Aerojet Environmental Update Carmichael Town Hall Meeting March 12, 2008 Michael Girard Aerojet Environmental Site Remediation (916) 355-2945

Slides:



Advertisements
Similar presentations
T HE O THER C OSTS OF THE P ROJECT Things to Consider When Planning New Work 12 th Annual International Aboveground Storage Tank Conference & Trade Show.
Advertisements

Public Health - Always Working for a Safer and Healthier Washington Washington State Department of Health Division of Environmental HealthOffice of Drinking.
BoRit Superfund Site Timeline
Presentation to the Lahontan Regional Water Quality Control Board June 8, 2011 Project Update Groundwater Remediation Project Hinkley Gas Compressor Station.
Reuse / Revitalization. What is Reuse / Revitalization? Restoring contaminated and potentially contaminated sites to productive use.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
PROPOSED REGIONAL GROUNDWATER REMEDIAL ACTION ROOSEVELT IRRIGATION DISTRICT June 11, 2010.
AHMET UCANOK JOHN E. ELVIS Pump and Treat of Contaminated Groundwater at the United Chrome Superfund Site Corvallis, Oregon.
Metropolitan Council Environmental Services A Clean Water Agency Presented to the Environment Committee November 9, 2010 Information Item Master Water.
Town Hall Meeting 12 March 2008 Carmichael Area Aerojet Groundwater Remediation Progress Update 12 March 2008.
California Recycled Water Plan California Recycled Water Plan A comprehensive approach to California’s long-term water supply By Gregory B. Ryan and Meagan.
An Overview.  To provide information about the partnering process that the VDEQ Federal Facilities Restoration Program implements  To explain the benefits.
SOLAR IMPACT ON FYI Kevin Meikle, Architect Airports Planning Manager 4995 E. Clinton Way Fresno, Ca (559)
Green Remediation An Overview of the State of the Practice
Cornerstone Engineering Group The Foundation for Your Civil Engineering Needs Camanche Reservoir Water Treatment Plant Project Cecilia Zamora Evangelina.
 UAB Vilniaus waters - the largest water company in Lithuania, which operates not only in the city of Vilnius, but also the district, Svencionys and.
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
1 Recycled Water Program for the City of Los Angeles.
Chris M. Kapheim General Manager May 5, AID Groundwater Map.
Jim Heitzman General Manager Marina Coast Water District
NIBW Superfund Site Integration of Groundwater Extraction with a Superfund Remedy.
Feasibility of Aquifer Storage and Recovery in the Upper Colorado River Basin Presented by: Western Water & Land, Inc. Grand Junction, Colorado.
Chapter 1 Project Management Concepts. 22 Learning Objectives Definition of a project and its attributes Key constraints within which a project must be.
Carmichael Town Hall Meeting Western Groundwater Operable Unit - Update 12 March 2008 Alexander MacDonald (RWQCB)
Governor’s Strategic Growth Plan Flood Protection and Clean, Safe, Reliable Water Supply Bond and Financing Acts of 2006 and 2010 Southern California Water.
Integrated Regional Watershed Management Plan Presentation – March 12, 2013 HLVRCD.
Integrated Regional Watershed Management Plan Presentation – November 21, 2013 HLVRCD.
FISCAL YEAR Discussion on Mid-Year Budget Adjustment: SAN JOAQUIN COUNTY DELTA ACTIVITIES 1 Tom Gau, Interim Director San Joaquin County Department.
Former DuPont Barksdale Works Project Update May 19, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
PowerButte: Solar Overlay Tim Snellings, Director Department of Development Services Photo courtesy of Shamim Mohamed A Place For Clean Energy.
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
1 Update Ocean Desalination Feasibility Studies Karl Seckel Assistant General Manager.
South Orange Coastal Ocean Desalination (SOCOD) Project Dana Point/Doheny Beach, California November 2010 Status.
UC Berkeley Richmond Field Station Remediation and Restoration Project January 16, 2008 Town Hall Meeting Agenda 1.Project Background 2.Recent Activities.
Withlacoochee Regional Water Supply Authority Withlacoochee Master Regional Water Supply Planning and Implementation Program (WMRWSPIP) Technical Review.
Maximizing Water Supply Sustainability for the Goleta Valley Ryan Drake Water Supply and Conservation Manager 2015 Central Coast Sustainability Summit.
Corrective Action Program: Working with Your Local Agency to Solve Local Problems James Clay County of San Diego Department of Environmental Health Site.
EPA’s Enforcement Perspective on Superfund Site Reuse Hollis Luzecky Office of Site Remediation Enforcement, U.S. EPA.
Is the Mid-Atlantic Region Water Rich? Presentation to 5 th Mid-Atlantic Regional Planning Roundtable November 7, 2008 Joseph Hoffman, Executive Director.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
Water Supply Planning in Hampton Roads: Options for an Uncertain Future The State of Virginia’s Water Resources October 28, 2015 Whitney S. Katchmark,
Stephanie Lyn Koehne Amec Foster Wheeler Environment & Infrastructure, Americas (Amec Foster Wheeler) Phoenix-Goodyear Airport- North (PGA-North) Superfund.
Santa Rosa Plain Groundwater Management Situation Assessment Jay Jasperse, Sonoma County Water Agency Gina Bartlett, Center for Collaborative Policy January.
Introduction to Phoenix-Goodyear Airport Superfund Site
Santa Rosa Plain Groundwater Management Planning Update Fall 2013.
Metropolitan Council Water Supply Planning in the Northwest Metro Water Availability Technical Focus Group : June 9, 2008 Lanya Ross Senior Environmental.
EPA P-1 Institutional Control Tracking EPA Superfund Perspective November 2006.
1 EASTERN MUNICIPAL WATER DISTRICT Water Supply Strategic Plan Brian Jack Powell, P.E. Director of Planning June 17, 2015.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
Showcase cost-saving practices, scale- appropriate technologies, and economic development opportunities and case studies from Idaho communities. Provide.
1 EASTERN MUNICIPAL WATER DISTRICT Cactus II Feeder Transmission Pipeline Joe Mouawad, PE Sr. Director of Engineering September 2, 2015.
Water Reclamation Plant Feasibility Study Update July 23, 2014.
AES HUNTINGTON BEACH ENERGY PROJECT
GWRS Final Expansion Project and SP-173 Update GWRS Steering Committee Meeting April 11, 2016.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
Perris Water Filtration Plant Membrane Upgrade – Phase I
Protecting the Quality of our Water
Groundwater Remediation Status
Water Reclamation Plant Feasibility Study Update May 28, 2014
Sacramento County Stormwater Quality Program
Desirable Results Since 1998
Jim Flechtner, PE Executive Director April 26, 2018
SEQRA as a Tool to Review Energy Projects
Chapter 1 Project Management Concepts
City of Sunrise Wastewater Reuse Program
Status after Second Year of Work Implementing the Recommendations of the Santa Cruz Water Supply Advisory Committee Joint Meeting Santa Cruz City Council.
Board of Public Utilities August 17, 2017
CBEWP Chino Basin Conjunctive Use Environmental
Sacramento County Stormwater Quality Program
Presentation transcript:

