PICAYUNE STRAND RESTORATION PROJECT PUMP STATIONS PRELIMINARY DESIGN South Florida Water Management District Water Resources Advisory Committee April 6,

Slides:



Advertisements
Similar presentations
City of Fargo Mickelson Field Area Flood Risk Management – Project 5902 Public Information Meeting November 19, 2012.
Advertisements

A section has been added regarding Stream Restoration Design Criteria: A. Designs for stream restoration try to mimic natural conditions present in stable.
Flood the Sugar Cane Farms Now to Save the Estuaries: Is This Feasible ? Water Resources Advisory Commission January 5, 2006 Meeting.
ROUTE 27 (PARK STREET) CORRIDOR SEWER EVALUATION Mark J. Thompson, P.E. Gus O’Leary Kleinfelder / S E A Consultants Inc.
City of Fargo Mickelson Field Area Flood Risk Management – Project 5902 Public Information Meeting July 12, 2012.
Vance County Water District Overview and Update Jordan McMillen Director Vance County Planning and Development Department 156 Church St. Suite 3 Henderson,
Florida Water Forum Everglades Restoration June 3, 2011.
Preparing for the Rainy Season SFWMD Operations & Actions.
The South Florida Watershed
US Army Corps of Engineers BUILDING STRONG ® FOLSOM DAM MODIFICATIONS APPROACH CHANNEL EIS/EIR Major Robert Dion and Cameron Sessions Project Managers.
C51 RESERVOIR PROJECT UPDATE Design, Permitting and Coordination NOVEMBER 10, 2014.
Comprehensive Everglades Restoration Plan Picayune Strand Restoration Project Janet Starnes, Principal Project Manager Office of Everglades Policy and.
Expedited Projects + Innovative Teamwork = Measurable Improvements to the Health of Lake Okeechobee and the St. Lucie and Caloosahatchee Estuaries.
OKLAHOMA STATE UNIVERSITY Biosystems and Agricultural Engineering Department Hydrology 101 OKLAHOMA STATE UNIVERSITY Biosystems and Agricultural Engineering.
Agricultural Pond Private Engineering Resources & Costs Agricultural Water Resource Development Workshops Presented by: Cavanaugh & Associates P.A. 530.
National Park Service - DOI Everglades National Park Everglades Restoration Update: Water Quality, Central Everglades and Tamiami Trail Next Steps Project.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
L-THIA Long-Term Hydrologic Impact Assessment Model ….provides relative estimates of change of runoff and non point source pollutants caused due to land.
June 26, PCWA - Middle Fork Project Project Operations
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
Engineering Technology Division
Proposed Improvements to the Water System Infrastructure in the Anacostia Area of Washington, D.C. November 20, 2002 Prepared by Prepared for Our Customers,
Environmental Quality Incentives Program (EQIP) Grazing – Our Most Commonly Used Conservation Practices.
Sustainable Development: Practical Solutions to Real World Problems Fishkill, NY November 7, 2012 Low Impact Development and Rainwater Harvesting Solutions.
Professional Engineering Services For Restoration Project John Mitnik, P.E. Engineering & Construction Bureau Chief Operations, Maintenance & Construction.
Three Rivers Levee Improvement Authority (TRLIA) Briefer: Mary Jane Griego, TRLIA Board Member Three Rivers Levee Improvement Authority March, 2007.
SKAGIT COUNTY SHORELINE REGULATIONS Planning Commission Workshop April 3, 2012.
Cost Allocation Studies for the MP Region Bureau of Reclamation April 29, 2008 Central Valley Project Cost Allocation Study Update Public Meeting #2: October.
St. Lucie and Indian River Counties Water Resource Study Mark Elsner, P.E., Director Water Supply Development Division Mark Elsner, P.E., Director Water.
BMT Designers & Planners 1 Wind Farm Technology: Is it the Answer? National Defense Industrial Association (NDIA) 30 th Environmental and Energy Symposium.
Henning Roedel Civil and Environmental Engineering Department Stanford University November 25, 2008.
The Hydrometeorology Testbed Network. 2 An AR-focused long-term observing network is being installed in CA as part of a MOA between CA-DWR, NOAA and Scripps.
Selecting the Right Site for New Nuclear Generation Southern Nuclear Operating Company Tom Moorer – Nuclear Development Environmental Manager.
U.S. Army Corps of Engineers In partnership with the South Florida Water Management District Water Management in South Florida.
Middle Fork Project Project Description April 25, 2006.
1 New Orleans District Morganza to the Gulf 23 May 2008 Carl Anderson, Senior Project Manager, USACE.
Urban Storm Drain Design: Pump Station Design. Purposes To lift stormwater to higher elevation when discharge of local collection system lies below regional.
1 Potential Project Betterments to be studied further during Relicensing June 20, 2006 Stakeholder Meeting Middle Fork American River Hydroelectric Project.
WRAC Issues Workshop EAA/STA-2 Expansion Cell 4 April 11, 2005 Acceler8 Overview.
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
Proposed Amendments to Chapter 32 Article V Solid Waste Management and Chapter 38 Zoning 5:01 P.M. Public Hearing Presented by the Orange County Environmental.
CE 424 HYDROLOGY 1 Instructor: Dr. Saleh A. AlHassoun.
Climate Change and Water Resources Planning Kim Shugar Department Director Intergovernmental Programs Kim Shugar Department Director Intergovernmental.
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007.
Lee County Water Resource Initiative: Community Sustainability Committee June 16, 2010 Kurt Harclerode Operations Manager Lee County Natural Resources.
WRAC Acme Basin B Discharge Project February 2, 2006.
Utility Engineers, PC.  Generation  Transmission  Distribution.
Central & Southern Florida Project George Horne Deputy Executive Director Operations & Maintenance Resource Area.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
ERCOT Generation Drought Best Practices Workshop Water Conservation Practices for Texas Generators February 27, 2012.
Proposed Revisions to the Long-Term Plan Long-Term Plan Communications Meeting August 25, 2004 Gary Goforth Chief Consulting Engineer South Florida Water.
1 1 City Commission Workshop for the DRAFT Basis of Design Report December 14, 2015 CRAVEN THOMPSON & ASSOCIATES, INC.
1 September 13, 2007 North-of-the-Delta Offstream Storage ACWA Regions 9 and 10 Carlsbad Water Summit North-of-the-Delta Offstream Storage ACWA Regions.
Suwannee-Satilla Drainage Basin: Flood Control Issues and Requested Action Suwannee-Satilla Regional Water Planning Council Douglas, GA December 8, 2010.
Water Management Options Analysis Sonoma Valley Model Results Sonoma Valley Technical Work Group October 8, /08/2007.
Susan Sylvester Department Director Operations Control Department Mechanics of the Primary Water Management System.
South Florida Ecosystem Restoration Projects 1. Seminole Big Cypress 3. Modified Water Deliveries 5. C-111 South Dade 10. C-111 Spreader Canal 13. Broward.
15 Water Supply. 15 Objectives (1 of 2) Discuss rural water supplies. Describe how portable tanks are used to supply water for firefighting. Describe.
Beth Kacvinsky - Lead Project Manager Office of Everglades Policy and Coordination March 1, 2016 IRL-S / C-44 Overview.
Preliminary Engineering Analysis and Design Foxcroft Colony and Mosby Woods Condominiums Prepared for: City Council Work Session November 3, 2015.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
US Army Corps of Engineers BUILDING STRONG ® Flood Fighting and Planning US Army Corps of Engineers Omaha District Joel Ames Tribal Liaison.
GOING WITH THIS? WHERE (ARE WE) (AM I) Merle Anders
Upland Landfill Waste Discharge Application 7295 Gold River Highway
Construction Report March 25, 2010.
Louisiana Coastal Area
Fab-Five Projects New Orleans FY19-FY23
Presentation transcript:

