reduced number

60 Source: Freeway and Interchange Geometric Design Handbook (ITE)

61 Source: Freeway and Interchange Geometric Design Handbook (ITE)

62 Process – Step 3 Prepare functional layout plan and profile Cross-sections Bridge TS&L Maintenance of traffic Costs (ROW and construction)

63 Process – Step 3 Operational analysis (simulation) Evaluation and comparison of alternatives Final selection of preferred alternative PUBLIC INVOLVEMENT THROUGHOUT!

64 Documentation Design Study Report Interchange Justification Report Interchange Modification Report

65 Design Study Report Source: Freeway and Interchange Geometric Design Handbook (ITE)

66 Design Study Report Source: Freeway and Interchange Geometric Design Handbook (ITE)

67 Federal Requirements Source: Freeway and Interchange Geometric Design Handbook (ITE)

68 Federal Requirements Source: Freeway and Interchange Geometric Design Handbook (ITE)

69 IJR/IMR Source: Freeway and Interchange Geometric Design Handbook (ITE)

70 Caveats No substitute for experience Public involvement throughout Often no “right” answer Frequently many “wrong” answers