Aerojet Environmental Update Carmichael Town Hall Meeting March 12, 2008 Michael Girard Aerojet Environmental Site Remediation (916)

Aerojet’s Goals for Remedial Action Shared Goals - Aerojet and Stakeholders –Meet EPA and State of California goals and objects –Protect the community’s drinking water resources –Halt migration of chemicals –Restore the aquifer Minimize disruption to Carmichael community Partnership with regulators, local government, water district and the community –Community outreach –Proceed with the timely planning and implementation of Groundwater Remediation –Identify opportunities for beneficial use of treated water

Path to Successful Implementation Collaborative Approach to Response –Carmichael Water District (CWD) –Aerojet Corporation –Federal and State Agencies (EPA, DTSC, RWQCB) –Sacramento County Board of Supervisors Parks Water Resources Real Estate Development of Mutual Benefits as Part of Project Scope

Path to Successful Implementation Unique approach to problem solving Carmichael Water District with full support from its Board quickly responded –Teamed with Aerojet to seek win-win solutions –Protect the Water Supply –Engage with multiple stakeholders –Protect the interests of the Community –Push for timely resolution Innovative use for treated water benefited CWD customers and the Parks Multiple project paths resulted in the completion of the Bajamont plant while issues with Ancil Hoffman were resolved

How the Cleanup Process Works Groundwater contamination moves with groundwater flow Groundwater Resource Protected Surface Water Western Groundwater Movement Extraction well intercepts and stops plume movement Extracted groundwater is piped underground to treatment facility Cleaned groundwater is piped underground to discharge point and returned to environment Enclosed treatment filters remove contamination

Western Groundwater Operable Unit Area 3 Northern Rancho Cordova Area 1 Southern Rancho Cordova Area 2 Gold River (Completed) US HWY 50 SUNRISE BLVD. Aerojet GET E/F (Completed) INTERNATIONAL DRIVE FOLSOM BLVD. Area 4 Carmichael Legend Completed Extraction Well Completed Treatment Facility Completed Pipeline Approximate Aerojet Boundary Proposed Extraction Well Proposed Treatment Facility Proposed Pipeline Water Supply Well

Carmichael Remedial Action (Area 4) Palm Dr. Landis Ave. Bajamont GET L-B Fair Oaks Boulevard Ancil Hoffman GET L-A Action Needed to Protect Water Supply Wells Ancil Hoffman Treatment Facility under Design Sunrise Boulevard Bajamont Facility Complete, and Operating Extraction Well Water Supply Well Treatment Plant

Ancil Hoffman GET L-A Design Considerations Established residential and recreational area Minimal impact to Community (short and long-term) Limited available land to site well and treatment plant Use of County land for locating extraction well (s) and treatment plant Design goals –Minimize visual impacts in natural setting –Minimal impacts to various park uses and activities –Compatible with existing golf course structures Floodway constraints Integrate design with CWD Storage Tank Project

Conceptual GET L-A Treatment Plant

GET L-A Schedule Summary Design, Bidding, Contract Award Now thru June 2008 Receive Bids / Award ContractsJune 2008 Complete Well and PipelinesJuly thru Nov 2008 CWD Constructs Reservoir Mar thru Nov 2008 Start Treatment Plant Construction Nov 08 or April 2009

Accomplishments Bajamont Treatment Plant constructed and operating Ancil Hoffman Treatment Plant location selected Environmental Documents complete and approved (CEQA) Lease agreement with County complete and approved Extraction well and monitor wells constructed Preliminary facility design complete Treated water discharge permit approved (NPDES)

System Designed for Flexibility Treatment Plant –Planned flow of ~ –Plant capacity as built ~ Extraction Wells –Planned pumping rate ~ –Well capacity is ~ Ancil Hoffman 800 gpm 2000 gpm 800 gpm 1200 gpm Bajamont 600 gpm 1000 gpm 600 gpm 840 gpm

Next Steps Complete Construction Facility start-up and optimization process takes 1-6 months Once system has operated for ~ 1 year an Effectiveness Evaluation is performed and a report is provided to the Agencies Possible System Adjustment (if necessary) –Modify pumping rates in existing wells –Modify treatment plant equipment –Install new extraction well (s) with associated pipelines

Thanks for your Time and Interest ! Questions?

Future Questions or Concerns? Aerojet Contact: Tim Murphy Director, Public Affairs (916)