C51 RESERVOIR PROJECT UPDATE Design, Permitting and Coordination NOVEMBER 10, 2014.

Similar presentations


Presentation on theme: "C51 RESERVOIR PROJECT UPDATE Design, Permitting and Coordination NOVEMBER 10, 2014."— Presentation transcript:

1 C51 RESERVOIR PROJECT UPDATE Design, Permitting and Coordination NOVEMBER 10, 2014

2 C51 RESERVOIR LOCATION

3 C-51 Reservoir Benefits ►Existing rock mine with unique geological features ►Location is ideally suited for a multitude of water resource benefits ►Utilizes existing infrastructure for conveyance with some improvements

4  Augmenting existing water supplies  Improving flood control in western Palm Beach County  Enhancing water quality protection for the Everglades  Reducing harmful discharges to Lake Worth Lagoon  Mitigating saltwater intrusion  Protecting against drought  Mitigating climate change impacts C-51 Reservoir Benefits

5  The project could be eligible for a long-term permit (S. 373.236(5), F.S. and as a Preferred Water Source (S. 373.2234 F.S.)  As a multi-jurisdictional project, it is expected that the C-51 Project would rank highly for alternative water supply funding under the "Water Protection and Sustainability Program" (S. 403.890, F.S.)  Potential for permit modifications vs. a new permit C-51 Reservoir Benefits

6 C-51 Reservoir Operations 3 Cell 9, 10 Cell 11 Cell 12 Cell 13 Cell 14 Cell 16 Cell 18 C51 Phase 2 Area C51 Phase 1 Area L8 FEB Cell 5 Cell 1+2 Cell 4 Cell 3 Cell 7 Cell 6 L8 Pump Station L8 Inflow Gate Structure L8 Canal Southern Blvd L8/C51 Connection L8 Canal FPL Electrical Generation Plant L8 Flow Direction C51 Reservoir L8 FEB

7 Consistency with CERP/ Regional Availability/ Restoration Strategies SFWMD

8 C-51 Reservoir Sources L8 excess/M1 Basin Consistency with CERP/Regional Availability/Restoration Strategies

9 1965 C51 RESERVOIR

10

11

12

13 CONVEYANCE C-51 Reservoir

14 C51 RESERVOIR

15

16 C51 Reservoir Status  Design  Reservoir – Complete  L8 Reservoir Connection and Control Structure – Complete  Pump Station – Preliminary design criteria being established  Broward County Pump Station – Locations being researched  Stormwater Retention Area – Design 99%. 100% pending SFWMD Permit review.

17 C51 Reservoir Status  Permitting  ERP – Received  CUP – Submitted and RAI received  Response is being prepared  RAI requested identification of end users  Stormwater Retention Area – Application submitted, RAI received, response pending

18 C51 Reservoir Status  Construction  Pending Allocation Agreements and commitments from end users  Pending all permits  Construction duration expected to take 24 months after start  Target start date May 2015

19 C-51 Reservoir Costs MWH Construction Cost June 2014$106,782,793 Project Management/Fees 1,067,828 Engineering, design, permitting and CM 17,085,247 Interest during construction at 6% 7,785,249 Value at 12% of construction cost 12,813,935 LWDD projected initiation cost 350,000 LWDD canal user fee 380,160 Total$146,265,212 PBA Aggregates Estimate January 2013 - $150,500,000

20 C-51 Reservoir Costs – Additional Items Since Estimates  Coffer Dam  East Rip Rap placed in the wet  Rip Rap volume and product change  Guard Rail  Boat Ramp  C51 Top Off Pump Station  Broward County Canal Pump Station  Cost Escalation since May 2014

21 C51 Reservoir Next Steps  Utility Letters of Intent  MWH Estimate of Additional Items  Conclude Reservoir Permitting  Utility Demand Projections (updated & extended)  Utility Permitting  Capacity Allocation Agreements  Set Construction Start Date

22 Questions