Cornerstone Engineering Group The Foundation for Your Civil Engineering Needs Camanche Reservoir Water Treatment Plant Project Cecilia Zamora Evangelina.

Similar presentations


Presentation on theme: "Cornerstone Engineering Group The Foundation for Your Civil Engineering Needs Camanche Reservoir Water Treatment Plant Project Cecilia Zamora Evangelina."— Presentation transcript:

1 Cornerstone Engineering Group The Foundation for Your Civil Engineering Needs Camanche Reservoir Water Treatment Plant Project Cecilia Zamora Evangelina Reyes Kathryn Garcia Michael Bockrath 03/10/04 Camanche Reservoir South Shore (CASS) Camanche Reservoir North Shore (CANS) Progress Update

2 Overview Project Review Alternatives Problems Regulations Systems Costs Schedule Update Summary

3 Project Review Objectives – Single Water Treatment Plant Serving both South Shore and North Shore Supply pipeline through Camanche reservoir to existing North Shore storage tanks – Minimum Capacity 0.5 Million Gallons Per Day 100% redundancy – Expandable to up to 2 Million Gallons Per Day – Water quality regulations Current and Future – Reduce O&M cost

4 Project Review (continued) Existing Proposed

5 Project Review (continued) Scope – Existing conditions – Regulations Small Systems – Analysis Sustainability Constructability Cost – Negative Declaration – EBMUD regulations – Calculations, specifications, and drawings

6 Overview Project Review Alternatives Problems Regulations Systems Costs Schedule Update Summary

7 Alternatives Discarded Options – No Build Option – Retrofit of Existing Plants – New Consolidated Plant North Shore Location –Raw water from Camanche reservoir –Raw water from Mokelumne Aqueduct –Groundwater

8 Alternatives (continued) Remaining Alternatives – South Shore Location Groundwater Raw water from Camanche reservoir Raw water from Mokelumne Aqueduct

9 Overview Project Review Alternatives Problems Regulations Systems Costs Schedule Update Summary

10 Allocation of time – Environmental assessment Research and data collection – Exempt from county regulations No response from main office in Oakland – Difficulty in obtaining data for systems Specifications Costs Problems

11 Overview Project Review Alternatives Problems Regulations Systems Costs Schedule Update Summary

12 Regulations Surface Water Treatment Rule – Long Term 1 Enhanced Surface Water Treatment Rule Total Coliform Rule Contaminants – Stage 1 Disinfection By-Product Rule – Filter Backwash Rule – Chemical Monitoring Rule – Radionuclides Public Notification/ Consumer Confidence Reports

13 Overview Project Review Alternatives Problems Regulations Systems Costs Schedule Update Summary

14 Systems Conventional Treatment Bag and Cartridge Membrane Filtration – Micro Filtration – Ultra Filtration – Nano Filtration – Reverse Osmosis

15 Systems (continued) General Filtration Characteristics

16 Overview Project Review Alternatives Problems Regulations Systems Costs Schedule Update Summary

17 Costs Budgetary System Costs – Complete System Costs – Operation and Maintenance Costs Values provided by Montgomery Watson Trade-offs – Set of Trade-offs – Trade-off Analysis

18 Costs (continued) System Costs – Complete membrane systems Microfiltration: $1.5 Million +10% Ultrafiltration: $2.5 Million +10% Nanofiltration: $3 Million +10% Reverse Osmosis: $3 Million +25% * Prices do not include building facility or installation

19 Costs (continued) Estimated O&M costs for membrane systems COMPLETE SYSTEM OPERATION AND MAINTENANCE COSTS (membrane elements, piping and tubing, valves, pumps, and control equipment) Labor (backwash, filter cleaning, visits) PowerChemical costs Microfiltration$50,000 to $100,000$10k to $20k$60k to $90k Ultrafiltration$50,000 to $100,000$10k to $20k$60k to $90k Nanofiltration$50,000 to $100,000$30k to $60k$80k to $120k Reverse Osmosis$50,000 to $100,000$40k to $90k$90 to $140k

20 Costs (continued) Set of Trade-offs – Identifying Key Measures of Effectiveness – Evaluating the Alternatives – Perform trade-offs with cost as an independent variable Trade-off Analysis – One illustration of the Trade-off analysis

21 Acceptable

22 Overview Project Review Alternatives Problems Regulations Systems Costs Schedule Update Summary

23 Schedule Update

24 Overview Project Review Alternatives Problems Regulations Systems Costs Schedule Update Summary

25 Single Water Treatment Plant - South Shore Location - Mokelumne Aqueduct water source - Membrane filtration system

26 Questions