PICAYUNE STRAND RESTORATION PROJECT PUMP STATIONS PRELIMINARY DESIGN South Florida Water Management District Water Resources Advisory Committee April 6, 2006

Contents  Project Overview  Introduction to Pump Stations  Pump Station Preliminary Design  Schedule  Issues and concerns  Discussion

U.S 41 6L levee Recommended Plan 3 Spreader Canals 3 Pump Stations Canal Plugs 80% of Roads Removed Primary All Weather Roads Secondary Roads Flood Protection Levees ELEMENTS MILES I Management Roads 810 cfs 2650 cfs Private Lands Levee POI N levee POI SE levee POI SW levee MILLER CANAL FAKA UNION CANAL MERRITT CANAL PRAIRIE CANAL 1250 cfs

Design Activities Preliminary Design Pump Stations Road Removal BODR Development Spreader Canals Protection Levees

Pump Stations  Sized for 100 Year Storm Event  Merritt – 810 cfs  Miller – 1250 cfs  Faka Union – 2650 cfs  Designed to Meet CERP and SFWMD Standards  155 mph wind load  Diesel drives  Ten day fuel supply  Minimal Reliance on Outside Utilities  Diesel engines and generators  Remote Control and Operations Capability

Hydrologic Design Criteria  Match Canal Stage Hydrographs at I-75 For 5-Day, 100-Year Design Storm Event  No Pump Operation Below Minimum Canal Levels at I-75: Wet Season Dry Season (ft NAVD88)(ft NAVD88) Miller Canal Faka Union Canal Merritt Canal

Schedule Initiate Design12/04 Complete Design11/06 Start Construction1/07 Construction Complete12/08 Operational Testing4/09

Pump Stations Opinion of Probable Cost  PIR (Oct 2004) $67.5M (25% Contingency)  BODR (Sept 2005) $76.8M (30% Contingency)  Prelim Design (Mar 2006) $109.5M (25% Contingency)  Differences (BODR vs. Current Estimate) :  Installation of Major Equipment Added$5.6M  Additional Design Detail Reveals Additional Costs$1.5M  Use of Stainless Steel (Per District Stds.)$1.2M  Poor Soil Conditions – Requires More Site Preparation$9.2M  Additional Contingency Related Dollars$8.6M  Concrete Volume & Cost Per CuYd Under Estimated$6.6M  Potential Savings by using portable pumps for redundancy$7.0M

Stakeholder Issues and Concerns (Pump Stations)  Capacity and operation of pump stations  Hardy Pit is not a storage reservoir  Redundant pump capacity included  Pump Station operation will mimic existing structures  Impacts to wildlife due to noise, lighting, and towers

Stakeholder Issues and Concerns (other Project Features)  Location and sizing of protection levees is being addressed in a separate BODR.  Project will not change water quality  Working with DOF ; recreational opportunities will be consistent with DOF Land Management Plan  Additional modeling is being done to determine if there are impacts to Tamiami Trail  Pump stations will be operated in accordance with the Permit criteria and Operation Plan  All modeling will be completed before Final Design  Uplands and Wetlands were both used as criteria in determining Project benefits